Drill Results
Norsemont completes one drill hole at Choquelimpie

NOM · Price
Executive Summary
- Norsemont Mining has completed the initial diamond drill hole (MV25-DD01) and commenced two additional holes (MV25-DD02 and MV25-DD03) as part of its Phase 3 exploration program at the 100%-owned Choquelimpie project in northern Chile.
- The Phase 3 program is designed to evaluate downdip extensions of higher-grade gold mineralization (>1 g/t Au) hosted in hydrothermal breccia zones, with a total planned scope of up to 5,000 metres across 20 holes.
- Drilling is being conducted on a 24-hour schedule using two rigs, with results expected to update the 2025 resource model and potentially identify substantial high-grade gold zones at depth and along strike.
Key Details
- Drill Hole MV25-DD01:
- Completed to a depth of 300 metres.
- Targeted the Vizcacha higher-grade hydrothermal breccia.
- Oriented at an azimuth of 275 degrees and inclined at 70 degrees.
- Intersected the Vizcacha hydrothermal breccia as predicted, hosting moderate to strong pyrite mineralization (1 to 7%) as disseminations and veinlets.
- Intersected silica-pyrite and silica-enargite veinlets from 180 metres to the end of hole.
- Assays are pending.
- Drill Hole MV25-DD02:
- Collared from the same station as MV25-DD01.
- Targeting the Vizcacha hydrothermal breccia to depth.
- Oriented at an azimuth of 180 degrees, inclined at 80 degrees.
- Design depth is 225 metres.
- Currently intersecting the Vizcacha hydrothermal breccia with disseminated and veinlet-hosted sulphides.
- Drill Hole MV25-DD03:
- Collared and currently in progress.
- Targets the Choque zone at depth, below the area where gold grades were calculated in the 2025 resource model (Wilson, 2025).
- Will intersect a modelled hydrothermal breccia body.
- Program Scope & Logistics:
- Phase 3 program comprises up to 5,000 metres of diamond drilling.
- Planned for up to 20 holes averaging 250 metres in length.
- Drilling scheduled to continue through late December.
- Contractor: DV Drilling Ltd. (Coquimbo, Chile).
- Equipment: One Golden Bear 1400 and one CSK C1500 truck-mounted diamond drills.
- Operations: 24-hour schedule.
- Sample Preparation: Activation Geological Services SpA (Antofagasta, Chile).
- Laboratory Analysis: AGS geochemical laboratory (Coquimbo, Chile), ISO 17025 certified.
- Downhole Surveys: Conducted by DV Drilling using a gyroscope device.
- Supervision: Roman Flores, persona calificada with the Commission Minera Chile.
- Company Context:
- Choquelimpie is a past-producing gold and silver mine with significant exploration upside.
- Existing infrastructure includes roads, power, water, camp, and a 3,000-tonne-per-day mill.
- Current Resource Estimate: Indicated 1,731,000 gold ounces and 33,233,000 silver ounces; Inferred 446,000 gold ounces and 7,219,000 silver ounces.
Notable Quotes
- Marc Levy, CEO: "With the second and third diamond drill holes now in progress at Choquelimpie utilizing two drill rigs, we are rapidly advancing what we believe could be a transformative phase 3 drill program. The targeting of these holes reflects our growing confidence in the potential for substantial high-grade gold zones at depth and along strike below the existing open-pit resource."
More from Norsemont Mining Inc
Jun 05, 2026 · 09:00