Northwire Canada EditionMonday, October 19, 2026
Northwire
⌕
GOLD 4165.10 −0.4% SILVER 57.25 −0.1% COPPER 6.54 −0.5% OIL 97.72 −1.3% PALLADIUM 1123.50 +0.4% BHS 0.055 +10.0% BARU 0.045 +0.0% SAGE 0.110 +0.0% REC 0.050 +0.0% NICN 0.125 +8.7% TRX 1.48 −2.0% VLC 0.210 +0.0% TIGR 0.630 +1.6% TUO 1.42 −0.7% SVG 0.125 +0.0% VCU 1.05 +2.9% MACK 3.19 +2.9% COSA 0.380 −3.8% WGLD 0.130 +0.0% OSM 0.025 +0.0% TOM 0.145 +3.6% GOLD 4165.10 −0.4% SILVER 57.25 −0.1% COPPER 6.54 −0.5% OIL 97.72 −1.3% PALLADIUM 1123.50 +0.4% BHS 0.055 +10.0% BARU 0.045 +0.0% SAGE 0.110 +0.0% REC 0.050 +0.0% NICN 0.125 +8.7% TRX 1.48 −2.0% VLC 0.210 +0.0% TIGR 0.630 +1.6% TUO 1.42 −0.7% SVG 0.125 +0.0% VCU 1.05 +2.9% MACK 3.19 +2.9% COSA 0.380 −3.8% WGLD 0.130 +0.0% OSM 0.025 +0.0% TOM 0.145 +3.6%
Production / Operations

Blumetric signs $2.6M in watertech, engineering deal

BLM · Price

Executive Summary

  • Blumetric Environmental Inc. has secured $2.6 million in combined contracts with two multinational mining operators for projects in Ontario.
  • The contracts consist of one watertech supply agreement for a potable water treatment plant and one professional services agreement for environmental investigations.
  • CEO Scott MacFabe highlighted the company's ability to deploy both watertech and professional services to capture traction in the strengthening Ontario mining market.

Key Details

  • Total Contract Value: $2.6 million.
  • Contract 1 (Watertech):
    • Scope: Supply of a mission-ready water modular potable water treatment plant (PWTP).
    • Capacity: Up to 144,000 litres per day of drinking water.
    • Application: Expansion of a gold mining site.
    • Technical Specifications: Designed to remove total suspended solids, iron, manganese, and arsenic; operates at a wide range of ambient temperatures.
    • History: A smaller version of this plant was provided by Blumetric in 2022.
    • Manufacturing & Delivery: To be manufactured at the company's Carp, Ontario facility; expected to be delivered and commissioned within the next twelve months.
    • Scalability: Modular design allows for future potential expansion.
  • Contract 2 (Professional Services):
    • Scope: Geotechnical and environmental investigations.
    • Location: An inactive gold mine in Ontario.
    • Timeline: Work expected to be completed by the end of the calendar year.
  • Strategic Context: The wins represent a mix of new and repeat multinational clients, leveraging Blumetric's unique dual capability in watertech and professional services.

Notable Quotes

  • "We continue to see traction in the Ontario mining market as conditions strengthen... These contract wins are a mix of new and repeat multinational companies. Our mining market is unique because Blumetric can deploy both watertech and professional services offerings." — Scott MacFabe, Chair and CEO
Read the original news release →

More from Blumetric Environmental Inc