Northwire Canada EditionFriday, July 10, 2026
Northwire
TLO 5.37 +5.7% BNKR 4.88 +1.7% GG 2.25 +3.2% MJS 0.100 +5.3% PAAS 62.54 +3.6% PE 0.230 +0.0% SGML 17.19 +4.8% LAR 10.34 −1.1% NED 0.025 +0.0% GEN 0.080 +0.0% TVI 0.060 +0.0% SKYG 0.025 −37.5% WRLG 0.660 +6.5% FFU 0.120 −7.7% LOD 0.310 +3.3% CBI 0.110 +0.0% TLO 5.37 +5.7% BNKR 4.88 +1.7% GG 2.25 +3.2% MJS 0.100 +5.3% PAAS 62.54 +3.6% PE 0.230 +0.0% SGML 17.19 +4.8% LAR 10.34 −1.1% NED 0.025 +0.0% GEN 0.080 +0.0% TVI 0.060 +0.0% SKYG 0.025 −37.5% WRLG 0.660 +6.5% FFU 0.120 −7.7% LOD 0.310 +3.3% CBI 0.110 +0.0%

← Back to our analysis

Original News Release Routine +

Osisko Development Extends Gold Mineralization at Cariboo Gold Project Beyond 700 m Vertical Depth in Previously Untested Areas; Intercepts Include 13.19 g/t Gold Over 3.60 m at 596 m Vertical Depth and 28.90 g/t Gold Over 0.50 m at 718 m Vertical Depth

HIGHLIGHTS 8,971 m of new surface exploration drilling designed to test near mine potential at depth and in under-drilled gap zones between defined deposit footprints. Approximately 65% of drilling transected areas outside the Cariboo Gold deposit. Highlight intercepts from outside the footprint of the current mineral resource across multiple zones on strike, include: 13.19 g/t Au over 3.60 m at 596 m vertical depth, 6.40 g/t Au over 6.30 m at 326 m vertical depth (including 40.60 g/t Au over 0.50 m, 19.10 g/t Au over 0.70 m, and 4.56 g/t Au over 0.70 m), 6.17 g/t Au over 7.10 m at 517 m vertical depth (including 73.20 g/t Au over 0.50 m, 10.40 g/t Au over 0.50 m, and 2.21 g/t Au over 0.50 m) and 28.90 g/t Au over 0.50 m at 718 m vertical depth. Results to date confirm the presence of high-grade mineralization at depth and reinforce the strong potential for upside within under-tested gap zones and below the current Cariboo Gold deposit footprint, which extends to an average depth of approximately 350 metres. 5 drill rigs continue operating at surface systematically testing targets down-dip of the current Mineral Resource to a maximum vertical depth of up to 800 metres. MONTREAL, July 08, 2026 (GLOBE NEWSWIRE) -- Osisko Development Corp. (NYSE: ODV, TSXV: ODV) ("Osisko Development" or the "Company") is pleased to announce new drilling results from eleven (11) surface diamond drill holes that were completed as part of an ongoing deeps and near mine gap infill exploration program at the Company's permitted, 100%-owned Cariboo Gold Project ("CGP" or the "Project"), located in central British Columbia, Canada. Chris Lodder, President, stated, "We are encouraged by the initial results of the surface exploration drill program at the Cariboo Gold Project, which intercepted mineralization in all eleven drill holes. Strong high-grade intercepts in previously untested areas and known under-tested gaps continue to demonstrate the at depth potential for resource growth beyond our current mineral inventory. These results reinforce our view that we are only beginning to define the full extent of the mineralized system at depth, while identifying compelling near-mine upside opportunities — all within the Project's existing permitted footprint. We are at an early stage of this program and are excited to keep drilling." DRILL ASSAY HIGHLIGHTS This news release includes assays from eleven (11) surface deeps and gap zone exploration diamond drill ("DD") holes totaling 8,971 metres ("m") with depths ranging from 114 to 1,159 m (see Table 1 and Figure 2) completed between December 2025 and April 2026. Approximately 65%, or 5,823 m of drilling transected areas outside the current Cariboo Gold Mineral Resources, as defined by a 15 m buffer around optimized Mineral Reserves and Mineral Resources stope shapes1. All holes were collared in HQ (63.5 millimetre diameter) and reduced to NQ (47.6 millimetre diameter) where necessary to continue advance or implement directional drilling. Available tooling for directional drilling requires advance in NQ with a BQ (36.5 millimetre diameter) output while steering is active. All assays were received by June 1, 2026. Select assay highlights from intercepts outside the current Mineral Resources footprint include: 42.42 grams per tonne ("g/t") gold ("Au") over 1.50 m in IM-26-001 at 111 m vertical depth (Figure 2), including: 122.50 g/t Au over 0.50 m, and 3.17 g/t Au over 0.50 m 6.40 g/t Au over 6.30 m in IM-26-001 at 326 m vertical depth, including: 40.60 g/t Au over 0.50 m, and 19.10 g/t Au over 0.70 m, and 4.56 g/t Au over 0.70 m 6.17 g/t Au over 7.10 m in IM-26-003 at 517 m vertical depth, including: 73.20 g/t Au over 0.50 m, and 10.40 g/t Au over 0.50 m, and 2.21 g/t Au over 0.50 m 13.19 g/t Au over 3.60 m in IM-26-003 at 596 m vertical depth, including: 73.10 g/t Au over 0.50 m, and 15.95 g/t Au over 0.50 m, and 2.25 g/t Au over 0.60 m, and 1.93 g/t Au over 0.50 m 4.87 g/t Au over 5.90 m in IM-26-003 at 524 m vertical depth, including: 29.00 g/t Au over 0.50 m, and 17.15 g/t Au over 0.50 m, and 4.56 g/t Au over 0.50 m, and 2.81 g/t Au over 0.50 m 6.61 g/t Au over 4.50 m in IM-26-003 at 425 m vertical depth (Figure 3), including: 41.00 g/t Au over 0.50 m, and 5.84 g/t Au over 0.50 m, and 4.40 g/t Au over 0.50 m, and 2.91 g/t Au over 0.50 m, and 2.24 g/t Au over 0.50 m 2.79 g/t Au over 8.25 m in IM-26-001 at 436 m vertical depth, including: 19.65 g/t Au over 0.50 m, and 9.30 g/t Au over 0.50 m, and 3.06 g/t Au over 0.50 m, and 6.36 g/t Au over 0.50 m, and 4.03 g/t Au over 0.50 m 13.83 g/t Au over 1.55 m in IM-26-003 at 277 m vertical depth, including: 38.70 g/t Au over 0.55 m 8.81 g/t Au over 2.25 m in CM-26-001 at 370 m vertical depth, including: 23.10 g/t Au over 0.50 m, and 16.00 g/t Au over 0.50 m 17.32 g/t Au over 1.00 m in CM-25-003 at 371 m vertical depth, including: 33.10 g/t Au over 0.50 m Complete assay highlights, including true width estimates and vertical depths from surface, are presented in Tables 1 and 2, split by relative position within and outside of the current footprint of the Cariboo Gold Mineral Resources1. Drill hole locations and collar orientations are listed in Table 2. Intervals not recovered by drilling were assigned zero grade. Top cuts have not been applied to high grade assays. Figure 1: Plan view Cariboo deep and gap zone surface drilling select intercept highlights. Figure 2: 42.42 g/t Au over 1.50 m in IM-26-001 at 111 m vertical depth. Figure 3: 6.61 g/t au over 4.50 m in IM-26-003 at 425 m vertical depth. Figure 4: 2.79 g/t Au over 8.25 m in IM-26-001 at 436 m vertical depth. Figure 5: Long section displaying Cariboo deeps and gap zone surface drilling with select intercept highlights. DISCUSSION OF RESULTS Results to date confirm the presence of high-grade mineralization at depth and reinforce the strong potential for resource growth upside well beyond the 350 m average of depth of the current deposit. The consistency of broad high-grade intercepts in drill holes testing through and under the Shaft-Mosquito Gap, as seen in IM-26-002 and IM-26-003 (Figure 5), suggests high potential for near mine upside within this previously undertested zone. Significant number of intercepts in Table 1 (length weighted assay composites and individual samples>=1.8 g/t Au within the footprint of the current Mineral Resources) demonstrate notable continuity and possible resource upside potential. All eleven holes released encountered assay composites >=1.8 g/t Au, with ten holes encountering assay composites >=1.8 g/t Au outside the current Mineral Resources. One hole (CM-25-001) was stopped early at 114 m due to historical workings intercepted at 108 m downhole. ABOUT THE CARIBOO DEEP PROGRAM This ongoing program is designed to test the potential for vein corridor extensions of the existing Cariboo Gold deposit down to vertical depths of up to 800 m. The defined limit of the existing Cariboo Gold Mineral Resources and Mineral Reserves reflects limitations imposed by local topography and the practical depth of surface drills for achieving intercept spacing required for a mineral resource estimate, which is approximately 350 m vertical on average across the 4.4 km strike of the deposit. The program is also designed to target under-tested gap areas between defined deposit zones where historic mining was observed, including, for example, the ~1.2 km gap between the Shaft and Mosquito Creek Zones. Drillholes collared within the defined resource provide additional infill intercepts at shallower depths. Directional drilling has been implemented on select drillholes for higher precision targeting to depth. Ongoing surface drilling will continue to systematically test down-dip of the current resource to a maximum along strike target spacing of 300 m. Additional holes at target spacing 50 m near surface and 100 m at depth will be drilled to test continuity around the most prospective intercepts outside the current Mineral Resources footprint. New lithologic data incorporated into updated and extended geologic models is expected to aid in further refining of at depth targets. Table 1: Length weighted assay composites and individual samples>=1.8 g/t for Cariboo Deep diamond drill intercepts within the footprint of the current resource. Drillhole ID   From (m) To (m) Length (m) Au g/t Est. True Width (m) Vertical Depth (m) CM-25-001   100.30 104.25 3.95 2.73 2.54 78    Including 102.65 103.75 1.10 8.68     CM-25-002   65.40 65.90 0.50 1.91 0.35 51      101.80 104.80 3.00 2.74 2.12 80    Including 101.80 103.30 1.50 3.24       and 103.30 104.80 1.50 2.23         177.10 180.50 3.40 9.31 2.30 140    Including 177.10 177.60 0.50 2.57       and 177.60 178.10 0.50 38.10       and 179.50 180.00 0.50 16.25       and 180.00 180.50 0.50 3.03         187.25 187.80 0.55 9.30 0.39 147      191.70 196.20 4.50 4.41 3.18 153    Including 193.70 194.20 0.50 12.75       and 195.70 196.20 0.50 25.00         208.00 211.75 3.75 3.63 2.41 166    Including 209.00 209.50 0.50 24.90         230.40 231.90 1.50 2.26 1.41 184    Including 230.90 231.40 0.50 6.45         233.50 234.00 0.50 16.05 0.50 186      235.00 236.00 1.00 17.47 0.42 188    Including 235.00 235.50 0.50 34.50         248.30 251.20 2.90 12.09 1.77 200    Including 249.70 250.45 0.75 26.50       and 250.45 251.20 0.75 19.60         264.90 266.90 2.00 12.83 1.41 214    Including 265.40 265.90 0.50 5.61       and 265.90 266.40 0.50 45.40     CM-25-003   86.50 87.00 0.50 3.19 0.25 72      142.35 142.85 0.50 3.10 0.25 117      178.85 179.85 1.00 1.83 0.77 147    Including 179.35 179.85 0.50 2.00         197.45 200.15 2.70 1.88 2.24 163    Including 199.65 200.15 0.50 8.22         215.30 215.80 0.50 1.87 0.35 177      248.70 249.70 1.00 2.44 0.91 204    Including 249.20 249.70 0.50 4.39         312.85 313.85 1.00 2.26 0.67 255    Including 312.85 313.35 0.50 4.21         321.40 322.40 1.00 2.11 0.71 262    Including 321.40 321.90 0.50 3.86       and 346.00 347.00 1.00 8.40 0.71 281      351.85 353.50 1.65 10.62 1.13 286    Including 351.85 353.00 1.15 15.20         355.90 357.00 1.10 3.35 0.90 290    Including 355.90 356.50 0.60 5.94         364.25 364.75 0.50 3.06 0.38 296      365.90 368.15 2.25 64.13 1.87 298    Including 367.65 368.15 0.50 288.00         392.05 392.55 0.50 2.34 0.39 320  CM-26-001   171.10 172.85 1.75 7.30 1.39 129    Including 172.35 172.85 0.50 24.90         198.80 199.80 1.00 2.06 0.64 149    Including 199.30 199.80 0.50 3.43         340.70 343.60 2.90 2.93 1.96 254    Including 340.70 341.85 1.15 5.61       and 341.85 342.55 0.70 2.45         344.75 346.20 1.45 2.20 0.98 257    Including 345.25 346.20 0.95 3.20         352.70 353.80 1.10 2.20 0.63 263    Including 353.20 353.80 0.60 3.81       and 356.10 356.60 0.50 2.81 0.41 265      473.75 474.75 1.00 1.88 0.76 356    Including 474.25 474.75 0.50 2.09     CM-26-002   35.40 36.55 1.15 5.76 0.74 15    Including 35.90 36.55 0.65 10.00         61.50 64.25 2.75 1.85 2.11 24    Including 62.00 62.50 0.50 9.38         73.00 74.40 1.40 3.49 1.03 28    Including 73.00 73.60 0.60 2.43       and 73.60 74.40 0.80 4.29         76.45 84.00 7.55 3.26 5.34 31    Including 77.45 77.95 0.50 2.06       and 78.45 79.50 1.05 13.10       and 80.10 81.00 0.90 8.55         92.85 97.00 4.15 5.30 3.99 36    Including 93.35 94.00 0.65 13.05       and 94.00 94.50 0.50 25.80         172.00 172.50 0.50 5.77 0.43 72      201.50 202.90 1.40 2.48 1.07 90      207.85 208.35 0.50 1.82 0.38 92      213.20 213.70 0.50 1.86 0.38 94      222.80 226.75 3.95 11.11 2.91 99    Including 223.55 224.05 0.50 66.80       and 224.55 225.05 0.50 16.85         232.90 234.00 1.10 2.19 0.71 102    Including 233.40 234.00 0.60 3.85         253.90 257.00 3.10 8.29 2.61 114    Including 253.90 254.40 0.50 2.97       and 254.40 254.90 0.50 45.00       and 254.90 255.40 0.50 3.14         261.25 264.30 3.05 3.37 1.96 118    Including 261.25 261.75 0.50 15.45       and 262.85 263.55 0.70 3.12         268.50 269.50 1.00 2.42 0.64 123    Including 269.00 269.50 0.50 4.60         305.30 305.80 0.50 10.60 0.32 145      319.00 322.00 3.00 5.50 2.12 154    Including 321.50 322.00 0.50 31.80         390.50 392.35 1.85 1.93 1.31 197    Including 390.50 391.00 0.50 5.35         410.00 418.00 8.00 2.41 6.13 212    Including 411.00 411.50 0.50 10.80       and 415.00 415.50 0.50 15.80       and 416.00 416.50 0.50 9.69         442.00 443.10 1.10 2.35 0.78 231      449.15 449.85 0.70 2.22 0.45 236      452.65 457.00 4.35 2.34 2.80 240    Including 456.40 457.00 0.60 16.25         458.30 461.85 3.55 12.30 2.91 243    Including 459.50 460.90 1.40 17.50       and 460.90 461.85 0.95 19.75         485.90 486.40 0.50 8.40 0.37 260      537.50 542.90 5.40 21.35 4.14 300    Including 540.65 541.15 0.50 3.15       and 541.15 542.40 1.25 89.80     CM-26-003   36.00 36.50 0.50 11.20 0.38 29      153.00 153.70 0.70 3.04 0.43 115      264.00 264.50 0.50 2.07 1.00 198      353.90 354.90 1.00 2.22 0.64 265    Including 353.90 354.40 0.50 4.10         373.00 374.00 1.00 2.28 0.82 279      377.00 377.50 0.50 2.09 0.32 281  IM-25-001   46.25 47.00 0.75 38.30 0.65 37      49.05 50.05 1.00 8.41 0.87 40    Including 49.05 49.55 0.50 16.70         93.00 94.70 1.70 2.74 1.60 84    Including 93.65 94.20 0.55 7.53         128.65 129.15 0.50 4.31 0.41 118      180.00 181.00 1.00 2.17 1.65 169      190.00 192.25 2.25 1.89 1.84 180    Including 190.70 191.20 0.50 3.96       and 191.75 192.25 0.50 4.03         248.50 249.00 0.50 2.02 0.32 237      296.60 297.60 1.00 2.02 0.57 285    Including 297.10 297.60 0.50 3.11         334.60 336.40 1.80 2.50 1.56 324    Including 334.60 335.20 0.60 5.42         340.45 352.50 12.05 5.07 7.47 335    Including 340.95 341.85 0.90 20.20       and 341.85 342.45 0.60 2.70       and 343.00 343.55 0.55 6.62       and 343.55 344.05 0.50 14.75       and 344.70 345.50 0.80 1.81       and 345.50 346.05 0.55 2.73       and 346.05 347.45 1.40 15.15         361.00 365.00 4.00 2.56 3.06 351    Including 361.50 362.00 0.50 16.20       and 363.00 363.55 0.55 2.68         371.85 372.85 1.00 2.47 0.69 360    Including 371.85 372.35 0.50 3.55         379.75 383.25 3.50 3.13 2.92 369    Including 379.75 380.25 0.50 3.57       and 380.25 380.75 0.50 3.55       and 381.25 381.75 0.50 4.52       and 381.75 382.25 0.50 5.93       and 382.25 382.75 0.50 4.05         399.05 401.05 2.00 9.11 1.65 388    Including 399.05 399.55 0.50 32.10       and 400.55 401.05 0.50 4.00         410.75 412.70 1.95 4.39 1.83 399    Including 410.75 411.25 0.50 5.91       and 411.25 412.20 0.95 5.80         516.75 517.75 1.00 1.83 0.77 504    Including 516.75 517.25 0.50 3.19     IM-26-001   237.00 238.50 1.50 2.13 1.36 215      456.55 457.10 0.55 2.64 0.44 401  IM-26-002   90.50 92.65 2.15 13.48 1.82 52    Including 90.50 91.00 0.50 55.60         152.20 153.70 1.50 1.85 1.23 93    Including 152.70 153.20 0.50 1.93       and 153.20 153.70 0.50 3.50         221.00 222.60 1.60 9.18 1.41 144    Including 221.00 221.50 0.50 25.80       and 221.50 222.00 0.50 3.29         241.40 243.70 2.30 5.05 1.99 161    Including 241.40 242.50 1.10 10.40         290.30 292.65 2.35 5.34 1.80 201    Including 290.30 291.50 1.20 9.48         306.75 309.75 3.00 4.14 2.57 214    Including 308.75 309.25 0.50 1.95       and 309.25 309.75 0.50 21.60     IM-26-004   56.15 59.05 2.90 1.81 2.22 53    Including 56.15 57.00 0.85 4.53         62.40 66.80 4.40 7.62 3.81 60    Including 62.40 63.40 1.00 1.84       and 64.15 64.65 0.50 2.41       and 64.65 65.15 0.50 58.30         73.20 74.70 1.50 11.58 1.15 69    Including 73.20 73.70 0.50 16.10       and 74.20 74.70 0.50 18.60         76.00 77.15 1.15 4.60 1.00 72      223.15 224.50 1.35 2.09 1.03 208    Including 224.00 224.50 0.50 5.45         233.75 234.80 1.05 2.75 0.91 215    Including 233.75 234.25 0.50 5.56         279.00 279.50 0.50 3.70 0.49 250      283.50 284.00 0.50 3.81 0.49 253      294.00 294.50 0.50 4.37 0.47 261      378.00 378.80 0.80 1.93 0.51 307      387.50 388.00 0.50 3.29 0.49 310  Table 2: Length weighted assay composites and individual samples>=1.8 g/t for Cariboo Deep diamond drill intercepts outside the footprint of the current resource. Drillhole ID   From (m) To (m) Length (m) Au g/t Est. True Width (m) Vertical Depth (m) CM-25-002   424.25 424.75 0.50 3.56 0.42 354  CM-25-003   440.50 441.50 1.00 2.89 0.77 360    Including 441.00 441.50 0.50 5.62         454.50 455.50 1.00 17.32 0.77 371    Including 455.00 455.50 0.50 33.10         643.85 644.35 0.50 10.35 0.38 524      704.25 704.75 0.50 4.01 0.29 564  CM-26-001   492.50 494.75 2.25 8.81 1.72 370    Including 492.50 493.00 0.50 23.10       and 493.00 493.50 0.50 16.00         496.75 497.25 0.50 2.64 0.38 372      540.00 542.50 2.50 3.48 2.11 404    Including 540.70 541.40 0.70 3.56       and 542.00 542.50 0.50 11.95         546.30 548.30 2.00 2.25 1.49 409    Including 546.80 547.30 0.50 5.22       and 547.30 547.80 0.50 3.23         550.75 551.25 0.50 4.14 0.38 411  CM-26-002   642.30 642.95 0.65 2.29 0.50 378      655.60 658.40 2.80 3.58 1.94 388    Including 655.60 657.05 1.45 6.07         698.00 698.50 0.50 4.88 0.29 418      790.65 791.95 1.30 1.97 0.75 494      892.70 893.20 0.50 4.57 0.29 572  CM-26-003   442.35 442.85 0.50 1.92 0.43 323      445.40 445.90 0.50 2.37 0.41 324      456.50 457.50 1.00 1.89 0.64 325    Including 456.50 457.00 0.50 2.72         459.50 460.00 0.50 3.33 0.47 325      462.00 462.50 0.50 3.85 0.35 326      477.05 479.00 1.95 2.43 1.67 328    Including 477.05 478.00 0.95 2.72       Including 478.00 478.50 0.50 4.09         543.40 550.75 7.35 2.12 5.42 347    Including 544.90 545.40 0.50 14.80       and 548.00 548.50 0.50 2.00       and 549.90 550.75 0.85 4.49         552.25 557.10 4.85 1.80 2.61 350      555.10 556.60 1.50 4.29         565.75 566.75 1.00 9.85 0.61 355    Including 565.75 566.25 0.50 19.60         568.15 568.65 0.50 3.24 0.29 355      659.50 660.00 0.50 2.41 0.35 400      708.60 709.10 0.50 2.85 0.47 430      801.50 802.00 0.50 2.65 0.35 490      822.90 823.90 1.00 3.94 0.71 506    Including 822.90 823.40 0.50 2.19       and 823.40 823.90 0.50 5.68         830.60 831.20 0.60 1.86 0.39 511  IM-25-001   563.80 564.80 1.00 2.07 0.87 551    Including 564.30 564.80 0.50 3.78     IM-26-001   115.40 115.90 0.50 5.01 0.35 101      126.05 127.55 1.50 42.42 1.27 111    Including 126.05 126.55 0.50 3.17       and 126.55 127.05 0.50 122.50         151.00 152.60 1.60 2.16 1.39 135    Including 151.00 151.60 0.60 5.52         359.30 365.60 6.30 6.40 5.85 326    Including 359.30 360.00 0.70 19.10       and 360.50 361.00 0.50 40.60       and 362.50 363.20 0.70 4.56         424.00 427.60 3.60 2.34 3.01 376    Including 424.00 424.50 0.50 12.30       and 425.00 425.50 0.50 2.21         456.55 457.10 0.55 2.64 0.44 401      494.25 502.50 8.25 2.79 6.92 436    Including 494.25 494.75 0.50 19.65       and 495.25 495.75 0.50 9.30       and 498.50 499.00 0.50 3.06       and 499.50 500.00 0.50 6.36       and 501.00 501.50 0.50 4.03         515.50 516.00 0.50 4.20 0.41 472      536.85 537.85 1.00 3.20 0.87 452    Including 537.35 537.85 0.50 6.24         555.75 556.25 0.50 21.90 0.35 490      628.00 629.50 1.50 2.93 1.41 559      798.50 799.00 0.50 28.90 0.29 718  IM-26-002   505.75 507.00 1.25 1.98 0.98 358    Including 505.75 506.30 0.55 4.21         578.00 578.50 0.50 7.72 0.38 413      619.30 619.80 0.50 2.22 0.38 442      646.90 647.55 0.65 4.77 0.50 463  IM-26-003   26.60 28.60 2.00 7.42 1.73 18    Including 27.10 28.10 1.00 13.75         289.10 289.60 0.50 5.78 0.41 210      308.00 309.40 1.40 3.92 0.70 225      377.45 379.00 1.55 13.83 1.19 277    Including 377.95 378.50 0.55 38.70         554.50 555.00 0.50 23.30 0.35 404      579.50 584.00 4.50 6.61 3.32 425    Including 579.50 580.00 0.50 5.84       and 581.00 581.50 0.50 41.00       and 581.50 582.00 0.50 2.24       and 582.00 582.50 0.50 2.91       and 582.50 583.00 0.50 4.40         694.45 695.45 1.00 2.88 0.57 501    Including 694.95 695.45 0.50 5.46         708.60 709.15 0.55 4.14 0.32 510      717.40 724.50 7.10 6.17 5.22 517    Including 717.90 718.40 0.50 2.21       and 722.00 722.50 0.50 73.20       and 724.00 724.50 0.50 10.40         725.75 726.75 1.00 2.79 0.66 520    Including 726.25 726.75 0.50 4.95         730.35 736.25 5.90 4.87 4.40 524    Including 731.50 732.00 0.50 2.81       and 732.00 732.50 0.50 29.00       and 734.75 735.25 0.50 4.56       and 735.75 736.25 0.50 17.15         771.75 773.10 1.35 1.98 1.05 548    Including 772.60 773.10 0.50 5.07         818.80 819.30 0.50 4.61 0.41 578      842.30 845.90 3.60 13.19 1.89 596    Including 842.30 842.80 0.50 15.95       and 843.30 843.80 0.50 73.10       and 844.30 844.90 0.60 2.25       and 844.90 845.40 0.50 1.93         938.70 940.20 1.50 5.25 0.93 664    Including 938.70 939.20 0.50 2.47       and 939.70 940.20 0.50 13.25     Table 3: Surface DD collar locations, orientations, and max drillhole depths. Negative dips point down. Drillhole ID Target Area Easting (UTM Zn 10N) Northing (UTM Zn 10N) Elevation (m) Depth (m) Collar Dip Collar Azimuth CM-25-001 Valley 595349 5883999 1201.37 114 -50 100  CM-25-002 Valley / Cow 595364 5883994 1201.40 757.4 -51 101  CM-25-003 Valley / Cow 595298 5884177 1200.79 891.5 -55 100  CM-26-001 Cow 595644 5883770 1282.97 1003 -45 100  CM-26-002 Cow / Valley 595643 5883764 1284.38 1027 -45 323  CM-26-003 Cow 595900 5883610 1359.41 1159.1 -45 105  IM-25-001 Shaft 594918 5884184 1295.53 720 -45 315  IM-26-001 Shaft 594989 5884345 1302.34 808.35 -45 310  IM-26-002 Shaft / Mosquito-Shaft Gap 594615 5884520 1396.15 868.4 -45 305  IM-26-003 Mosquito-Shaft Gap 594244 5884732 1411.35 983.3 -50 320  IM-26-004 Shaft 594914 5884187 1292.45 639 -45 305  CORPORATE NAME CHANGE As previously announced, Osisko Development Corp. intends to change its name to Osisko Gold Group Inc., after receiving shareholder approval for the change of name at its annual and special meeting held on June 23, 2026. Also as previously announced, the Company intends to change the trading symbol for its common shares on both the TSX Venture Exchange ("TSXV") and the New York Stock Exchange ("NYSE") from "ODV" to "OGG". The Company anticipates the legal change in name to become effective on July 20, 2026, and expects its common shares to begin trading under the new symbol "OGG" on both the TSXV and the NYSE effective at market open on July 20, 2026. The trading symbols for the Company's common share purchase warrants are also expected to change effective at market open on July 20, 2026: (i) warrants trading under "ODVWZ" on the Nasdaq Stock Market ("Nasdaq") and "ODV.WT.U" on the TSXV will change to "OGGWZ" and "OGG.WT.U", respectively; and (ii) warrants trading on the TSXV under "ODV.WT.A" and "ODV.WT.V" will change to "OGG.WT.A", and "OGG.WT.V", respectively. In connection with the name and symbol changes of the Company's listed securities, the CUSIPs and ISIN's of the Company's securities will change as well. For the Company's common shares, the CUSIP and ISIN will be changed to 68827X105 and CA68827X1050, respectively. In addition, the following new CUSIP and ISIN numbers have been assigned to the warrants of the Company: (i) OGG.WT.A: CUSIP 68827X139 and ISIN CA68827X1399; (ii) OGG.WT.U (TSXV) and OGGWZ (Nasdaq): CUSIP 68827X113 and ISIN CA68827X1134; and (iii) OGG.WT.V: CUSIP 68827X121 and ISIN CA68827X1217. ABOUT CARIBOO GOLD PROJECT The Cariboo Gold Project is a permitted, 100%-owned feasibility-stage project located in the historic Wells-Barkerville mining camp of central British Columbia, Canada. Spanning approximately 186,740 hectares, the Company's land package includes 443 mineral titles and covers an area that extends approximately 77-kilometres from northwest to southeast. In late 2024, the Project was granted the Mines Act and Environmental Management Act (British Columbia) permits, marking the successful completion of the permitting process for key approvals, solidifying the Project's shovel-ready status. The Cariboo Gold Project hosts Probable Mineral Reserves of 2.07 million ounces of contained Au (17,815 kt grading 3.62 g/t Au); Measured Mineral Resources of 8,000 ounces of contained Au (47 kt grading 5.06 g/t Au); Indicated Mineral Resources of 1.60 million ounces of contained Au (17,332 kt grading 2.88 g/t Au); and Inferred Mineral Resources of 1.86 million ounces of contained Au (18,774 kt grading 3.09 g/t Au). Mineral Resources are reported exclusive of Mineral Reserves. Technical Reports Scientific and technical information relating to the Cariboo Gold Project and the 2025 feasibility study on the Cariboo Gold Project is supported by the technical report, titled "NI 43-101 Technical Report, Feasibility Study for the Cariboo Gold Project, District of Wells, British Columbia, Canada" and dated June 11, 2025 (with an effective date of April 25, 2025) (the "Cariboo Technical Report"). For readers to fully understand the information in the Cariboo Technical Report, reference should be made to the full text of the Cariboo Technical Report in its entirety, including all assumptions, parameters, qualifications, limitations and methods therein. The Technical Report is intended to be read as a whole, and sections should not be read or relied upon out of context. The Technical Report was prepared in accordance with National Instrument 43-101 – Standards of Disclosure for Mineral Projects ("NI 43-101") and is available electronically on SEDAR+ (www.sedarplus.ca) and on EDGAR (www.sec.gov) under Osisko Development's issuer profile and on the Company's website at www.osiskodev.com. Qualified Persons The scientific and technical information contained in this news release has been reviewed, verified and approved by Scott Smith, P. Geo., Vice President, Exploration of Osisko Development, a "qualified person" within the meaning of NI 43-101. Verification includes core photo and three-dimensional review of logged drillhole data and assays consistent with the Company's standard procedures. Quality Assurance (QA) – Quality Control (QC) HQ and NQ diameter drill core is cut (halved) on site at the Cariboo Project subsequent to QAQC checks for logging and sampling errors. BQ core (limited to directional intervals) are whole core sampled following daily QAQC. Any BQ intercepts external to the footprint of the current resource (none herein) are to be excluding from informing any new resource shapes. Quality control (QC) samples are inserted at regular intervals in the sample stream, including blanks and reference materials with all sample shipments to monitor laboratory performance. Samples are bagged, labeled, sealed with numbered security tags All drill core samples are submitted to ALS Geochemistry's analytical facility in North Vancouver, British Columbia for preparation and analysis. The ALS facility is accredited to the ISO/IEC 17025 standard for gold assays, and all analytical methods include quality control materials at set frequencies with established data acceptance criteria. The entire sample is crushed, and 250 grams is pulverized. Analysis for gold is by 50 gram fire assay fusion with atomic absorption (AAS) finish with a lower limit of 0.01 ppm and upper limit of 100 ppm. Samples with gold assays greater than 100 ppm are re-analyzed by fire-assay with gravimetric finish (upper limit 10,000 ppm). Select samples containing visible gold and/or cosalite are flagged during logging for an additional 1,000-gram screen metallic fire assay to ensure accurate quantification of any coarse fraction. All samples are also analyzed using a 48 multi-elemental geochemical package by a 4-acid digestion, followed by Inductively Coupled Plasma Atomic Emission Spectroscopy (ICP-AES) and Inductively Coupled Plasma Mass Spectroscopy (ICP-MS). End Notes (excluding tables) Refer to the Cariboo Technical Report for the assumptions, qualifications and limitations relating to disclosure about the Cariboo Gold Project and the 2025 feasibility study on the Cariboo Gold Project. ABOUTOSISKODEVELOPMENTCORP. Osisko Development Corp. is a continental North American gold development company focused on past producing mining camps with district scale potential. The Company's objective is to become an intermediate gold producer through the development of its flagship, fully permitted, 100%-owned Cariboo Gold Project, located in central British Columbia, Canada. Its project pipeline is complemented by the Tintic Project located in the historic East Tintic mining district in Utah, U.S.A., a brownfield property with significant exploration potential, extensive historical mining data, and access to established infrastructure. Osisko Development is focused on developing long-life mining assets in mining-friendly jurisdictions while maintaining a disciplined approach to capital allocation, development risk management, and mineral inventory growth. For further information, visit our website at www.osiskodev.com or contact: Sean Roosen Philip Rabenok Chairman and CEO Vice President, Investor Relations Email: [email protected] Email: [email protected] Tel: +1 (514) 940-0685 Tel: +1 (437) 423-3644     CAUTION REGARDING FORWARD LOOKING STATEMENTS This news release contains "forward-looking information" (within the meaning of applicable Canadian securities laws) and "forward-looking statements" (within the meaning of the U.S. Private Securities Litigation Reform Act of 1995, as amended) (collectively, "forward-looking statements"). Such forward-looking statements are identified with words such as "may", "will", "would", "could", "anticipate", "believe", "expect", "plan", "intend", "potential", "estimate", "propose", "project", "outlook", "foresee", "objective", "strategy", variants of these words or the negative or comparable terminology, as well as terms usually used in the future and the conditional. Information contained in forward-looking statements is based upon certain material assumptions that were applied in drawing a conclusion or making a forecast or projection, including the assumptions, qualifications, limitations or statements pertaining to: the utility and significance of the exploration drilling designed to test near mine potential at depth and in under-drilled gap zones; the results and interpretation thereof confirming the presence of high-grade mineralization at depth; the strong potential for upside and resource growth beyond the current mineral inventory at the Cariboo Gold Project; the utility and significance of the results and interpretation in providing positive indication of understanding (if any) of the potential full extent of the mineralized system at depth and whether compelling near-mine upside opportunities exist (if at all); the significance of continued drilling at depth and in underexplored zones; the interpretation and accuracy of intercepts to suggest possible extensions of vein corridors, with potential for resource conversion and upside mineralization; the interpretation of drill results being outside the current areas of the Cariboo Gold deposit; the strong potential for resource growth upside well beyond the 350 metre average of depth of the current deposit (if at all); the consistency of broad high-grade intercepts in drill holes testing through and under the Shaft-Mosquito Gap and the potential for near mine upside within this previously untested zone (if at all); the interpretation and accuracy of intercepts demonstrating continuity and possible resource upside potential ; the utility and significance of incorporating new lithologic data into updated and extended geologic models and its expectation of aiding in further refining of at depth targets (if at all); the prospectivity of exploration in targets outside of currently defined mineral reserves and/or mineral resources; the interpretation and accuracy of spatial geometries, geological structure and local variability modeling and assumptions in regard to potential reserve or resource revisions (if at all); the results (if any) of further exploration work and ability of the Company to define and expand mineral resources beyond current mineral resource estimates; the ability and utility of exploration work (including drilling) to inform resource modeling, mine planning, production stope design procedures and parameters, refinement of infill drill requirements, and the appropriate drill spacing for future infill drilling (if at all); assumptions, qualifications and parameters underlying the Cariboo Technical Report (including, but not limited to, the mineral resources, mineral reserves, production profile, mine design and project economics); the results of the Cariboo Technical Report as an indicator of quality and robustness of the Cariboo Gold Project, as well as other considerations that are believed to be appropriate in the circumstances; the ability of the Company to achieve the estimates outlined in the Cariboo Technical Report in the timing contemplated (if at all); mineral resource category conversion; the future development and operations at the Cariboo Gold Project; management's perceptions of historical trends, current conditions and expected future developments; the utility and significance of historic data, including the significance of the district hosting past producing mines; the ability of exploration work (including drilling and sampling) to accurately predict mineralization; the ability of the Company to complete its exploration and development objectives for its projects in the timing contemplated and within expected costs (if at all); the ability to adapt to changes in gold prices, estimates of costs, estimates of planned exploration and development expenditures; the Company's strategy and objectives relating to the Cariboo Gold Project as well as its other projects; the assumptions, qualifications and limitations relating to the Cariboo Gold Project being permitted; the exploration potential and prospectivity (if any) of its properties; the Company's anticipated name change and trading of its securities under its updated stock ticker symbols (including timing thereof); regulatory framework remaining defined and understood as well as other considerations that are believed to be appropriate in the circumstances, and any other information herein that is not a historical fact may be "forward looking information". Actual results could differ materially due to a number of factors, including, without limitation: the change in the Company's trading symbols and the marketplace effective date of such changes, risks relating to third-party approvals, including the issuance of permits by governments, capital market conditions and the Company's ability to access capital on terms acceptable to the Company for the contemplated exploration and development at the Company's properties; risks related to the exploration, development and operation of the Cariboo Gold Project; risks related to geological modeling and resource estimation; health, safety and security incidents; regulatory delays or changes in regulatory framework and applicable laws; labour shortages or disputes; general economic and market conditions and business conditions in the mining industry; fluctuations in commodity and currency exchange rates; changes in regulatory framework and applicable laws, as well as those risks and factors disclosed in the Company's most recent annual information form, financial statements and management's discussion and analysis as well as other public filings on SEDAR+ (www.sedarplus.ca) and on EDGAR (www.sec.gov). Although the Company believes the expectations conveyed by the forward-looking statements are reasonable based on information available as of the date hereof, no assurances can be given as to future results, levels of activity and achievements. The Company disclaims any obligation to update any forward-looking statements, whether as a result of new information, future events or results or otherwise, except as required by law. Forward-looking statements are not guarantees of performance and there can be no assurance that these forward-looking statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking statements. Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this news release. No stock exchange, securities commission or other regulatory authority has approved or disapproved the information contained herein. Photos accompanying this announcement are available at https://www.globenewswire.com/NewsRoom/AttachmentNg/4eeeff64-1f84-49a7-8179-5ac9fde4dabb https://www.globenewswire.com/NewsRoom/AttachmentNg/88fe5c1e-b6a9-4d12-ac25-ac28fb0e4a89 https://www.globenewswire.com/NewsRoom/AttachmentNg/e9b03dde-4ba8-4fac-98f5-6d752d906961 https://www.globenewswire.com/NewsRoom/AttachmentNg/c8bb4b85-0070-4da0-a48f-81e56f9a6ed2 https://www.globenewswire.com/NewsRoom/AttachmentNg/65b665c5-659e-43b4-9d66-6d362f846146 Figure 1 Plan view Cariboo deep and gap zone surface drilling select intercept highlights. Figure 2 42.42 g/t Au over 1.50 m in IM-26-001 at 111 m vertical depth. Figure 3 6.61 g/t au over 4.50 m in IM-26-003 at 425 m vertical depth. Figure 4 2.79 g/t Au over 8.25 m in IM-26-001 at 436 m vertical depth. Figure 5 Long section displaying Cariboo deeps and gap zone surface drilling with select intercept highlights. © 2026 Canjex Publishing Ltd. All rights reserved.
View at source ↗