Nine Mile Metals Intersects 44 Meters of Copper Mineralization and Provides Drill Program Update

Executive Summary
- Nine Mile Metals completed its 2025 drill program at the Wedge VMS project, drilling 7 holes (1,654 m) and intersecting massive Cu‑Pb‑Zn‑Ag‑Au mineralization in all five copper‑targeted holes.
- Drill hole WD‑25‑05 intersected a high‑grade VMS zone from 155.5 m to 157.8 m and an additional 40 m of mineralized felsic volcanics, with core now submitted for base‑metal and precious‑metal assay (57 samples).
- The company announced plans for an expanded 2026 drilling campaign (West Wedge and Tribag Target Trend) and BHEM surveys, with first assay results expected within the week.
Key Details
- Drill Hole WD‑25‑05 – Collared on same pad as WD‑25‑01; azimuth 310°, dip –60°. Final depth 275 m.
- Intersected massive VMS mineralization (Cu, Pb, Zn, Ag, Au) from 155.52 m to 157.80 m.
- Followed by 40 m of mineralized felsic volcanics (rhyolite) from 157.80 m to 197.80 m.
- Core logged, photographed, cut; quick XRF confirmed sulphide presence.
-
57 samples shipped to ALS Global for Base & Precious Metals analysis (including Antimony).
-
Drill Holes BHEM‑01 & BHEM‑02 – Collared on permitted pads in the northwest extension; solid core with minimal faulting, ideal for Borehole Electromagnetic (BHEM) surveying. Pads ready for further westward drilling or deeper extensions.
-
2025 Drill Program Overview
- Total: 7 holes, 1,654 m drilled.
- 5 copper‑targeted holes intersected massive VMS and banded copper sulphide mineralization; widths between 13 m and 48 m.
- Mineralized siliceous volcanics encountered in multiple holes, adding a new mineralized sequence.
- Confirmed Graphitic Shear Zone as diagnostic marker horizon.
-
Noted western extension shows higher chalcopyrite/pyrite relative to galena/sphalerite.
-
Key Observations
- Graphitic shear zone in contact with VMS confirmed as a diagnostic marker.
- Mineralized siliceous volcanics intersected, defining additional mineralized sequence.
- Multiple VMS horizons identified (e.g., holes WD‑25‑01 & WD‑25‑02).
-
Substantial widths of Argillite, VMS, and felsic volcanic units will aid 3D modeling and future targeting.
-
Management Comments
- VP Exploration Gary Lohman highlighted success of the drill program and upcoming BHEM survey to improve deposit modeling.
-
CEO Patrick J. Cruickshank called the results “more than we expected,” announced Phase 3 drilling plans, and noted first assay results are due within the week.
-
Future Plans
- New permitting underway for 2026 campaign targeting West Wedge and Tribag Trend.
- BHEM surveys to continue supporting depth mapping and interference mitigation.
Notable Quotes
“We are thrilled with the success of our Wedge Phase 2 Drill Program… To have all 5 holes strike mineralization was more than we expected.” – Patrick J. Cruickshank, CEO & Director
“Our Wedge Drill Program has been very successful, intersecting Massive Cu bearing VMS where targeted… New permitting is underway in preparation of an exciting 2026 campaign at the Wedge.” – Gary Lohman, VP Exploration & Director