Drill Results
0749116 (Terra Rossa) eyes exploration restart at Vetas

TRR · Price
Executive Summary
- Terra Rossa Gold Ltd. (formerly Baroyeca Gold & Silver Inc.) is launching operations on its 100% owned Vetas gold project in Colombia, following its recent listing on the TSX Venture Exchange under the symbol TRR.
- The company is releasing historical drilling data from 2010–2013 conducted by CB Gold, which identified high-grade gold and silver vein mineralization across 162 diamond drill holes totaling 71,035 meters.
- Terra Rossa plans to advance the project in the near term with an extensive underground sampling and drilling program to expand high-grade vein resources exploitable by underground mining methods.
Key Details
- Listing Information: The company is now listed on the TSX Venture Exchange under the symbol TRR (press release dated Oct. 20, 2025).
- Project Location: Vetas gold project is located in Santander, Colombia, approximately 70 km northeast of Bucaramanga, adjacent to the town of Vetas. It lies within the prolific Vetas-California mining district, 3 km north of the Soto Norte gold project.
- Ownership: The company holds 100% of the Vetas gold project, comprising nine mineral claims covering approximately 313.9 hectares.
- Historical Drilling Summary:
- Total of 162 diamond drill holes completed between 2010 and 2013.
- Total footage: 71,035 meters.
- Focus: Outlining gold-bearing veins and stockwork systems with potential for high-grade Au-Ag vein mineralization.
- Significant Historical Assay Results:
- Hole ED-DDH12-106A (El Dorado): 19.83 g/t Au and 10.6 g/t Ag over 3.3 m (321.43 m to 324.8 m depth).
- Hole AR-DDH11-06 (Arias Zone): 506.69 g/t Au and 89.7 g/t Ag over 0.74 m (162.32 m to 163.06 m depth).
- Hole RM-DDH12-11 (Real Minera): 78.14 g/t Au and 12.66 g/t Ag over 3.31 m (98.2 m to 101.51 m depth).
- Future Work Plan:
- Compile existing data.
- Detailed underground mapping of existing mine workings.
- Detailed underground channel sampling.
- Prioritize targets for subsequent drifting and underground diamond drilling.
- Goal: Better understand and expand delineation of high-grade vein resources for underground mining.
- Quality Assurance/Quality Control (QA/QC):
- 2009–2011: Samples sent to ALS laboratories (Bogota prep, Lima analysis).
- 2011–2013: Samples sent to ACME laboratories (Medellin prep, Vancouver analysis).
- Analysis Methods: 34-element suite via ICP-MS; samples >0.075 ppm Au sent for full metallic screen fire assay. Visible gold/high-grade samples received AA finish; >10 ppm Au received gravimetric finish.
- Accreditation: ACME and ALS Chemex are ISO 17025 accredited.
- Controls: Standards, duplicates, and blanks inserted every 10–20 samples (max 65 samples per batch).
- Technical Review: Information reviewed and approved by Alfonso Rodriguez of APEX Geoscience Ltd., a Qualified Person under National Instrument 43-101.
Notable Quotes
- No direct quotes from the CEO or President were included in the provided text.
More from Terra Rossa Gold Ltd.
Apr 23, 2026 · 08:30