Northwire Canada EditionThursday, August 13, 2026
Northwire
CD 0.245 +8.9% DRY 0.310 +1.6% PAAS 73.10 +1.3% S 0.250 −2.0% VOXR 7.22 −0.4% NFG 2.32 +0.0% MFG 3.70 +0.0% ITH 3.90 +1.8% DML 4.59 +0.0% SEVA 0.285 −5.0% CLM 0.055 −8.3% ORE 2.65 −0.4% OOR 0.050 +0.0% MJS 0.095 −5.0% DBG 2.01 −1.0% MOG 0.630 +8.6% CD 0.245 +8.9% DRY 0.310 +1.6% PAAS 73.10 +1.3% S 0.250 −2.0% VOXR 7.22 −0.4% NFG 2.32 +0.0% MFG 3.70 +0.0% ITH 3.90 +1.8% DML 4.59 +0.0% SEVA 0.285 −5.0% CLM 0.055 −8.3% ORE 2.65 −0.4% OOR 0.050 +0.0% MJS 0.095 −5.0% DBG 2.01 −1.0% MOG 0.630 +8.6%
Drill Results

Talon Metals completes 14,000 m of drilling in Michigan

TLO · Price

Executive Summary

  • Talon Metals is transitioning its drill fleet from Michigan to the Tamarack project in Minnesota, expanding the fall/winter 2025‑2026 exploration program at the Vault zone.
  • The company has completed ~14,000 m of drilling toward the 25,000 m Stage 1 earn‑in target needed for a 51 % interest in a 400,000‑acre land package near the Eagle mine.
  • The Lundin exclusivity agreement was terminated; Talon will repay the $5 M advance and issue ~18.5 million shares to Lundin at a deemed price of C$0.3762 per share.

Key Details

  • Exploration Strategy: Leveraging winter conditions in Minnesota (frozen ground, less snow) versus Michigan’s heavy snowfall to increase drill productivity.
  • Drilling Progress – Michigan: ~14,000 m completed; target 25,000 m by Aug 2027 to satisfy Stage 1 earn‑in for a 51 % interest in the UPX Minerals land package (≈400,000 acres).
  • Boulderdash Discovery (Michigan):
  • Since June 2024, identified multiple high‑grade Ni‑Cu sulphide targets; first discovery announced Oct 2024.
  • 2025 drilling: ~7,900 m in 27 holes; sulphide mineralization intersected in 11 holes, including massive sulphides to 190 m depth.
  • Roland Target (Michigan): ~1,500 m drilled in three holes to improve stratigraphic understanding and conduct borehole EM surveys.
  • Assay Work: Core logging continues at L’Anse core shed; assay results expected through winter 2025/26.
  • Rig Relocation: Remaining Michigan rigs are being mobilized to Tamarack; two rigs already active on the Vault zone, with full fleet slated for fall/winter expansion.
  • Vault Zone (Minnesota): Full drill fleet will focus on expanding drilling at the Vault zone through spring 2026.
  • Lundin Agreement Termination: Exclusivity agreement terminated; Talon to repay $5 M U.S. advance and issue 18,502,906 common shares to Lundin at C$0.3762 per share (subject to TSX approval).
  • Future Plans – Michigan 2026 Program:
  • Continue defining Boulderdash mineralization along ~1.5 km strike of magnetic anomaly.
  • Advance toward the 25,000 m Stage 1 earn‑in requirement for full ownership interest.
  • Four additional drill pads prepared along the magnetic anomaly for accelerated exploration.
  • Qualified Person: Dr. Etienne Dinel, VP Geology, qualified under NI 43‑101, reviewed and approved all technical information.

Notable Quotes

“We are executing our strategy of leveraging seasonality — shifting from Michigan snow to Minnesota ice — to maximize drill production and significantly expand drilling at the Vault zone through spring 2026.” – Henri van Rooyen, CEO, Talon Metals Corp.


Materiality Assessment: Material – Positive (significant operational progress, advancement toward earn‑in target, and a material transaction with Lundin).

Read the original news release →

More from Talon Metals Corp.