Gold 3,881.60 −3.0% Silver 49.96 −3.9% Copper 6.19 −1.5% Oil 88.73 +2.5% Palladium 991.75 −5.2% SLI 1.98 −5.3% COCO 0.350 −4.1% BCU 0.060 +0.0% BGF 0.025 +0.0% TDG 0.710 +44.9% PRU 6.04 −4.1% NGEX 21.01 −5.2% TWO 0.340 −8.1% BIG 1.03 +8.4% VCG 1.06 −3.6% SCD 0.145 +0.0% GAL 0.370 −0.7% SAG 0.620 −6.1% VIZ 0.195 +0.0% SAGA 0.370 −7.5% ZEN 0.520 −5.5% Gold 3,881.60 −3.0% Silver 49.96 −3.9% Copper 6.19 −1.5% Oil 88.73 +2.5% Palladium 991.75 −5.2% SLI 1.98 −5.3% COCO 0.350 −4.1% BCU 0.060 +0.0% BGF 0.025 +0.0% TDG 0.710 +44.9% PRU 6.04 −4.1% NGEX 21.01 −5.2% TWO 0.340 −8.1% BIG 1.03 +8.4% VCG 1.06 −3.6% SCD 0.145 +0.0% GAL 0.370 −0.7% SAG 0.620 −6.1% VIZ 0.195 +0.0% SAGA 0.370 −7.5% ZEN 0.520 −5.5%
Production / Operations

G Mining's Tocantinzinho produces 171,871 oz Au in 2025

GMIN · Price

Executive Summary

  • G Mining Ventures Corp. reported preliminary production results for its Tocantinzinho gold mine in Brazil for the fourth quarter and full year ended December 31, 2025.
  • The mine successfully completed its first full year of commercial production, with Q4 gold production reaching 47,346 ounces and full-year production totaling 171,871 ounces.
  • Operational efficiency improved significantly in Q4, driven by the commissioning of additional mining equipment, resulting in an 18% increase in the average mining rate compared to Q3 2025.

Key Details

  • Q4 2025 Production: 47,346 ounces of gold produced.
  • Q4 2025 Sales: 47,457 ounces of gold sold.
  • Full Year 2025 Production: 171,871 ounces of gold produced.
  • Full Year 2025 Sales: 172,093 ounces of gold sold.
  • Q4 2025 Mill Processing: 1,077,000 tonnes of ore processed.
  • Q4 2025 Average Grade: 1.49 grams per tonne gold.
  • Q4 2025 Recovery Rate: 91.8%.
  • Full Year 2025 Mill Processing: 4,086,000 tonnes of ore processed.
  • Full Year 2025 Average Grade: 1.44 grams per tonne gold.
  • Full Year 2025 Average Recovery Rate: 90.6%.
  • Mining Rate Increase: The average mining rate increased to 64,700 tonnes per day in Q4 2025, an 18% rise compared to Q3 2025, following the commissioning of additional mining equipment.
  • Safety Performance: The company reported a lost-time injury frequency rate of 0.15 for the period, with only two lost-time incidents recorded.
  • Future Reporting: Financial and operational results for the fourth quarter and year-end 2025 will be released at the end of March, followed by a conference call with senior management.

Notable Quotes

  • "Tocantinzinho delivered a strong fourth quarter, successfully closing its first full year of commercial production," commented Louis-Pierre Gignac, president and chief executive officer. "Continued optimization initiatives are driving improvements in mine and plant productivity. These strong operational results were achieved alongside a solid safety performance, with only two lost-time incidents, resulting in a lost-time injury frequency rate of 0.15."
Read the original news release →

More from G Mining Ventures Corp.