Northwire Canada EditionSunday, July 12, 2026
Northwire
GLDN 0.055 +0.0% BRON 0.040 +0.0% BTO 5.43 −0.7% ESK 0.365 −2.7% AUMN 0.275 +0.0% GGX 0.040 +0.0% S 0.155 +29.2% NNX 0.035 +0.0% ABX 51.90 −0.6% TTS 2.40 −4.0% FCI 0.400 −9.1% GR 0.075 +0.0% AII 23.38 +12.4% TUNG 1.72 +1.8% LGO 1.01 −2.9% EMM 0.080 +0.0% GLDN 0.055 +0.0% BRON 0.040 +0.0% BTO 5.43 −0.7% ESK 0.365 −2.7% AUMN 0.275 +0.0% GGX 0.040 +0.0% S 0.155 +29.2% NNX 0.035 +0.0% ABX 51.90 −0.6% TTS 2.40 −4.0% FCI 0.400 −9.1% GR 0.075 +0.0% AII 23.38 +12.4% TUNG 1.72 +1.8% LGO 1.01 −2.9% EMM 0.080 +0.0%
Production / Operations

Blackrock Silver receives Tonopah air quality permit

BRC · Price

Executive Summary

  • Blackrock Silver Corp. has received the first of three key permits for its Tonopah West project in Nevada: a Class II air quality and surface disturbance permit from the Nevada Department of Environmental Protection (NDEP).
  • The permit allows for the disturbance of up to 150 acres at the project site, contingent on dust control measures, with a five-year term subject to extension and modification as the project advances toward exploration decline, test mining, and bulk sample extraction.
  • The company anticipates receiving all required permits by mid-2027, after which it will determine the timing to commence exploration decline, test mining, and bulk sample extraction programs.

Key Details

  • Permit Issued: Class II air quality and surface disturbance permit from the NDEP Bureau of Air Pollution Control.
  • Project Location: Tonopah West mineral project, located along the Walker Lane trend in Nye and Esmeralda counties, Nevada.
  • Authorized Disturbance: Up to 150 acres (60.7 hectares).
  • Permit Conditions: Requires appropriate dust control measures and a continuing program using best practical methods to prevent particulate matter from becoming airborne.
  • Permit Term: Five years, which can be extended and modified as the project moves toward permitting and construction of the proposed exploration decline, test mining, and bulk sample extraction programs.
  • Hydrogeological & Geochemical Programs: Data collection is ongoing to form the basis for the water pollution control permit.
  • Acid-Generating Potential Testing: Five humidity cells are currently in process to review the acid-generating potential of waste and mineralized lithologies encountered during tunnelling and construction of the exploration decline, including stockpiles for mineralized material from the bulk sample program.
  • Groundwater Dynamics: The hydrogeological program aims to understand potential flow and volumes to support management and disposal during the test mining and bulk sample phase.
  • Engineering Designs: Waste dump, stockpiles, and portal entry engineering designs are on schedule and will be used to calculate surface disturbance for the modification to the Nevada reclamation permit.
  • Permitting Timeline: The permitting process is on schedule, with all permits anticipated by mid-2027.
  • Next Steps: Once all permits are secured, the company will decide when to commence exploration decline, test mining, and bulk sample extraction programs.
  • Qualified Person: William Howald, Executive Chairman and AIPG certified professional geologist (No. 11041), has reviewed and approved the contents of the release under National Instrument 43-101.

Notable Quotes

  • "The permitting process is on schedule, with all permits anticipated by mid-2027. Once all permits are in hand, the company will decide when to commence with the exploration decline, test mining and bulk sample extraction programs at Tonopah West."
Read the original news release →

More from Blackrock Silver Corp.