Northwire Canada EditionTuesday, July 28, 2026
Northwire
LUG 81.27 +2.4% ETG 2.65 +1.1% ARIC 0.860 +2.4% ABC 0.020 +0.0% WEC 0.010 +0.0% NTB 0.020 +0.0% URC 3.83 −8.2% BEX 0.085 +6.2% SUM 1.32 +0.0% FMN 0.270 +10.2% PHNM 0.405 +12.5% HDRO 1.11 −6.7% PWM 0.620 −1.6% LIO 0.155 +10.7% NTH 0.160 +1.6% ELEF 0.120 −4.0% LUG 81.27 +2.4% ETG 2.65 +1.1% ARIC 0.860 +2.4% ABC 0.020 +0.0% WEC 0.010 +0.0% NTB 0.020 +0.0% URC 3.83 −8.2% BEX 0.085 +6.2% SUM 1.32 +0.0% FMN 0.270 +10.2% PHNM 0.405 +12.5% HDRO 1.11 −6.7% PWM 0.620 −1.6% LIO 0.155 +10.7% NTH 0.160 +1.6% ELEF 0.120 −4.0%
Drill Results

Nexcel hires Xcalibur for Burnt Hill geophysical survey

NEXX · Price

Executive Summary

  • Nexcel Metals Corp. has engaged Xcalibur MPH (Canada) Ltd. to conduct a high-resolution HeliTEM airborne electromagnetic (AEM) and magnetic survey at its Burnt Hill tungsten project in New Brunswick, Canada.
  • The survey is a critical preparatory step for the company's planned initial drill program in 2026, aimed at identifying deep conductive bodies and refining subsurface targets for tungsten mineralization.
  • Mobilization for the survey is anticipated for approximately April 1, 2026, with results to be integrated into the exploration workflow to define high-priority drill targets.

Key Details

  • Contractor: Xcalibur MPH (Canada) Ltd., a global leader in airborne geophysics.
  • Survey Technology: HeliTEM helicopter time-domain electromagnetic (TDEM) system plus magnetics.
  • Project Location: Burnt Hill tungsten project, New Brunswick, Canada.
  • Survey Start Date: Mobilization anticipated for approximately April 1, 2026.
  • Survey Objectives:
    • Target high-conductance base and precious metal mineralization.
    • Identify deep conductive bodies representing extensions of known tungsten mineralization.
    • Refine subsurface targets and support geological modelling.
    • Define high-priority drill targets for the 2026 drill campaign.
  • Survey Specifications:
    • Coverage: Approximately 1,480 line kilometres.
    • Transmitter Loop Size: 21-metre loop.
    • Primary Line Spacing: 100 metres.
    • Tie-line Spacing: 1,000 metres.
    • Line Orientation: Survey lines 000 degrees (north-south); Tie lines 090 degrees (east-west).
    • Navigation: Advanced GPS systems for precise coverage and data integrity.
    • Base of Operations: Fredericton, N.B., with logistical support including a fuel cache at the Burnt Hill site.
  • System Capabilities (HeliTEM):
    • Low-noise receiver for detecting subtle conductive responses at depth.
    • Square waveform transmitter for enhanced near-surface sensitivity.
    • Low base frequency configurations (7.5 to 15 hertz) for improved penetration depth.
    • High system power (~300,000 ampere-metres squared) to energize deep conductive bodies.
    • Multicomponent data acquisition (X, Y, and Z) for accurate conductor geometry modelling.
  • Quality Control Standards:
    • Strict reflight criteria for positioning, noise, or data gaps.
    • Noise thresholds: Z component < 0.5 nanotesla/second; X/Y components < 1.5 nanoteslas/second.
    • Terrain clearance control: ±15-metre tolerance.
    • Daily quality control and real-time data review.
  • Deliverables:
    • Time-domain electromagnetic data sets.
    • Magnetic data and derivatives.
    • GIS-compatible data sets and databases.
    • Quality control products and flight path data.
    • Final processed geophysical products suitable for interpretation and targeting.
  • Data Usage: To generate conductivity models and drill targets supporting Nexcel's phase 1 exploration program.
  • Qualified Person: Francis Newton, PGeo, consultant and qualified person under National Instrument 43-101 (not independent of the company).

Notable Quotes

  • "Engaging Xcalibur to complete a high-resolution HeliTEM airborne survey is a key milestone for Nexcel as we advance Burnt Hill into its next phase of exploration... This survey is specifically designed to identify deeper conductive targets that have not been previously tested, positioning us to unlock additional tungsten mineralization at depth." — Hugh Rogers, Chief Executive Officer of Nexcel.
Read the original news release →

More from Nexcel Metals Corp