Northwire Canada EditionTuesday, November 10, 2026
Northwire
⌕
Gold 4,114.50 +1.0% Silver 52.69 +1.4% Copper 6.38 +2.3% Oil 86.38 −4.9% Palladium 1,037.50 +2.0% HMMC 5.30 +2.7% EQX 17.02 +4.8% URE 1.13 +7.6% VRB 0.050 −9.1% GGO 1.22 +9.9% EFF 0.030 +0.0% AXO 1.07 +0.9% VGZ 4.01 +3.1% WGLD 0.120 +0.0% AAUC 33.15 +1.9% EDR 11.80 +6.7% CNRI 0.195 +0.0% STND 0.065 +8.3% SHL 0.375 +0.0% MAI 4.39 +3.0% GCN 0.030 +0.0% Gold 4,114.50 +1.0% Silver 52.69 +1.4% Copper 6.38 +2.3% Oil 86.38 −4.9% Palladium 1,037.50 +2.0% HMMC 5.30 +2.7% EQX 17.02 +4.8% URE 1.13 +7.6% VRB 0.050 −9.1% GGO 1.22 +9.9% EFF 0.030 +0.0% AXO 1.07 +0.9% VGZ 4.01 +3.1% WGLD 0.120 +0.0% AAUC 33.15 +1.9% EDR 11.80 +6.7% CNRI 0.195 +0.0% STND 0.065 +8.3% SHL 0.375 +0.0% MAI 4.39 +3.0% GCN 0.030 +0.0%
Drill Results

Tartisan drills 6.1 m of 1.17% Ni at Kenbridge

TN · Price

Executive Summary

  • Tartisan Nickel reported a high‑grade intercept in hole KB26‑210 at the Kenbridge nickel‑copper‑cobalt project: 24.6 m averaging 0.71 % Ni and 0.56 % Cu, including higher‑grade sub‑intervals of 1.17 % Ni/1.45 % Cu over 6.1 m and 1.73 % Ni/0.31 % Cu over 2.0 m.
  • The results confirm continuity of significant nickel‑copper mineralization and support the company’s plan to upgrade its resource estimate.
  • Phase 1 drilling (3,191 m total) is complete for the first four targets; phase 2 drilling will commence in spring after a brief pause for spring breakup.

Key Details

  • Drill Hole KB26‑210 – Zone A: 0.71 % Ni and 0.56 % Cu over 24.6 m (true width estimated 65–80 %).
  • Sub‑intervals: 1.17 % Ni / 1.45 % Cu over 6.1 m (762.4–768.5 m depth) and 1.73 % Ni / 0.31 % Cu over 2.0 m (774.5–776.5 m depth).
  • Zone B: 0.27 % Ni and 0.24 % Cu over 5.8 m (800.2–806.0 m depth).
  • Total Phase 1 drilling completed: 3,191 m across four targets (holes KB26‑207 to KB26‑210).
  • Samples sent to Agat Laboratories Ltd. (Thunder Bay) for assay; QA/QC procedures follow NI 43‑101 standards.
  • Kenbridge deposit currently has a shaft to 622 m depth with level stations at 45 m intervals and additional levels at 107 m and 152 m below the collar.
  • Company plans: introduce borehole EM surveys on completed Phase 1 holes, then commence Phase 2 drilling in spring to test deeper extensions of the deposit.

Notable Quotes

“The KB26‑210 hole result represents a significant high‑grade intercept… These results will strengthen our ability and confidence in upgrading our resource and in the project's overall potential.” – Mark Appleby, CEO, Tartisan Nickel Corp.

Read the original news release →

More from Tartisan Nickel Corp