Northwire Canada EditionTuesday, November 10, 2026
Northwire
⌕
Gold 4,114.50 +1.0% Silver 52.69 +1.4% Copper 6.38 +2.3% Oil 86.38 −4.9% Palladium 1,037.50 +2.0% HMMC 5.30 +2.7% EQX 17.02 +4.8% URE 1.13 +7.6% VRB 0.050 −9.1% GGO 1.22 +9.9% EFF 0.030 +0.0% AXO 1.07 +0.9% VGZ 4.01 +3.1% WGLD 0.120 +0.0% AAUC 33.15 +1.9% EDR 11.80 +6.7% CNRI 0.195 +0.0% STND 0.065 +8.3% SHL 0.375 +0.0% MAI 4.39 +3.0% GCN 0.030 +0.0% Gold 4,114.50 +1.0% Silver 52.69 +1.4% Copper 6.38 +2.3% Oil 86.38 −4.9% Palladium 1,037.50 +2.0% HMMC 5.30 +2.7% EQX 17.02 +4.8% URE 1.13 +7.6% VRB 0.050 −9.1% GGO 1.22 +9.9% EFF 0.030 +0.0% AXO 1.07 +0.9% VGZ 4.01 +3.1% WGLD 0.120 +0.0% AAUC 33.15 +1.9% EDR 11.80 +6.7% CNRI 0.195 +0.0% STND 0.065 +8.3% SHL 0.375 +0.0% MAI 4.39 +3.0% GCN 0.030 +0.0%
Resource Estimate

Cruz Battery Metals Announces Maiden Mineral Resource Estimate on its Solar Lithium Project in Big Smokey Valley, Nevada

CRUZ · Price

Executive Summary

  • Cruz Battery Metals announced its maiden NI 43‑101 mineral resource estimate for the 100% owned Solar Lithium Clay Deposit in Nevada.
  • The estimate totals 50 Mt @ 608 ppm Li for 161,000 indicated tonnes of lithium carbonate equivalent (LCE) and 183 Mt @ 539 ppm Li for 525,000 inferred tonnes LCE using a 300 ppm Li cutoff.
  • Stantec’s qualified person Joan Kester prepared the technical report in accordance with CIM best‑practice guidelines and NI 43‑101 standards.

Key Details

  • Indicated Resources (300 ppm cut‑off): 50 Mt, 608 ppm Li → 161 kt LCE (30 kt Li₂CO₃, 183 kt LiOH·H₂O).
  • Inferred Resources (300 ppm cut‑off): 183 Mt, 539 ppm Li → 525 kt LCE (99 kt Li₂CO₃, 597 kt LiOH·H₂O).
  • Resource tables provided for additional cut‑offs (400–800 ppm) showing corresponding volumes, tonnes, and lithium grades.
  • Assumptions used in the base case:
  • Lithium carbonate price US $21,000/tonne
  • Mining waste cost US $3.25/tonne; processing cost US $50.5/tonne
  • Lithium recovery 90%
  • Fixed density 1.70 g/cm³ (1.43 t/yd³)
  • Cut‑off grade 500 ppm Li for the base case scenario.
  • Qualified Person: Joan Kester, P.Geo., Stantec Consulting Services Inc., with direct experience on Nevada lithium clay projects; also qualified person for American Lithium Corp.’s TLC Lithium Project.
  • The release includes standard NI 43‑101 disclaimer that mineral resources are not reserves and have no demonstrated economic viability.

Notable Quotes

“We appreciate Stantec, a world leader in the industry, preparing our Technical Report and mineral resource estimate for the Solar lithium project in Nevada.” – James Nelson, President & CEO, Cruz Battery Metals Corp.

Read the original news release →

More from Cruz Battery Metals Corp.