Northwire Canada EditionWednesday, July 29, 2026
Northwire
NAM 0.250 +0.0% CRD 0.065 +8.3% OLA 12.90 −3.7% CG 22.70 −2.5% EQX 12.89 −4.0% FM 37.51 −2.3% MNRG 0.080 −11.1% KFR 1.31 +0.8% AUMN 0.275 +0.0% GLB 0.250 +0.0% BHS 0.045 −10.0% EGR 0.025 +0.0% RIO 2.59 −4.1% GEN 0.070 +0.0% MAI 4.39 −2.0% RYR 0.175 +0.0% NAM 0.250 +0.0% CRD 0.065 +8.3% OLA 12.90 −3.7% CG 22.70 −2.5% EQX 12.89 −4.0% FM 37.51 −2.3% MNRG 0.080 −11.1% KFR 1.31 +0.8% AUMN 0.275 +0.0% GLB 0.250 +0.0% BHS 0.045 −10.0% EGR 0.025 +0.0% RIO 2.59 −4.1% GEN 0.070 +0.0% MAI 4.39 −2.0% RYR 0.175 +0.0%
Drill Results

MULTIMEDIA UPDATE - Eloro Resources Reports the Longest and Highest-Grade Tin Intersection Obtained thus far in Drilling at its Iska Iska Project, Potosi Department, Bolivia with 213.00 Metres Grading 0.51% Tin (Sn)

ELO · Price

Executive Summary

  • Eloro announced assay results from five definition drill holes (DSB‑80, DSB‑84, DSB‑85, DSB‑86, DSB‑87), expanding the known hydrothermal system to ~800 m × 500 m × 500 m deep.
  • The most notable intercept is a 213 m interval grading 0.51 % Sn and 25.46 g/t Ag (DSB‑87) – the longest, highest‑grade tin zone reported to date at Iska Iska.
  • Multiple high‑grade silver, zinc, lead, gold and tin zones were intersected across the five holes, confirming both Tin and Polymetallic domains are open laterally and down‑dip, supporting potential resource expansion for a future PEA.

Key Details

  • DSB‑87 (Tin Domain) – 213 m @ 0.51 % Sn, 25.46 g/t Ag; broader 241.5 m @ 0.47 % Sn, 23.17 g/t Ag; includes 1.18 % Sn over 34.5 m and 238.4 g/t Ag & 1.55 % Sn over 4.5 m.
  • DSB‑80 (Polymetallic Domain) – Highlights include 53.10 g/t Ag over 15 m, 30 g/t Ag over 9 m, 0.30 % Sn & 3.01 g/t Au over 0.75 m, and 1.44 % Zn over 6 m.
  • DSB‑84 – 31.62 g/t Ag over 16.5 m (incl. 108.80 g/t Ag over 3 m); 34.85 g/t Ag over 3 m; 0.49 % Sn over 1.5 m.
  • DSB‑85 – Multiple high‑grade silver zones, e.g., 38.26 g/t Ag over 22.5 m (incl. 65.60 g/t Ag over 10.5 m), 198.08 g/t Ag over 9 m, and extensive lower‑grade tin intervals up to 30 m @ 0.20 % Sn.
  • DSB‑86 – Long Zn–Pb interval: 0.81 % Zn & 0.80 % Pb over 241.5 m (incl. 1.56 % Zn & 0.98 % Pb over 100.5 m); also 52.8 g/t Ag & 1.30 % Pb over 7.5 m and 81 g/t Ag over 6 m.
  • Footprint Expansion: System dimensions now ~800 m (strike) × 500 m (width) × 500 m (depth), up 100 m in strike and cross‑strike versus the August 2025 release.
  • Drilling Summary: Total of 2,346 m reported for the five holes; 6,242 m drilled to date in this definition phase (12 holes). Assays pending on two additional holes (1,025 m).
  • True Width Adjustment: Core true width ≈ 80 % of measured length.
  • Qualified Person: Dr. Osvaldo Arce, P.Geo., reviewed and approved all technical content per NI 43‑101.
  • Analytical Labs: ALS (Bolivia & Lima) and AHK (Tupiza & Lima) with standard QA/QC protocols.

Notable Quotes

“We are pleased with the steady progress of our drilling operations at Iska Iska…long higher‑grade intercepts, including 213 m grading 0.51 % Sn and 25.46 g/t Ag…These results underscore the importance of this phase of drilling in unlocking additional value for our shareholders.” – Tom Larsen, CEO

“The dynamic nature of hydrothermal events … is very encouraging…the mineralization encountered … is very encouraging. We are optimistic that additional drilling will further delineate the mineralized zone and potentially confirm larger extensions both laterally and at depth.” – Dr. Osvaldo Arce, EVP Operations, Latin America

Read the original news release →

More from Eloro Resources Ltd.