Northwire Canada EditionWednesday, July 29, 2026
Northwire
GTWO 9.40 −1.4% CDA 0.890 +0.0% IZN 0.060 +0.0% AUMB 0.580 +0.0% BOL 0.075 +15.4% ABRA 13.77 −4.4% GMIN 40.15 −4.6% PBM 0.045 +0.0% AEF 0.145 +0.0% EDCU 0.425 −6.6% SCD 0.165 −2.9% DLTA 0.165 +6.5% AAUC 24.28 −17.7% CNL 17.95 +0.0% SAG 0.880 −2.2% MEK 0.055 +10.0% GTWO 9.40 −1.4% CDA 0.890 +0.0% IZN 0.060 +0.0% AUMB 0.580 +0.0% BOL 0.075 +15.4% ABRA 13.77 −4.4% GMIN 40.15 −4.6% PBM 0.045 +0.0% AEF 0.145 +0.0% EDCU 0.425 −6.6% SCD 0.165 −2.9% DLTA 0.165 +6.5% AAUC 24.28 −17.7% CNL 17.95 +0.0% SAG 0.880 −2.2% MEK 0.055 +10.0%
Drill Results

Cambria Gold Mines Reports Results From 2024 & 2025 Drilling, Including 20.7 g/t Au and 50.1 g/t Ag over 15.9 meters at Big Missouri Extension

CAMB · Price

Executive Summary

  • Cambria Gold Mines released high‑grade gold intercepts from its 2024 & 2025 drilling programs at the Premier Gold Project, including 15.9 m @ 20.75 g/t Au & 51.0 g/t Ag (hole P25‑2695a) and 6.9 m @ 32.81 g/t Au & 13.4 g/t Ag (hole P25‑2670).
  • A newly defined target near the historic Sebakwe mine returned 3.9 m @ 16.20 g/t Au & 68.0 g/t Ag (hole P25‑2673) and 1.3 m @ 32.40 g/t Au & 9.1 g/t Ag (hole P25‑2683), indicating potential expansion outside the current resource envelope.
  • Total drilling comprised 26,303 m from 135 holes; results will feed a 2026 drill program aimed at resource upgrade and expansion of the Big Missouri and Northern Lights deposits.

Key Details

  • Big Missouri Extension (2025) – 3,252 m / 15 holes
  • P25‑2659a: 15.9 m @ 20.75 g/t Au & 51.0 g/t Ag (incl. 6.1 m @ 50.13 g/t Au & 123.0 g/t Ag)
  • P25‑2670: 6.9 m @ 32.81 g/t Au & 13.4 g/t Ag (incl. 2.5 m @ 88.24 g/t Au & 20.1 g/t Ag)
  • P25‑2684: 4.0 m @ 24.23 g/t Au & 28.8 g/t Ag

  • Sebakwe Extension (2025) – 11,712 m / 35 holes

  • P25‑2673: 3.9 m @ 16.20 g/t Au & 68.0 g/t Ag
  • P25‑2675: 2.3 m @ 9.61 g/t Au & 50.0 g/t Ag
  • P25‑2683: 1.3 m @ 32.40 g/t Au & 9.1 g/t Ag

  • Big Missouri Infill (2024) – 11,339 m / 85 holes (re‑analysis by ALS)

  • P24‑2558: 8.5 m @ 8.45 g/t Au & 41.5 g/t Ag (incl. 1.0 m @ 15.95 g/t Au; 1.75 m @ 18.80 g/t Au) and 6.2 m @ 7.70 g/t Au & 34.2 g/t Ag
  • P24‑2605: 10.0 m @ 7.66 g/t Au & 12.2 g/t Ag (incl. 4.8 m @ 14.59 g/t Au & 16.2 g/t Ag)
  • P24‑2634: 8.3 m @ 9.28 g/t Au (incl. 2.0 m @ 32.00 g/t Au & 30.0 g/t Ag)

  • Overall Program Metrics – 26,303 m drilled; 135 diamond holes; focus on infill, extension of Big Missouri and new targets around the Premier‑Northern Lights (PNL) deposit.

  • Quality Assurance / Quality Control

  • 2024 samples initially fire‑assayed at a non‑accredited lab; re‑pulverized and re‑analyzed by ALS Canada (ISO 17025).
  • 2025 samples prepared and analyzed entirely by ALS Canada’s ISO‑certified labs.
  • QA/QC program included blanks, certified reference materials, and duplicate core samples.

  • Qualified Person – Blaine Smit, P.Geo., Vice President Exploration, reviewed and approved the technical information under NI 43‑101.

  • Forward‑Looking Statements – Company plans a 2026 drilling campaign to further upgrade and expand mineral resources; statements subject to customary risk factors.

Notable Quotes

“The identification of high‑grade gold mineralization proximal to the Big Missouri and PNL deposits demonstrates the strong resource expansion potential at the Premier Gold Project… our 2026 drilling program has recently commenced and will target upgrading and expansion of current Mineral Resources.” – Robert McLeod, President & CEO


All non‑material boilerplate, safe‑harbor language, and contact information have been omitted for brevity.

Read the original news release →

More from Cambria Gold Mines Inc.