Drill Results
Powermax completes phase 2 fieldwork at Cameron

PMAX · Price
Executive Summary
- Powermax Minerals Inc. has completed Phase 2 fieldwork at its Cameron Rare Earth Element (REE) project in British Columbia, following up on Phase 1 results that confirmed light and heavy REE mineralization.
- The Phase 2 program involved systematic geological mapping, rock sampling, and extensive geochemical surveys, collecting 100 soil samples, 100 stream sediment samples, and 29 rock samples.
- Analytical results will be used to refine the geochemical model and delineate new priority drill targets for the next exploration phase.
Key Details
- Project Location: Cameron REE project, Kamloops mining division, British Columbia.
- Phase 2 Activities:
- Geological mapping and systematic rock sampling.
- Extensive geochemical surveys across priority areas.
- Collection of 100 soil samples (B horizon, silty to sandy, 2-30 cm deep).
- Collection of 100 stream sediment samples (classified river gravels and fine sediments sieved through No. 18 mesh).
- Collection of 29 rock samples from exposures of gneissic and pegmatitic rocks, quartz-biotite gneiss, granitic outcrops, and carbonatite lenses.
- Analytical Scope:
- Samples submitted to Agat Laboratories in Calgary, Alta.
- Analysis includes the 201 to 380 metals package for rare-earth elements (REE).
- Two rock samples selected for additional gold testing by fire assay.
- One sample selected for graphite analysis.
- Geological Context:
- Phase 1 confirmed light and heavy rare-earth mineralization within Monashee Group lithologies.
- Mineralization associated with pegmatitic and gneissic units enriched in monazite, allanite, and xenotime.
- Target lithologies include shear zones and structurally controlled pegmatitic intrusions enriched in both light (LREE) and heavy (HREE) elements.
- Next Steps: Data integration with previous geological and geophysical results to refine the geochemical model and define new drill targets.
Notable Quotes
- "The completion of our phase 2 fieldwork represents another important milestone for the Cameron project. The range of lithologies sampled and the systematic coverage of soils and sediments will provide a comprehensive data set to evaluate rare-earth element distribution patterns across the property. We look forward to the upcoming analytical results, which will guide our follow-up exploration and potential drill targeting." — Paul Gorman, CEO
More from Powermax Minerals Inc
Jun 16, 2026 · 06:01