Drill Results
TDG Gold mobilizes second drill rig to GSN project

TDG · Price
Executive Summary
- TDG Gold Corp. has mobilized a second drill rig to its fully‑financed Greater Shasta‑Newberry (GSN) project to accelerate testing of newly defined exploration targets.
- The first near‑vertical hole (645 m deep) is complete; core samples are en route to the assay lab and results will be released when available.
- Drilling this year will follow ~100 m spacing to delineate the scale of potential mineralization associated with the adjacent Freeport‑Amarc Aurora (1) Cu‑Au‑Ag discovery.
Key Details
- Second drill rig mobilized: Expected to begin drilling by the end of the week, operating alongside the existing rig near the AuWest target (west of Aurora (1)).
- First hole completed: Near‑vertical orientation, final depth 645 m; purpose – confirm extension of Aurora (1) mineralization onto TDQ’s GSN property and evaluate a gold‑in‑soil anomaly coincident with IP response.
- Assay status: Core from Hole 1 is being expedited to the laboratory; results will be released when appropriate.
- 2025 drilling plan: Spacing of approximately 100 m between holes to efficiently define mineralization scale; step‑out spacing may be refined based on geological interpretation.
- Geophysical context: 2025 induced polarization (IP) survey, supported by airborne and ground magnetics, identified upper and lower anomalies sharing characteristics with Aurora (1). The upper anomaly aligns with the elevation of Aurora (1).
- Qualified person review: Technical content approved by Steven Kramar, MSc, PGeo, Vice‑President Exploration, qualified under NI 43‑101.
- Project background: GSN project is a 100% owned 50,000‑ha land package in the Toodoggone district; adjacent to Freeport‑McMoran/Amarc’s Aurora (1) discovery.
Notable Quotes
(No direct quotes were provided in the release.)
More from TDG Gold Corp.
Jun 30, 2026 · 07:00