Northwire Canada EditionMonday, August 3, 2026
Northwire
S 0.140 +0.0% BNKR 4.40 −2.2% QRO 0.045 +0.0% VCT 0.075 +36.4% PPP 1.15 +0.9% LMG 0.390 +0.0% GRDM 0.140 +0.0% ABRA 13.58 −4.1% WHY 0.295 +1.7% HHH 3.94 −0.2% COS 0.060 +0.0% NOB 0.065 −23.5% MEK 0.055 +0.0% TGOL 0.105 −4.5% FCI 0.400 −7.0% SGQ 0.350 +0.0% S 0.140 +0.0% BNKR 4.40 −2.2% QRO 0.045 +0.0% VCT 0.075 +36.4% PPP 1.15 +0.9% LMG 0.390 +0.0% GRDM 0.140 +0.0% ABRA 13.58 −4.1% WHY 0.295 +1.7% HHH 3.94 −0.2% COS 0.060 +0.0% NOB 0.065 −23.5% MEK 0.055 +0.0% TGOL 0.105 −4.5% FCI 0.400 −7.0% SGQ 0.350 +0.0%
Technical Study

NexMetals Drills 210 Metres of 1.06% CuEq

NEXM · Price

Executive Summary

  • NexMetals announced assay results from two additional drill holes (SMET‑25‑001 and SMET‑25‑004) completing a 12‑hole metallurgical drilling campaign at the Selkirk Cu‑Ni‑Co‑PGE deposit in Botswana.
  • Both holes intersect wide intervals of continuous mineralization with CuEq grades up to 1.28 % over more than 70 m, extending beyond the current Mineral Resource Estimate (MRE) and inside the conceptual open‑pit shell, indicating potential resource expansion and low strip‑ratio pit development.
  • The results bring the total announced metallurgical holes to four, reinforcing the deposit’s scale, grade consistency, and near‑surface amenability for open‑pit mining.

Key Details

  • Hole SMET‑25‑004 – 210 m interval of 1.06 % CuEq (0.40 % Cu, 0.36 % Ni, 0.59 ppm Pd, 0.14 ppm Pt) including a higher‑grade sub‑interval of 74 m at 1.28 % CuEq.
  • Hole SMET‑25‑001 – Starting 13 m below surface: 45 m interval of 0.69 % CuEq (0.23 % Cu, 0.23 % Ni, 0.46 ppm Pd, 0.10 ppm Pt).
  • Both intercepts lie outside the current MRE but within the conceptual pit shell, supporting potential expansion toward the surface.
  • Current cut‑off: US$25/tonne net smelter return (≈0.46 % CuEq); all reported intervals exceed this threshold.
  • Total metallurgical drill holes announced to date: four (previously released on 2025‑09‑18).

Assay Summary (selected intervals)

Hole ID From (m) To (m) Length (m) Cu (%) Ni (%) Pd (ppm) Pt (ppm) CuEq (%)
SMET‑25‑001 13.00 65.70 52.70 0.22–0.47 0.23–0.57 0.46–0.68 0.10–0.13 0.68–1.38
SMET‑25‑004 66.00 276.00 210.00 0.36–0.52 0.36–0.47 0.58–0.80 0.14–0.18 1.02–1.40

Drill Collar Information

  • SMET‑25‑001: Easting 575,502.8; Northing 7,642,676.4; Elevation 993.9 m; Dip ‑89.8°; Azimuth 17.5°.
  • SMET‑25‑004: Easting 575,406.7; Northing 7,642,671.8; Elevation 1,000.7 m; Dip ‑88.1°; Azimuth 14.2°.

Technical & QA/QC

  • Program executed by Discovery Drilling (Boyles 56). Core HQ, quartered for analysis. Labs: ALS Chemex (Johannesburg) and Blue Coast Research (metallurgical testing).
  • QC includes commercial blanks and certified Cu/Ni sulphide standards every 20 samples.

Qualified Person

  • Sharon Taylor, VP Exploration, MSc, P.Geo – qualified under NI 43‑101 and Regulation S‑K.

Notable Quotes

“These results position Selkirk as a standout asset, reinforcing the substantial scale of the deposit… The broad intervals of higher grades across widely spaced holes underscore both size and consistency.” – Morgan Lekstrom, CEO & Director


All forward‑looking statements are subject to risks and uncertainties detailed in the release.

Read the original news release →

More from NexMetals Mining Corp.