Northwire Canada EditionSaturday, October 31, 2026
Northwire
⌕
Gold 3,898.90 −3.3% Silver 49.28 −5.9% Copper 6.48 −1.8% Oil 104.12 +2.1% Palladium 987.70 −1.7% HCH 1.25 −3.9% CRD 0.040 −20.0% ENEV 0.005 +0.0% MOON 5.23 −7.9% ORE 2.56 −4.8% ASE 0.620 −14.5% LKY 0.005 + SOI 0.165 −5.7% ECR 0.190 −5.0% OZ 0.240 −9.4% ELEC 0.110 +4.8% WHY 0.260 −3.7% PHD 0.030 −33.3% OMI 0.220 −10.2% EML 0.105 +0.0% TECT 1.37 −2.8% Gold 3,898.90 −3.3% Silver 49.28 −5.9% Copper 6.48 −1.8% Oil 104.12 +2.1% Palladium 987.70 −1.7% HCH 1.25 −3.9% CRD 0.040 −20.0% ENEV 0.005 +0.0% MOON 5.23 −7.9% ORE 2.56 −4.8% ASE 0.620 −14.5% LKY 0.005 + SOI 0.165 −5.7% ECR 0.190 −5.0% OZ 0.240 −9.4% ELEC 0.110 +4.8% WHY 0.260 −3.7% PHD 0.030 −33.3% OMI 0.220 −10.2% EML 0.105 +0.0% TECT 1.37 −2.8%

The Desk

AI-assisted analysis on every release · Page 290
  1. Drill Results

    Gold X2’s Moss infill drilling confirmed wider, lower-grade intercepts, highlighting bulk tonnage potential while leaving resource economics dependent on scale and grade.

    Jun 30, 2026 · 07:01 · AUXX · Gold X2 Mining Inc. · Routine +

    01
  2. Resource Estimate

    Cristina Resource Update Validates Dual Mining Strategy as Talamore Advances Yukon and Mexico Assets

    Jun 30, 2026 · 07:01 · TALA · Talamore Mining Corp. · Routine +

    02
  3. Drill Results

    Eureka Metals Advances Polymetallic & Titanium Exploration Post-Stairway Acquisition, Eyes Q3 Drilling

    Jun 30, 2026 · 07:01 · ERKA · Eureka Metals Corp. · Neutral

    03
  4. Resource Estimate

    Surge Battery Metals files an updated mineral resource estimate for its Nevada North Lithium Project, establishing a baseline for the preliminary feasibility study while holding a $75 million cash reserve.

    Jun 30, 2026 · 07:01 · NILI · Surge Battery Metals Inc. · Routine +

    04
  5. Drill Results

    Lahontan’s Santa Fe project faces challenges from low-grade oxide resources and a going-concern warning that test faith in its 2027 production timeline.

    Jun 30, 2026 · 07:00 · LG · Lahontan Gold Corp. · Routine +

    05
  6. Other

    Management launches strategic review as margin compression and tariff headwinds drive stock to multi-month lows.

    Jun 30, 2026 · 07:00 · SUGR · Sucro Limited · Neutral

    06
  7. Production / Operations

    Emerita delays the IBW prefeasibility study to Q3 2026 to incorporate metallurgical optimizations.

    Jun 30, 2026 · 07:00 · EMO · Emerita Resources Corp. · Neutral

    07
  8. Drill Results

    Early Coyote drill holes show classic uranium signatures, but lab assays and full program remain the real test; board resignation a minor distraction.

    Jun 30, 2026 · 07:00 · STUD · Stallion Uranium Corp. · Routine +

    08
  9. Drill Results

    Blossom reports wide low-grade intercepts at Rosebud, underscoring the deposit’s scale while heap-leach economics remain unproven.

    Jun 30, 2026 · 07:00 · BGAU · Blossom Gold Inc. · Routine +

    09
  10. Drill Results

    Kalo’s Wainikoro epithermal discovery extends strike length with low grades, failing to deliver the high-grade bonanza expected by the market.

    Jun 30, 2026 · 07:00 · KALO · Kalo Gold Corp. · Routine +

    10
  11. Drill Results

    Atha’s fully funded 2026 campaign at Angilak will be the largest in the project’s history.

    Jun 30, 2026 · 07:00 · SASK · Atha Energy Corp. · Routine +

    11
  12. Drill Results

    Salazar tests porphyry fertility at Monja while El Domo construction costs rise to $284 million.

    Jun 30, 2026 · 06:46 · SRL · Salazar Resources Limited · Routine +

    12
  13. Drill Results

    Newcore’s high-grade Nyam drill results failed to halt the Enchi selloff following a PFS revealing a $351m capex requirement.

    Jun 30, 2026 · 06:02 · NCAU · Newcore Gold Ltd. · Routine +

    13
  14. Production / Operations

    Zefiro pivots to data-center infrastructure remediation, but liquidity remains tight and capital-dependent.

    Jun 30, 2026 · 05:01 · ZEFI · ZEFIRO METHANE CORP. · Routine +

    14
  15. Drill Results

    Spartan validates historic Victorio data, confirming project scale while a pending PEA determines economic viability.

    Jun 30, 2026 · 05:01 · W · Spartan Metals Corp. · Routine +

    15
← Newer Older →