Drill Results
ESGold Launches 70 km2 District-Scale ANT Survey at Montauban Following 3D Model Identifying Deep, Expanding 2 km Mineralized Corridor

ESAU · Price
Executive Summary
- ESGold Corp. launched a second‑phase Ambient Noise Tomography (ANT) survey covering ~70 km² at the Montauban Gold‑Silver Project, a seven‑fold increase over the 2025 pilot survey.
- The expanded program aims to confirm continuation of a mineralized corridor that extends to ~900 m depth and >2 km strike, and to identify additional high‑grade lenses for step‑out drilling planned for spring 2026.
- Results will be integrated into an updated 3D geological model to refine drill targets and support the company’s dual‑track strategy of near‑term production (expected 2026) and district‑scale discovery.
Key Details
- Survey Scope: 70 km² (≈7× the original 10 km² area), covering the most prospective zones of the consolidated Montauban land package.
- Depth Penetration: Imaging from 50 m to at least 900 m, with potential for deeper extension beyond current limits.
- Geophysical Technology: Utilizes Caur Technologies’ ultra‑sensitive “Geodes” (10× more effective than traditional geophones) combined with AI‑driven modeling and satellite‑assisted geophysics.
- Initial Findings (2025 Survey):
- Mineralized architecture extending to ~900 m depth, significantly deeper than historic drilling (max ≈250 m).
- ≥2 km of strike length identified within the original 10 km² footprint.
- Corridor widens at depth and remains open where the survey ended.
- Program Objectives:
- Determine if the interpreted corridor continues along strike beyond the initial boundaries.
- Assess potential for additional mineralized lenses across the broader district‑scale framework.
- Generate high‑resolution, three‑dimensional subsurface images to guide step‑out drill target selection.
- Impact on Exploration Plan: Data will feed into an updated predictive 3D model and define high‑priority drill targets slated for execution in 2026.
- Production Context: ESGold’s processing facility is fully permitted, construction‑ready, with component procurement underway; the survey proceeds alongside near‑term production ramp‑up.
- Qualified Person Review: André Gauthier, P.Geo., Director and QP, has reviewed and approved the technical content under NI 43‑101 standards.
Notable Quotes
“This next phase marks an important step in defining the full scale of Montauban… The expanded 70 km² program is seven times larger than our initial survey and represents the most comprehensive geophysical assessment ever conducted across the Montauban district.” – Gordon Robb, CEO, ESGold Corp.
More from ESGold Corp.
Jun 11, 2026 · 07:31