ERD 6.16 −1.4% NFG 2.37 +2.2% CLM 0.060 +0.0% GEMG 1.64 +0.0% STGO 1.56 +2.6% WEX 0.580 −3.3% NOBL 0.120 +9.1% LGO 1.00 −3.9% SSE 0.095 +0.0% AAZ 0.040 +0.0% MNRG 0.095 +11.8% RME 0.260 +30.0% NUAG 9.48 +1.3% KRN 0.300 +11.1% EON 0.020 −nan% EMO 0.420 −1.2% ERD 6.16 −1.4% NFG 2.37 +2.2% CLM 0.060 +0.0% GEMG 1.64 +0.0% STGO 1.56 +2.6% WEX 0.580 −3.3% NOBL 0.120 +9.1% LGO 1.00 −3.9% SSE 0.095 +0.0% AAZ 0.040 +0.0% MNRG 0.095 +11.8% RME 0.260 +30.0% NUAG 9.48 +1.3% KRN 0.300 +11.1% EON 0.020 −nan% EMO 0.420 −1.2%
Resource Estimate

Volta Reports Major Resource Expansion at Springer REE Deposit, Demonstrating Substantial Growth in Both Indicated & Inferred Categories

VLTA · Price

Executive Summary

  • Volta Metals announced a dramatically expanded mineral resource estimate for the Springer REE deposit – Indicated resources increased 1,248% to 56.6 Mt at 0.70 % TREO and Inferred resources grew 841% to 119.5 Mt at 0.58 % TREO, placing the project among North America’s top‑10 REE deposits.
  • The estimate is based on 26 drill holes (7,721 m) and uses a C$43/t net metal revenue cut‑off; average NMR values are $159/t for Indicated and $128/t for Inferred material.
  • A fully funded 6,000‑m Phase‑2 drilling program is underway, and additional high‑grade gallium results (not yet included) are forthcoming, underscoring further upside potential.

Key Details

  • Resource Summary (as of Dec 31 2025):
  • Indicated – 56.6 Mt @ 0.70 % TREO (346 ppm Pr₆O₁₁, 1,185 ppm Nd₂O₃, 38 ppm Dy₂O₃, 9 ppm Tb₄O₇) – NMR $159/t.
  • Inferred – 119.5 Mt @ 0.58 % TREO (282 ppm Pr₆O₁₁, 947 ppm Nd₂O₃, 31 ppm Dy₂O₃, 7 ppm Tb₄O₇) – NMR $128/t.

  • High‑Grade Cores:

  • Near‑surface Indicated core: 11.5 Mt @ 1.10 % TREO.
  • Near‑surface Inferred core: 3 Mt @ 1.16 % TREO.

  • Assay Basis & Modelling:

  • 26 drill holes, 7,721 m total; 4,429 assays and 532 density samples.
  • Two wireframes (high‑grade vs low‑grade) modelled in Leapfrog Geo with a nominal NMR cut‑off of C$220 for domain separation.

  • Cut‑off & Cost Assumptions:

  • Net metal revenue (NMR) cut‑off: C$43/t, incorporating processing (C$40/t), G&A (C$4/t), and mining cost (C$4/t moved).
  • Metal price assumptions (US$/kg): Pr 130, Nd 130, Dy 440, Tb 1,350; exchange rate 1.35 C$:US$.

  • Metallurgical & Economic Parameters:

  • Recoveries based on 2012 testwork: Pr 72.7 %, Nd 48.5 %, Dy 41.8 %, Tb 43.8 %.
  • Revenue drivers are Pr₆O₁₁ and Nd₂O₃ (≈90 % of total).

  • Infrastructure Highlights:

  • Located ~70 km east of Sudbury, 15 km north of Sturgeon Falls; access via Highway 64, Trans‑Canada Highway, CN rail line, hydroelectric power from nearby dams.

  • Future Work & Upside:

  • Phase‑2 drill program (6,000 m) fully funded and ongoing.
  • Historical and recent high‑grade gallium assay results (Jan 26 2026 & Feb 11 2026) not yet incorporated; additional gallium data pending.

  • Regulatory/Technical Disclosure:

  • Estimate prepared by Katharine Masun, P.Geo., Qualified Person under NI 43‑101.
  • Full technical report to be filed on SEDAR+ within 45 days of release.