Northwire Canada EditionSunday, August 9, 2026
Northwire
WHN 0.375 −2.6% LME 0.140 +3.7% AAUC 30.49 +5.3% GGM 0.040 +14.3% FDY 6.18 +3.2% MOG 0.640 +3.2% NEXM 3.20 +1.3% NCAU 0.330 +3.1% LUC 0.160 +0.0% BTR 0.140 +0.0% SMRV 0.200 −16.7% BIG 0.880 +3.5% URC 3.89 +0.0% ATY 0.250 −2.0% NRM 0.075 +7.1% WMS 0.040 +0.0% WHN 0.375 −2.6% LME 0.140 +3.7% AAUC 30.49 +5.3% GGM 0.040 +14.3% FDY 6.18 +3.2% MOG 0.640 +3.2% NEXM 3.20 +1.3% NCAU 0.330 +3.1% LUC 0.160 +0.0% BTR 0.140 +0.0% SMRV 0.200 −16.7% BIG 0.880 +3.5% URC 3.89 +0.0% ATY 0.250 −2.0% NRM 0.075 +7.1% WMS 0.040 +0.0%
Drill Results

Granada hires Ronacher McKenzie for structural analysis

GGM · Price

Executive Summary

  • Granada Gold Mine Inc. has contracted Ronacher McKenzie Geoscience Inc. (RMG) to conduct a comprehensive structural analysis of the Granada property, focusing on a 5.5-kilometer east-west mineralized structure.
  • The company highlights that 80% of this structure remains largely unexplored and cites the current gold price exceeding $4,000/oz as a catalyst for potential significant resource increases.
  • The structural interpretation aims to tie existing high-density drilling data from the southwestern part of the property to underexplored areas laterally and at depth, guiding future exploration success.

Key Details

  • Contractor: Ronacher McKenzie Geoscience Inc. (RMG) has been contracted to review company data and provide a new structural interpretation.
  • Scope of Analysis: The review covers 5.5 kilometers of east-west mineralized structure.
  • Exploration Status: 80% of the 5.5-kilometer structure is largely unexplored.
  • Data Sources: The study will utilize public and company geophysical, geological, and cultural data, including:
    • Drill database from over 150,000 meters of drilling (company data since 2007).
    • Historic drill data from the 1990s.
  • Strategic Goal: To develop geological knowledge of the entire property by tying existing knowledge from the high-density drilled area (southwestern part, near the past-producing mine) to underexplored claims laterally and to depth.
  • Current Drilling Activity:
    • Total program size: 120,000 meters.
    • Completed: 20,000 meters.
    • Status: Drills are currently paused to allow the technical team to evaluate and assimilate existing data while waiting for improved market conditions.
  • Mineral Resource Estimate (as of Aug 22, 2022):
    • Measured and Indicated: 543,000 ounces of gold (8.22 million tonnes at 2.05 g/t Au) at a cut-off of 0.55 g/t Au (pit-constrained).
    • Inferred: 456,000 ounces of gold (3.01 million tonnes at 4.71 g/t Au) at a cut-off of 2.5 g/t Au (underground).
  • Historical Production:
    • 1930s: Produced >50,000 ounces of gold at 10 g/t from two shafts.
    • 1990s: Extracted bulk sample Pit No. 1 (87,311 tonnes at 5.17 g/t Au) and Pit No. 2 (22,095 tonnes at 3.46 g/t Au).
  • Qualified Person: Matthew Halliday, PGeo, reviewed and approved the technical information.

Notable Quotes

  • "With 80 per cent of the 5.5-kilometre east-west mineralized structure largely unexplored, and with the price of gold now over $4,000 (U.S.) an ounce, which is significantly higher than when the resource estimates for the property were done several years ago, there is potential for a significant resource increase," stated chief executive officer Frank Basa, PEng, Ontario.
  • "We are very pleased that RMG has agreed to conduct the review. We have drilled intensively in the southwestern part of the Granada property, near the past-producing mine, to develop a gold resource estimate close to the surface suitable for an open pit. However, developing the structural analysis across the property and tying the existing knowledge from the high-density drilled area to the underexplored claims laterally and to depth will boost the geological knowledge of the entire property."
Read the original news release →

More from Granada Gold Mine Inc.