Northwire Canada EditionSunday, November 8, 2026
Northwire
⌕
Gold 4,079.60 −0.8% Silver 51.94 −0.8% Copper 6.24 −0.5% Oil 90.83 +0.3% Palladium 1,017.10 −2.6% KRN 0.260 −7.1% GSKR 2.84 +5.6% ADE 0.125 +4.2% NRM 0.055 +0.0% BBB 0.520 −1.9% LGD 2.09 +1.9% DEC 0.110 +0.0% LCE 0.200 +0.0% NILI 0.515 −1.0% CDE 21.85 +6.7% CAN 0.045 +0.0% LORD 0.100 +0.0% HBM 29.49 +2.3% ELEF 0.265 +120.8% MUN 0.300 +0.0% SAGA 0.400 +6.7% Gold 4,079.60 −0.8% Silver 51.94 −0.8% Copper 6.24 −0.5% Oil 90.83 +0.3% Palladium 1,017.10 −2.6% KRN 0.260 −7.1% GSKR 2.84 +5.6% ADE 0.125 +4.2% NRM 0.055 +0.0% BBB 0.520 −1.9% LGD 2.09 +1.9% DEC 0.110 +0.0% LCE 0.200 +0.0% NILI 0.515 −1.0% CDE 21.85 +6.7% CAN 0.045 +0.0% LORD 0.100 +0.0% HBM 29.49 +2.3% ELEF 0.265 +120.8% MUN 0.300 +0.0% SAGA 0.400 +6.7%
Technical Study

Doubleview Gold Corp. Announces Filing of Preliminary Economic Assessment Technical Report for the Hat Project

Doubleview Gold Files Hat Project PEA Report, Confirming C$7B NPV After March Run

Executive Summary
  • On April 14, 2026, Doubleview Gold Corp. filed the NI 43-101 Technical Report for the Preliminary Economic Assessment (PEA) of its Hat Polymetallic Project in British Columbia.
  • The filing confirms economic metrics previously announced in March 2026: After-tax NPV(5%) up to C$7.27 billion at consensus prices and C$14.85 billion at spot prices.
  • IRR ranges from 19% (consensus) to 39% (spot).
  • The project envisions a 25-year mine life with a processing rate of 120,000 tonnes-per-day.
  • Scenario B includes a scandium recovery circuit, producing 128 tonnes of Scandium Oxide annually in the first 10 years.
  • This filing follows the March 23, 2026 clarification release which updated the NPV figures from an initial March 2 announcement.
Material Impact
  • The April 14 news is a regulatory filing confirming data released publicly in late March 2026.
  • No new economic parameters or resource numbers were introduced compared to the March 23 update (NewsId 100610).
  • The market likely priced in the PEA results during the March announcement period, evidenced by the stock price rising from ~$1.50 in January 2026 to over $3.00 by April 2026.
  • This filing removes regulatory uncertainty regarding the technical report but does not alter the fundamental valuation established in Q1 2026.
  • The news is positive as it solidifies the project's bankability, but it is routine relative to the initial PEA announcement.
DBG · Price
Company Overview
  • Company: Doubleview Gold Corp. is a mineral exploration company focused on British Columbia projects.
  • Flagship Project: Hat Polymetallic Project (100% owned) in northwestern BC.
  • Project Type: Large-scale polymetallic porphyry deposit containing copper, gold, silver, cobalt, and scandium.
  • Development Stage: Advanced exploration/PEA stage; moving toward Pre-Feasibility Study.
  • Royalties: News mentions a 2% NSR royalty in resource calculation assumptions (NewsId 97877), but specific third-party royalty encumbrances on the land title are not detailed beyond this economic assumption.
Read the original news release →

More from Doubleview Gold Corp.