Northwire Canada EditionTuesday, September 15, 2026
Northwire
GOLD 4351.90 −1.3% SILVER 63.76 −2.2% COPPER 6.40 −2.3% OIL 101.39 +1.3% PALLADIUM 1296.50 −2.1% QGR 0.200 +0.0% MSC 0.015 −25.0% GENM 0.705 −0.7% URC 3.89 +0.0% SHL 0.400 +4.6% AZS 0.750 −8.5% FL 0.415 +0.0% HMMC 8.29 −1.1% NAR 0.260 −5.5% GCN 0.030 −14.3% RIO 3.54 −1.4% EVI 0.430 +2.4% CTV 0.110 −4.3% ECOR 3.10 −4.0% TLG 2.20 +0.0% UCU 2.59 +2.8% GOLD 4351.90 −1.3% SILVER 63.76 −2.2% COPPER 6.40 −2.3% OIL 101.39 +1.3% PALLADIUM 1296.50 −2.1% QGR 0.200 +0.0% MSC 0.015 −25.0% GENM 0.705 −0.7% URC 3.89 +0.0% SHL 0.400 +4.6% AZS 0.750 −8.5% FL 0.415 +0.0% HMMC 8.29 −1.1% NAR 0.260 −5.5% GCN 0.030 −14.3% RIO 3.54 −1.4% EVI 0.430 +2.4% CTV 0.110 −4.3% ECOR 3.10 −4.0% TLG 2.20 +0.0% UCU 2.59 +2.8%
Technical Study

Chatham receives OK from three landholders for RailPhos

NZP · Price

Executive Summary

  • Chatham Rock Phosphate Ltd. has commenced a feasibility study to build a railway linking its wholly‑owned Korella North mine to a new phosphate export facility at the Port of Karumba.
  • Initial stakeholder engagement is complete: face‑to‑face meetings with three landholders covering ~120 km of the proposed route have been held and received support.
  • Site assessments with Queensland Rail identified a preferred starting point east of Cloncurry, while an alternative western start point is also under consideration to avoid a river crossing.

Key Details

  • Feasibility study led by Executive Director Colin Randall (Australia).
  • Contact made with all landholders along the proposed rail corridor; three key landholders representing ~120 km have been met in person and expressed support.
  • On‑site inspection of existing Queensland Rail infrastructure east of Cloncurry conducted; consensus reached on a starting point for the Cloncurry‑to‑Karumba line.
  • Alternative western start location being evaluated to eliminate the need for a crossing of the Cloncurry River north of town.
  • Public outreach:
  • Panel discussion on logistics and phosphate at the Mines Conference in Cloncurry (12 Sept 2025).
  • Presentation delivered to the Townsville Summit Conference (9 Oct 2025).
  • Interview with ABC Northwest Radio aired multiple times, generating positive feedback.
  • The feasibility study remains ongoing; Chatham Rock will issue regular progress reports.

Notable Quotes

(No direct quotes provided in the release.)

Read the original news release →

More from Chatham Rock Phosphate Limited