Northwire Canada EditionThursday, November 12, 2026
Northwire
⌕
Gold 3,876.10 −3.1% Silver 49.92 −4.0% Copper 6.20 −1.4% Oil 87.34 +0.9% Palladium 996.75 −4.7% PRU 6.08 −3.5% NGEX 21.10 −4.8% TWO 0.370 +0.0% BIG 0.960 +1.1% VCG 1.10 +0.0% SCD 0.145 +0.0% GAL 0.375 +0.7% SAG 0.640 −3.0% VIZ 0.195 +0.0% SAGA 0.375 −6.2% ZEN 0.530 −3.6% TDG 0.490 +0.0% GDP 0.230 +0.0% PDN 8.41 +0.0% FL 0.350 −2.8% RIO 2.61 −2.2% Gold 3,876.10 −3.1% Silver 49.92 −4.0% Copper 6.20 −1.4% Oil 87.34 +0.9% Palladium 996.75 −4.7% PRU 6.08 −3.5% NGEX 21.10 −4.8% TWO 0.370 +0.0% BIG 0.960 +1.1% VCG 1.10 +0.0% SCD 0.145 +0.0% GAL 0.375 +0.7% SAG 0.640 −3.0% VIZ 0.195 +0.0% SAGA 0.375 −6.2% ZEN 0.530 −3.6% TDG 0.490 +0.0% GDP 0.230 +0.0% PDN 8.41 +0.0% FL 0.350 −2.8% RIO 2.61 −2.2%
Drill Results

First Hole Completed in Timmins Area Diamond Drill Program

Noble identifies anomalous zinc at Carnegie while shifting toward a royalty-heavy project generator model.

Executive Summary

The news release dated January 19, 2026, announces the completion of the first diamond drill hole (CG-25-01) at the Carnegie Township project near Timmins, Ontario. The hole intersected 6.5 meters of 0.64% zinc, including a 1.0-meter interval of 1.90% zinc, with associated anomalous copper, silver, and lead. Mineralization was found in sulphide-rich graphitic sediment. Noble has initiated a second hole (CG-25-02) to test the same zone at a greater vertical depth (~200m) and has scheduled an additional 1,000 meters of drilling for Southwest Carnegie in early 2026. This program is a 50/50 partnership with a private partner (11530313 Canada Inc.) on lands where Noble retains exploration rights for Volcanogenic Massive Sulphide (VMS) and precious metals.

Material Impact
  • Technical Success, Commercial Uncertainty: While finding zinc mineralization validates the company’s geophysical targeting, the grades reported (0.64% Zn) are low-grade for an exploration target aiming to emulate the nearby Kidd Creek Mine. At this stage, it is a technical success that keeps the story alive but does not yet represent a discovery of economic significance.
  • Strategic Synergy: The news follows a period of heavy administrative and strategic positioning. Noble has successfully offloaded the "heavy lifting" of the Crawford/Project 81 assets to Canada Nickel (CNC), retaining a 20% stake in East Timmins Nickel Ltd (ETN) and various royalties. This drill program represents Noble’s pivot back to its own exploration roots using flow-through funds raised in late 2025.
  • Risk Mitigation: The 50/50 partnership structure for this specific drill program reduces the immediate capital outlay for Noble, which is critical given its historically low cash balances.
NOB · Price
Company Overview

Noble Mineral Exploration is a project generator and explorer focused on the Timmins-Cochrane area of Northern Ontario. - Flagship Project: Carnegie Township. Located near the world-class Kidd Creek VMS mine, the project is being explored for zinc-copper-silver-lead mineralization. - Secondary Focus: Through its 20% interest in East Timmins Nickel Ltd (partnered with Canada Nickel), the company has exposure to a massive 38,729-hectare land package targeting bulk-tonnage nickel. - Portfolio: Noble also holds significant REE properties in Quebec/Labrador and a Uranium prospect (Taser North), along with a 30% interest in the Great Burnt Copper/South Pond Gold properties through Homeland Nickel.

Read the original news release →

More from Noble Mineral Exploration Inc.