Drill Results
Volta Commences Definition Drilling and Resource Expansion Program at the Springer REE Project in Ontario, Canada

VLTA · Price
Executive Summary
- Volta Metals Ltd. has launched a fully funded, second‑phase winter drill program at the Springer Rare Earth Deposit in Ontario, targeting 16 diamond holes (~5,750 m) to be completed by Q1 2026.
- The Phase 2 work builds on strong Phase 1 results, including a high‑grade Dysprosium/Terbium interval (184 g/t Dy₂O₃+Tb₂O₃ over 27.1 m) and aims to infill historic drilling to 50 m spacing, expand mineralization, and collect geotechnical/geometallurgical data for a Preliminary Economic Assessment slated for 2026.
- Phase 1 drilling confirmed continuous REE mineralization (283–438 m thickness; 0.65‑0.95 % TREO) extending below the historic 2012 resource shell, supporting an upcoming update to that resource estimate in Q1 2026.
Key Details
- Program Scope: 16 diamond drill holes, total ~5,750 m; individual holes 300–400 m (final depths contingent on geology).
- Timeline: Drilling scheduled for completion in Q1‑2026.
- Objectives:
- Infill historic drilling to 50 m spacing.
- Expand known mineralization along strike and depth.
- Generate geotechnical, geometallurgical, and geological data for a 2026 PEA.
- Phase 1 Review (Sept 2025):
- Four holes, 1,638 m total.
- Continuous REE intervals 283–438 m; TREO grades 0.65‑0.95 %.
- High‑grade Dy/Tb interval: 184.04 g/t Dy₂O₃+Tb₂O₃ over 27.1 m (124.4‑151.5 m).
- HREO component averages 10.9 % of TREO; includes Dy, Tb, Y, Gd.
- Historical Resource (2012):
- Indicated: 4.2 Mt @ 1.14 % TREO (0.02 % ThO₂).
- Inferred: 12.7 Mt @ 1.17 % TREO (0.01 % ThO₂).
- Not compliant with current CIM standards; to be updated after Phase 2 results.
- Geophysical Context: Prior high‑resolution aeromagnetic/spectrometric survey identified the Springer deposit and a secondary target east of Lost Lake, both showing low magnetic signatures and thorium anomalies.
- Infrastructure: Property accessible via Trans‑Canada Highway 17; nearby rail lines, power generation stations, and proximity (~70 km) to Sudbury mining district.
- QA/QC Protocol: Diamond NQ‑size core, reference standards, blanks, duplicates; samples processed at Activation Laboratories Ltd. using Code 8‑REE assay (ICP/ICP‑MS).
- Qualified Person: Andrew Tims, P.Geo., independent QP under NI 43‑101.
Notable Quotes
“The initiation of this program marks another important milestone in Volta's rapid advancement of the Springer Project and underscores the Company's commitment to unlocking the full value of this emerging rare earth asset.” – Kerem Usenmez, President & CEO
Materiality Assessment: Material – Positive (significant exploration activity with potential impact on future resource estimates and economic studies).
More from Volta Metals Ltd.
Jun 15, 2026 · 06:01