Drill Results
Troy Minerals collects 47 samples at Table Mountain

TROY · Price
Executive Summary
- Troy Minerals Inc. has provided an update on its 2025 exploration program at the 100%-owned Table Mountain High-Purity Silica Project in British Columbia, Canada.
- The company collected 47 channel samples across approximately 2,500 square metres of the main quartzite resource zone to complement UAV lidar surveys and guide upcoming resource definition.
- Analytical results from ALS geochemistry are expected in the coming weeks, with the data intended to refine the planned 2026 drill program and metallurgical testwork.
Key Details
- Project Location: Table Mountain High-Purity Silica Project, near Golden, B.C., Canada.
- Property Size: Approximately 2,526 hectares, encompassing up to 11 kilometres of strike length of the Mount Wilson formation quartzite.
- Sampling Activity:
- Total of 47 channel samples collected.
- Sampling conducted primarily along two main channel lines at one-metre intervals.
- Coverage area of approximately 2,500 square metres.
- Channels oriented perpendicular to bedding to approximate true widths of silica zones.
- Sampling locations positioned to complement 2024 and 2025 UAV lidar surveys.
- Laboratory Analysis:
- Samples submitted to ALS geochemistry in Kamloops.
- Analytical results anticipated in the coming weeks.
- Geological Context:
- Focus on systematic channel sampling across the main quartzite resource zone.
- Recent geological prospecting identified new exposures of Mount Wilson formation quartzite.
- Future Plans:
- Data will guide upcoming resource definition and drilling planned for the 2026 field season.
- UAV lidar survey data from September 2025 is being processed to finalize drill pad and access engineering.
- Strategic Positioning:
- Located near two established high-purity silica operations: Moberly silica mine and Sinova quartz quarry.
- Both neighboring operations demonstrate silica purity greater than 99.6% SiO2.
- Excellent year-round road access and proximity to the Canadian Pacific Railway's Golden rail yard.
Notable Quotes
- "The samples collected this season are designed to tie directly into the upcoming drill program. They expand coverage across the established resource area, providing the data we need to refine near-future drilling and metallurgical testwork." — Yannis Tsitos, President of Troy Minerals
More from Troy Minerals Inc
Feb 03, 2026 · 16:15