Drill Results
Tocvan completes airborne magnetic survey at Gran Pilar

TOC · Price
Executive Summary
- Tocvan Ventures completed a high‑resolution drone‑based airborne magnetic survey of the entire Gran Pilar gold‑silver project, revealing subsurface structures that align with known mineralization and identifying new target zones for expansion.
- The company disclosed extensive historic and recent drilling results (2020‑2025) showing multiple high‑grade Au/Ag intercepts, supporting a strong resource potential across South, North, and Central blocks.
- Metallurgical testing demonstrated very high metal recoveries (up to 99 % Au and 97 % Ag), reinforcing the economic viability of future pilot‑scale production.
Key Details
- Survey Scope: 70 east‑west lines, 100 m spacing; total 235.66 km line length; conducted by Zonge International Inc.
- Data Products Delivered: Total Magnetic Intensity (TMI), TMI reduced to the pole (TMI‑RTP), first vertical derivative (1VD) of TMI‑RTP, tilt derivative of TMI‑RTP.
- Interpretation Benefits: Enables integration with existing geochemical, geological and drill data; guides target refinement for the ongoing 20,000 m drill program and pilot mine development.
- CEO Quote: “The high‑quality data sets a strong foundation for our next phases of analysis… these structures have the potential of expanding our targets across the area.”
Recent Drilling Highlights (2025)
| Drill Type | Intercept | Grade |
|---|---|---|
| Diamond – Feb 25 | 3.1 m @ 19.4 g/t Au (within 106.6 m of 0.6 g/t Au) | High‑grade Au |
| RC – May 7 | 6.1 m @ 5.4 g/t Au (within 41.2 m of 1.0 g/t Au) | Strong Au |
| Diamond – Mar 26 | 3.0 m @ 21.6 g/t Au & 209 g/t Ag (within 64.9 m @ 1.2 g/t Au) | Very high‑grade Au/Ag |
| RC – Apr 16 | 2.6 m @ 7.2 g/t Au & 80 g/t Ag (within 46.9 m @ 0.5 g/t Au) | Notable Au/Ag |
Historic Drilling Highlights (2024‑2020)
- 2024 RC: 42.7 m @ 1.0 g/t Au, including 3.1 m @ 10.9 g/t Au.
- 2022 Phase 3 Diamond: 116.9 m @ 1.2 g/t Au, including 10.2 m @ 12 g/t Au & 23 g/t Ag.
- 2020 Phase 1 RC: 24.4 m @ 2.5 g/t Au & 73 g/t Ag; 1.5 m @ 33.4 g/t Au & 1,090 g/t Ag.
Bulk Sample Metallurgy
- Gold Recovery: 62 % overall (46‑day leach); fine fraction test – 80 % gold recovery in 24 h.
- Silver Recovery: 94 % in rapid 24 h test; bulk sample extracted grade 3 g/t Ag (head grade 7 g/t).
- Additional Tests: Gravity‑agitated leach on composites – 95‑99 % Au, 73‑97 % Ag recovery; drill core composite at 120 m depth gave 99 % Au & 73 % Ag.
Exploration Targets
- South Block Main Zone Expansion: Follow‑up on 2025 drill hits (19.4 g/t Au, 5.4 g/t Au, 136 g/t Ag).
- Placer Corridor (900 m strike): Soil samples up to 21.2 g/t Au & >2,000 g/t Ag.
- North Alteration Zone: Chip sample 5.6 g/t Au & 106 g/t Ag; historic mine sample 3.2 g/t Au & 1,225 g/t Ag.
Next Steps
- Detailed magnetic data analysis and inversion modelling to estimate depth/geometry of sources.
- Correlation with geological, geochemical, and existing drill datasets.
- Refinement of exploration targets ahead of the planned 20,000‑m drilling campaign and pilot mine permitting.
Notable Quotes
“We are excited about the completion of this extensive drone magnetic survey at Gran Pilar… these structures have the potential of expanding our targets across the area, with a specific emphasis on the underexplored Central portion of the project.” – Brodie Sutherland, CEO, Tocvan Ventures Corp.
More from Tocvan Ventures Corp
May 28, 2026 · 03:05