Northwire Canada EditionThursday, July 30, 2026
Northwire
ITR 3.01 +4.9% CS 13.25 +3.5% EMO 0.325 +1.6% CAN 0.050 −9.1% MOON 7.40 +3.4% FG 0.035 +0.0% SBMI 0.125 +0.0% CNC 1.58 +15.3% ALS 59.07 +0.1% SRA 0.780 +0.0% FCI 0.430 +30.3% AUXX 7.30 +8.8% SGQ 0.350 +0.0% TECK 87.53 +8.2% BIG 0.770 +30.5% PTU 0.320 −3.0% ITR 3.01 +4.9% CS 13.25 +3.5% EMO 0.325 +1.6% CAN 0.050 −9.1% MOON 7.40 +3.4% FG 0.035 +0.0% SBMI 0.125 +0.0% CNC 1.58 +15.3% ALS 59.07 +0.1% SRA 0.780 +0.0% FCI 0.430 +30.3% AUXX 7.30 +8.8% SGQ 0.350 +0.0% TECK 87.53 +8.2% BIG 0.770 +30.5% PTU 0.320 −3.0%
Production / Operations

Aura Announces Preliminary Q3 2025 and 9M 2025 Production Results, Reaching Record Highs

ORA · Price

Executive Summary

  • Aura Minerals reported Q3 2025 preliminary production of 74,227 gold‑equivalent ounces (GEO), a 16% increase versus Q2 2025 and 9% above Q3 2024.
  • The company achieved its first commercial production at the Borborema mine, delivering 10,219 GEO in September with a recovery rate >92%.
  • Nine‑month (9M) 2025 production reached 203,592 GEO at guidance prices, positioning Aura within its 2025 guidance range of 266,000–300,000 GEO and on track for the full‑year target.

Key Details

  • Total Q3 2025 Production (Current Prices): 74,227 GEO
  • +16% vs. Q2 2025
  • +9% vs. Q3 2024
  • Constant‑price Q3 2025 Production: 74,227 GEO (17% increase QoQ)
  • 9M 2025 Production (Guidance Prices): 203,592 GEO – +3% versus 9M 2024 and within the company’s guidance range.

Mine‑by‑Mine Highlights

Mine Q3 2025 GEO QoQ % Change YoY % Change*
Aranzazu 21,534 –12% (price impact) –12% (price impact)
Minosa 18,138 +1% –13% (rainfall & stacking)
Almas 15,088 +17% +1% (higher ore processed)
Apoena 9,248 +13% +15% (recovery & tonnage)
Borborema 10,219 N/A (first commercial) N/A

*YoY % Change reflects conversion to GEO at current metal prices; price fluctuations affect the GEO metric.

  • Aranzazu – Constant Prices: 62,046 GEO for 9M 2025 (+4% YoY)
  • Minosa – Constant Prices: 53,831 GEO for 9M 2025 (–9% YoY)
  • Almas – Constant Prices: 41,107 GEO for 9M 2025 (+10% YoY)
  • Apoena – Constant Prices: 26,343 GEO for 9M 2025 (–12% YoY)

Production by Metal (Aranzazu – Q3 2025)

  • Gold: 6,707 oz (‑3% QoQ)
  • Silver: 141,117 oz (+3% QoQ)
  • Copper: 9,726 k lbs (+2% QoQ)
  • Molybdenum: 105 k lbs (new production)

Notable Operational Milestones

  • Borborema achieved commercial production in September 2025, delivering >10k GEO with a recovery rate >92%, confirming the ramp‑up schedule.
  • Almas plant expansion contributed to a 17% QoQ increase in GEO output.
  • Apoena realized a 95% recovery rate, driving its 13% QoQ production uplift.

Notable Quotes

“We are pleased to announce a record high quarter of strong performance across our operations… A key milestone was the start of commercial production at Borborema, which delivered over 10,000 ounces with a recovery rate above 92%, setting the stage for a steady ramp‑up.” – Rodrigo Barbosa, CEO & President


All figures are preliminary and subject to final verification.

Read the original news release →

More from AURA MINERALS INC. J