Northwire Canada EditionTuesday, September 22, 2026
Northwire
GOLD 4383.90 −0.9% SILVER 66.53 −0.9% COPPER 6.79 +1.5% OIL 92.37 −3.9% PALLADIUM 1319.50 +0.0% MSC 0.020 +0.0% BRON 0.050 +0.0% ELD 59.44 −1.4% GBML 0.220 +0.0% SUM 1.59 +0.0% ABC 0.015 +0.0% ELE 30.45 +2.2% CDE 27.46 −0.7% LIB 0.990 +1.0% SLVR 1.17 +0.0% NVO 0.075 −6.2% BRO 0.235 +2.2% FMAN 0.415 +0.0% HVG 0.050 +0.0% MSV 0.540 +16.1% SCD 0.185 −2.6% GOLD 4383.90 −0.9% SILVER 66.53 −0.9% COPPER 6.79 +1.5% OIL 92.37 −3.9% PALLADIUM 1319.50 +0.0% MSC 0.020 +0.0% BRON 0.050 +0.0% ELD 59.44 −1.4% GBML 0.220 +0.0% SUM 1.59 +0.0% ABC 0.015 +0.0% ELE 30.45 +2.2% CDE 27.46 −0.7% LIB 0.990 +1.0% SLVR 1.17 +0.0% NVO 0.075 −6.2% BRO 0.235 +2.2% FMAN 0.415 +0.0% HVG 0.050 +0.0% MSV 0.540 +16.1% SCD 0.185 −2.6%
Technical Study

Marimaca Copper Files NI 43-101 Technical Report for the Previously Announced Marimaca Oxide Deposit Feasibility Study

MARI · Price

Executive Summary

  • Marimaca Copper Corp. filed its NI 43‑101 Feasibility Study technical report for the Marimaca Oxide Deposit (MOD) in Chile.
  • The report, prepared by Ausenco Chile Ltda., validates and expands on the feasibility results announced on August 25, 2025.
  • Availability: posted on the company website and SEDAR+ as of the effective date (August 25, 2025).

Key Details

  • Report Scope: Technical report for the MOD supporting the Feasibility Study disclosed earlier.
  • Standards: Prepared in accordance with National Instrument 43‑101 disclosure standards for mineral projects.
  • Effective Date: August 25, 2025 (the same date as the original feasibility announcement).
  • Access: The full report can be accessed at www.marimaca.com and via the company’s SEDAR+ profile (sedarplus.ca).
  • Project Context: MOD is an IOCG‑type copper deposit; Marimaca continues definitive feasibility work while exploring its >15,000 ha Sierra de Medina property block.

Notable Quotes

(No direct quotes were provided in the release.)

Read the original news release →

More from Marimaca Copper Corp.