Production / Operations
Mustang Energy samples 42.3 ppm U at 914W

MEC · Price
Executive Summary
- Mustang Energy released high‑resolution helicopter‑borne TDEM survey results for the 914W uranium project, identifying a well‑developed conductive zone consistent with graphite‑bearing basement rocks or fault‑controlled alteration—key pathfinder features for unconformity‑type uranium.
- A May 2025 soil and rock sampling program collected 142 soil samples and 25 rock samples; anomalous uranium values were detected, including one granitic gneiss sample returning 42.3 ppm U.
- The project remains underexplored but is situated near historic high‑grade zones (Scurry Rainbow E zone 1 and Don Lake trenches) and may support future drilling pending option agreement conditions.
Key Details
- Survey Coverage: 136 line kilometres of Xcite helicopter‑borne TDEM over the 914W property; data also include magnetic and radiometric measurements.
- Conductive Anomaly: Early time channels (0.014–0.045 ms) show strong EM responses along the east‑central block, persisting through mid‑to‑late time channels (0.12–0.56 ms); inversion modelling indicates a continuous conductive zone from 50 m to >350 m depth, trending ENE.
- Soil Sampling (May 2025):
- 142 soil samples + 25 rock samples collected across the claim area (2,440 ha).
- Five southern‑grid soils exceeded 4 ppm U (slightly elevated).
- Northeastern grid includes a granitic gneiss sample with 42.3 ppm U.
- Sampling Methodology: Samples analysed by SRC Laboratories (Saskatoon) using ICP‑MS with four‑acid digestion; results reported as weight % U₃O₈.
- Project Context: Located ~48 km SW of Cameco’s Key Lake operation, within the Western Wollaston domain known for unconformity and basement‑hosted uranium mineralization. Adjacent historic zones: Scurry Rainbow E zone 1 (1,288 ppm U in drill hole ML‑1) and Don Lake trenches 2 (up to 0.64 % U₃O₈).
- Option Agreement: Mustang may acquire a 75 % interest in the 914W project under existing option terms with Skyharbour Resources; see November 13 2024 release for details.
- Qualified Person Review: Technical information reviewed and approved by Troy Marfleet, P.Geo., qualified person per NI 43‑101.
Notable Quotes
(No direct quotes were provided in the release.)
More from Mustang Energy Corp
Apr 29, 2026 · 17:54