Drill Results
Auriginal Identifies Fresh Mineralization Targets at Roger Project Through 3D Modeling, Indicating Resource Upgrade Potential

AUME · Price
Executive Summary
- Auriginal Mining released a preliminary 3‑D model of the Roger Project that identifies new VMS‑type targets and suggests the historic Cu‑Au mineralization may extend ≥200 m to the NE and at depth below 350 m.
- The model highlights a volcanic dome/cryptodome core with strong geophysical anomalies on its SW and NE flanks, supporting a Cu‑Zn‑Au‑Ag VMS system analogous to Agnico Eagle’s LaRonde Mine.
- Based on these insights, the company revised its upcoming diamond drill program (8 holes, total 5 154 m) slated to start in early March 2026 to test depth continuity and newly identified targets.
Key Details
- 3‑D Model Findings
- Mineralization appears truncated NE by a NNW‑striking fault; displacement of alteration envelope suggests up‑dip continuation of porphyry Cu‑Au mineralization ≥200 m east of the fault.
- Historical drilling validation shows no depth limit to ~350 m, indicating potential for deeper extensions.
- Thickest zone aligns with the core of a volcanic dome/cryptodome; strongest BHEM (Borehole EM) response on SW and NE flanks.
-
Geophysical results corroborate VMS interpretation (Cu‑Zn‑Au‑Ag).
-
Comparative Geology
-
Structural and mineralogical similarities drawn to the LaRonde Mine (Agnico Eagle), reinforcing a high‑grade VMS prospectivity.
-
Revised Diamond Drill Program (Table 1)
| Hole | Easting | Northing | Elevation (m) | Azimuth | Dip (°) | Extension (m) | Target Depth (m) | Revised Final Depth (m) |
|---|---|---|---|---|---|---|---|---|
| 2026‑001 | 542 678.7 | 5 534 716 | 378.71 | 153 | –65 | 80 | 527 | 667 |
| 2026‑002 | 542 443.6 | 5 534 629 | 378.45 | 153 | –65 | 75 | 516 | 650 |
| 2026‑003 | 542 222.3 | 5 534 514 | 379.13 | 153 | –65 | 50 | 515 | 622 |
| 2026‑004 | 541 967 | 5 534 466 | 380.68 | 153 | –65 | 100 | 524 | 687 |
| 2026‑005 | 541 750.9 | 5 534 329 | 379.90 | 153 | –65 | 60 | 527 | 646 |
| 2026‑006 | 541 551 | 5 534 248 | 375.34 | 160 | –65 | 60 | 525 | 644 |
| 2026‑007 | 541 332.8 | 5 534 128 | 374.91 | 160 | –65 | 40 | 523 | 619 |
| 2026‑008 | 541 096.9 | 5 534 043 | 373.52 | 160 | –65 | 40 | 523 | 619 |
-
Total Planned Drilling Depth: 5 154 m (revised).
-
Planned Start Date: Early March 2026.
-
Qualified Person: Charles Beaudry, P.Geo (1202) and géo. (311), NI 43‑101 qualified.
Notable Quotes