Northwire Canada EditionWednesday, July 29, 2026
Northwire
NAM 0.250 +0.0% CRD 0.065 +8.3% OLA 12.90 −3.7% CG 22.70 −2.5% EQX 12.89 −4.0% FM 37.51 −2.3% MNRG 0.080 −11.1% KFR 1.31 +0.8% AUMN 0.275 +0.0% GLB 0.250 +0.0% BHS 0.045 −10.0% EGR 0.025 +0.0% RIO 2.59 −4.1% GEN 0.070 +0.0% MAI 4.39 −2.0% RYR 0.175 +0.0% NAM 0.250 +0.0% CRD 0.065 +8.3% OLA 12.90 −3.7% CG 22.70 −2.5% EQX 12.89 −4.0% FM 37.51 −2.3% MNRG 0.080 −11.1% KFR 1.31 +0.8% AUMN 0.275 +0.0% GLB 0.250 +0.0% BHS 0.045 −10.0% EGR 0.025 +0.0% RIO 2.59 −4.1% GEN 0.070 +0.0% MAI 4.39 −2.0% RYR 0.175 +0.0%
Drill Results

Copaur to complete mapping, sampling at Troy Canyon

CPAU · Price

Executive Summary

  • Copaur Minerals Inc. has commenced a geologic mapping and rock geochemical field program at its 100%-owned Troy Canyon property in Nevada, engaging Apex Geoscience Ltd. to follow up on high-grade gold-silver assays from prior sampling.
  • The company announced the grant of one million stock options to directors, officers, employees, and consultants, exercisable at $0.15 per share for a five-year term.
  • Initial field observations indicate mineralized quartz vein and breccia localization along the sheared contact of the Troy pluton, supporting a permitting program scheduled for 2026 to enable diamond drilling in late 2026 or early 2027.

Key Details

  • Exploration Program:
    • Contractor: Apex Geoscience Ltd. (Edmonton, Alta.).
    • Location: Troy Canyon property, Grant range of eastern Nye County, Nevada, ~150 km east of Tonopah.
    • Property Details: 59 contiguous unpatented mineral claims covering 493 hectares.
    • Objective: Advance understanding of structural and geologic controls on mineralization preparatory to diamond drill hole planning.
    • Timeline: Field crews currently on site; permitting program planned for 2026; diamond core drill program targeted for late 2026 or early 2027.
  • Prior Sampling Highlights (Troy Canyon):
    • Locke West and East Mine Prospects: 42.7 g/t Au, 15 g/t Au, and 91 g/t Ag in outcrop of partially oxidized silica-sulphide breccia.
    • Locke East Mine Waste Dumps: 37.7 g/t Au in oxidized quartz vein material.
    • Western Troy Canyon Claims (Leadhill and Galena vein trends): 7.68 g/t Au (including 526 g/t Ag), plus 97.20 g/t Ag and 105 g/t Ag from mine dump material. This coincides with a 1.2 km north-south trending soil anomaly >10 ppb Au.
  • Geological Context:
    • High-grade gold mineralization occurs within massive quartz veins, vein breccias, and sheeted vein/stockwork zones exposed for over 300 metres.
    • Mineralization is located along the contact between the limestone hangingwall and quartz monzonite footwall of the Tertiary (23 million years) Troy pluton.
    • Initial observations show preferential localization along the intensely sheared contact of the Troy pluton and down plunge continuity possibly related to fold axes within overlying Cambrian limestone and shale units.
  • Stock Option Grant:
    • Quantity: 1,000,000 stock options.
    • Recipients: Directors, officers, employees, and consultants.
    • Exercise Price: $0.15 per common share.
    • Term: Five years from the date of grant.
    • Authority: Granted in accordance with the company's stock option plan.

Notable Quotes

  • "The Troy Canyon property encompasses the past-producing Locke mine, which operated in the late 1940s, processing ore on a small scale, with gold grades reportedly in excess of 10 grams per tonne. This field reconnaissance is designed to support a permitting program in 2026 that will allow the company to initiate a diamond core drill program in late 2026 or early 2027," commented Andrew Neale.
Read the original news release →

More from CopAur Minerals Inc.