Northwire Canada EditionFriday, August 7, 2026
Northwire
SRC 1.78 +2.9% FTJ 0.040 +0.0% WMS 0.040 +0.0% TUO 1.62 +5.2% LMR 0.120 +0.0% STND 0.075 +3.5% ASE 0.930 +3.3% YGT 0.185 +2.8% SMY 0.200 +0.0% STS 0.235 +9.3% HSTR 2.02 +7.5% CTG 0.110 +0.0% WDO 34.04 +6.4% RSM 0.305 +0.0% NGEX 27.43 +1.9% LUNR 21.28 +1.8% SRC 1.78 +2.9% FTJ 0.040 +0.0% WMS 0.040 +0.0% TUO 1.62 +5.2% LMR 0.120 +0.0% STND 0.075 +3.5% ASE 0.930 +3.3% YGT 0.185 +2.8% SMY 0.200 +0.0% STS 0.235 +9.3% HSTR 2.02 +7.5% CTG 0.110 +0.0% WDO 34.04 +6.4% RSM 0.305 +0.0% NGEX 27.43 +1.9% LUNR 21.28 +1.8%
Drill Results

Norsemont completes one drill hole at Choquelimpie

NOM · Price

Executive Summary

  • Norsemont Mining has completed the initial diamond drill hole (MV25-DD01) and commenced two additional holes (MV25-DD02 and MV25-DD03) as part of its Phase 3 exploration program at the 100%-owned Choquelimpie project in northern Chile.
  • The Phase 3 program is designed to evaluate downdip extensions of higher-grade gold mineralization (>1 g/t Au) hosted in hydrothermal breccia zones, with a total planned scope of up to 5,000 metres across 20 holes.
  • Drilling is being conducted on a 24-hour schedule using two rigs, with results expected to update the 2025 resource model and potentially identify substantial high-grade gold zones at depth and along strike.

Key Details

  • Drill Hole MV25-DD01:
    • Completed to a depth of 300 metres.
    • Targeted the Vizcacha higher-grade hydrothermal breccia.
    • Oriented at an azimuth of 275 degrees and inclined at 70 degrees.
    • Intersected the Vizcacha hydrothermal breccia as predicted, hosting moderate to strong pyrite mineralization (1 to 7%) as disseminations and veinlets.
    • Intersected silica-pyrite and silica-enargite veinlets from 180 metres to the end of hole.
    • Assays are pending.
  • Drill Hole MV25-DD02:
    • Collared from the same station as MV25-DD01.
    • Targeting the Vizcacha hydrothermal breccia to depth.
    • Oriented at an azimuth of 180 degrees, inclined at 80 degrees.
    • Design depth is 225 metres.
    • Currently intersecting the Vizcacha hydrothermal breccia with disseminated and veinlet-hosted sulphides.
  • Drill Hole MV25-DD03:
    • Collared and currently in progress.
    • Targets the Choque zone at depth, below the area where gold grades were calculated in the 2025 resource model (Wilson, 2025).
    • Will intersect a modelled hydrothermal breccia body.
  • Program Scope & Logistics:
    • Phase 3 program comprises up to 5,000 metres of diamond drilling.
    • Planned for up to 20 holes averaging 250 metres in length.
    • Drilling scheduled to continue through late December.
    • Contractor: DV Drilling Ltd. (Coquimbo, Chile).
    • Equipment: One Golden Bear 1400 and one CSK C1500 truck-mounted diamond drills.
    • Operations: 24-hour schedule.
    • Sample Preparation: Activation Geological Services SpA (Antofagasta, Chile).
    • Laboratory Analysis: AGS geochemical laboratory (Coquimbo, Chile), ISO 17025 certified.
    • Downhole Surveys: Conducted by DV Drilling using a gyroscope device.
    • Supervision: Roman Flores, persona calificada with the Commission Minera Chile.
  • Company Context:
    • Choquelimpie is a past-producing gold and silver mine with significant exploration upside.
    • Existing infrastructure includes roads, power, water, camp, and a 3,000-tonne-per-day mill.
    • Current Resource Estimate: Indicated 1,731,000 gold ounces and 33,233,000 silver ounces; Inferred 446,000 gold ounces and 7,219,000 silver ounces.

Notable Quotes

  • Marc Levy, CEO: "With the second and third diamond drill holes now in progress at Choquelimpie utilizing two drill rigs, we are rapidly advancing what we believe could be a transformative phase 3 drill program. The targeting of these holes reflects our growing confidence in the potential for substantial high-grade gold zones at depth and along strike below the existing open-pit resource."
Read the original news release →

More from Norsemont Mining Inc