Northwire Canada EditionThursday, July 30, 2026
Northwire
ZAC 0.060 +0.0% ELE 21.18 −1.7% GHRT 0.750 +0.0% AEM 203.13 +0.1% JTWO 0.135 +0.0% EDR 10.63 −2.8% VMXX 0.750 +5.6% K 32.71 −1.5% AGI 40.13 −1.4% VGZ 2.40 +0.8% CAN 0.055 +0.0% NVO 0.055 +0.0% ARIS 19.57 −4.2% IVN 10.59 −0.8% MCI 0.165 +0.0% MTS 0.130 +0.0% ZAC 0.060 +0.0% ELE 21.18 −1.7% GHRT 0.750 +0.0% AEM 203.13 +0.1% JTWO 0.135 +0.0% EDR 10.63 −2.8% VMXX 0.750 +5.6% K 32.71 −1.5% AGI 40.13 −1.4% VGZ 2.40 +0.8% CAN 0.055 +0.0% NVO 0.055 +0.0% ARIS 19.57 −4.2% IVN 10.59 −0.8% MCI 0.165 +0.0% MTS 0.130 +0.0%
Drill Results

Military Metals Drills 10.2 Meters of 1.49% Antimony Including 2.0 Meters of 9.33% Antimony Within 3.2 Meters of 3.78% Antimony at Flagship Trojarova Project, Europe

MILI · Price

Executive Summary

  • Military Metals Corp. released analytical results from hole 25‑TVA‑005 of its 2025 definition drilling program at the Trojárová Antimony‑Gold Project in Slovakia.
  • The hole returned a high‑grade intercept of 2.0 m @ 9.33 % Sb (true width 0.9 m) and a broader zone of 10.2 m @ 1.49 % Sb (true width 9.0 m).
  • Results support the ongoing work by SLR Consulting to produce a current NI 43‑101 mineral resource estimate, expected by end‑Q1 2026.

Key Details

  • Hole 25‑TVA‑005 intercepts
  • 10.2 m @ 1.49 % Sb (true width 9.0 m) from 150.8 m to 161.0 m.
  • Includes 2.0 m @ 9.33 % Sb (true width 0.9 m) from 153.0 m to 154.0 m.
  • Within 3.2 m @ 3.78 % Sb (true width 2.8 m) from 150.8 m to 154.0 m.

  • Full analytical table – provides interval depths, drilled lengths, true widths, sample IDs, antimony grades and gold grades for the entire hole (see release).

  • Drillhole collar data – coordinates, elevation, length, dip and azimuth for all 2025 holes (25‑TVA‑001 to 25‑TVA‑007).

  • QA/QC procedures – PQ/HQ core, split sampling, transport to ALS Laboratories (Romania), analysis by ME_ICP41a (Sb) and Au‑AA25 (Au), reference material insertion (1 in 10) and duplicates (1 in 30).

  • Qualified Person – David Murray, P.Geo, VP‑Exploration, verified results and field procedures.

  • Project context

  • Historical resource (1992) estimated 2.46 Mt @ 2.47 % Sb & 0.635 g/t Au; classified as inferred/inferior under CIM.
  • Current NI 43‑101 resource estimate being prepared by SLR Consulting, targeted for completion by end‑March 2026.

  • CEO comment – Scott Eldridge highlighted the high‑grade intersections and their significance for confirming deposit continuity and advancing the upcoming resource estimate.

Notable Quotes

“The high‑grade 1 intersections we’re seeing at Trojárová, including 2 meters at 9.33 % antimony, confirm the strong continuity of this deposit. We eagerly await the final analytical results to continue our work towards establishing a current mineral resource estimate on the property, strengthening Trojárová’s position as Europe’s premier antimony project.” – Scott Eldridge, CEO


All technical data are subject to verification by qualified persons and conform to NI 43‑101 standards.

Read the original news release →

More from Military Metals Corp.