Northwire Canada EditionFriday, August 7, 2026
Northwire
NXS 0.170 +0.0% NTH 0.170 +3.0% IMG 22.48 +0.6% ATY 0.255 +0.0% SMN 0.110 −4.3% WPM 175.79 +1.9% CNC 1.60 −4.8% RME 0.175 +0.0% INTR 0.770 −3.8% PNTR 0.430 −4.4% COPR 0.350 +0.0% YGT 0.180 +0.0% ARIC 0.880 +6.0% LUCA 0.920 −3.2% IVN 11.39 −0.3% HHH 4.30 +9.1% NXS 0.170 +0.0% NTH 0.170 +3.0% IMG 22.48 +0.6% ATY 0.255 +0.0% SMN 0.110 −4.3% WPM 175.79 +1.9% CNC 1.60 −4.8% RME 0.175 +0.0% INTR 0.770 −3.8% PNTR 0.430 −4.4% COPR 0.350 +0.0% YGT 0.180 +0.0% ARIC 0.880 +6.0% LUCA 0.920 −3.2% IVN 11.39 −0.3% HHH 4.30 +9.1%
Drill Results

Powermax Minerals plans phase 1 exploration for Pinard

PMAX · Price

Executive Summary

  • Powermax Minerals Inc. has announced the details of its Phase 1 exploration program for the Pinard Rare Earth Element (REE) project in Northern Ontario.
  • The program aims to integrate historical data with new fieldwork to advance target generation and prioritize areas for follow-up exploration, including potential trenching and drilling.
  • The Pinard property consists of 255 contiguous mining claims spanning 5,178 hectares, located approximately 70 km north-northeast of Kapuskasing, and is characterized by an alkalic-to-peralkalic igneous complex.

Key Details

  • Project Location and Size: The Pinard REE property is located in Northern Ontario, Canada, roughly 70 kilometres north-northeast of Kapuskasing. It comprises 255 contiguous mining claims spanning a total of 5,178 hectares.
  • Access: The mining claims and patents are accessible via an all-weather access road.
  • Geological Context: The Pinard intrusive complex is an alkalic-to-peralkalic igneous body comprising syenitic to granitic phases. It shares tectonomagmatic similarities with the nearby Clay-Howells alkaline complex (20 km southwest), which hosts a known niobium/rare earth element mineralized system.
  • Phase 1 Program Components:
    • Desktop Data Compilation: Comprehensive analysis of historical geological, geophysical, and geochemical datasets integrated into a modern GIS-based exploration platform for spatial analysis and radiometric interpretation.
    • Field Prospecting and Mapping: Systematic prospecting and detailed geological mapping to identify pegmatite zones, mineralized structures, lithological contacts, and alteration patterns.
    • Geochemical Sampling: Multimedia sampling including rock sampling of outcrops/mineralized occurrences, soil sampling across defined target grids, and stream sediment sampling within key drainage catchments.
    • Radiometric Surveys: Hand-held scintillometer surveys to detect radiometric anomalies and pathfinder elements.
    • Airborne Geophysical Survey: High-resolution helicopter-borne magnetic and gamma-ray spectrometric survey over key portions of the project area to identify structural trends, lithological boundaries, and radiometric anomalies.
  • Future Work: The Phase 1 program is intended to generate and rank priority targets for subsequent advanced exploration programs, specifically trenching and potential drilling.
  • Qualified Person: The technical information was reviewed and approved by Afzaal Pirzada, PGeo, a director of the company and a qualified person under National Instrument 43-101.

Notable Quotes

  • "The phase 1 program at Pinard is designed to rapidly advance our technical understanding of the project by combining historical data sets with modern exploration techniques," said Paul Gorman, chief executive officer of Powermax. "This systematic approach will allow us to efficiently identify and prioritize high-quality targets for follow-up work."
Read the original news release →

More from Powermax Minerals Inc