Newcore Gold Increases Drill Program to 60,000 Metres at the Enchi Gold Project, Ghana
Newcore expands Enchi drill program to 60,000 meters as warrant exercises bolster treasury for 2026 PFS milestone.

The most recent news (March 12, 2026) announces a significant expansion of the ongoing drill program at the Enchi Gold Project in Ghana, increasing it from 45,000 metres to 60,000 metres. This expansion is supported by three active drill rigs. The company confirmed it has received approximately $10.3 million in cash proceeds from the exercise of 20,548,000 warrants at $0.50. Management reiterated that the Pre-Feasibility Study (PFS) remains on track for completion by the end of June 2026.
The news is Routine - Positive. While the expansion of the drill program by 33% is a strong signal of geological confidence, it is an incremental step rather than a fundamental shift in strategy. - Funding Validation: The successful exercise of $10.3M in warrants at $0.50 provides a "hard" floor for valuation and confirms shareholder support. - Operational Acceleration: Moving to 60,000 metres allows for simultaneous infill drilling (resource conversion) and "blue-sky" depth exploration without delaying the PFS timeline. - De-risking: The transition from the 2024 PEA (heap leach) to a CIL (milling) flowsheet, as noted in the February 2026 news, is being supported by this additional drilling, which targets the higher-grade sulphide mineralization needed to justify a mill.
Newcore Gold owns 100% of the Enchi Gold Project in southwest Ghana. The project covers 461 km² along the Sefwi-Bibiani Gold Belt, which hosts multi-million-ounce mines like Ahafo (Newmont) and Bibiani (Asante). - Flagship: Enchi Gold Project. - Current Resource: 743,500 oz Indicated (0.55 g/t) and 972,000 oz Inferred (0.65 g/t). - Strategy: Transitioning from a low-grade heap leach concept to a higher-recovery CIL milling operation to capture value from high-grade shoots at depth.