Original News Release
Geiger Energy plans winter drill program at Hook
Dr. Rebecca Hunter reports
GEIGER ENERGY ANNOUNCES WINTER DRILL PROGRAM TO TEST HOOK'S RADIOACTIVE ALTERATION SYSTEMS
Geiger Energy Corp. plans to drill on the Hook project this upcoming winter to test two clay alteration systems intersected in 2024, in the Athabasca basin of Northern Saskatchewan.
Key highlights
Winter 2026 drill program planned to test two major alteration systems at the Hook project;
Multiple radioactive systems identified that display extensive hydrothermal clay alteration, a key indicator of uranium-bearing systems;
Elevated radioactivity and uranium values within alteration systems highlight strong fertility across multiple zones kilometres from Geiger's Ackio discovery;
High discovery potential: alteration styles are analogous to those of major Athabasca basin deposits, such as the Millennium deposit, suggesting a fertile uranium system;
Year-round discovery momentum: Hook's winter campaign complements Geiger's summer exploration at Aberdeen, ensuring continuous advancement across two Tier 1 uranium districts;
Preliminary updates on the Aberdeen project's summer drilling results will be released shortly.
"The clay alteration and elevated radioactivity at Hook are highly encouraging and warrant immediate follow-up. With proven fertility through the Ackio discovery, the project clearly has potential for additional uranium mineralization.
"Geiger stands out with its large exploration land packages in two of Canada's most fertile uranium districts, the Athabasca and Thelon basins. The upcoming winter drill program at Hook builds on earlier success and complements the planned summer program at the Aberdeen project in the Thelon basin. This strategy enables Geiger to explore and deliver results year-round, creating continuous news flow and discovery potential across two premier uranium districts," stated Dr. Rebecca Hunter, president and chief executive officer of Geiger.
Hook project (Athabasca basin)
Two main areas that warrant current follow-up on the Hook project:
TT area (approximately 5.5 kilometres southwest of Ackio): drill intersections with clay alteration ranging from 30 to 145 metres in thickness in five drill holes, HK24-016, HK24-017, HK24-021, HK24-022 and HK24-023:
Extensive, strong clay alteration;
Prospective upper liesegang limonite banding present and quartz stockwork;
Radioactivity: up to 300 cps (counts per second); U (uranium) ppm (parts per million) values up to 98.4 ppm footwall to the alteration system in pegmatite;
Pathfinders: elevated boron in altered intervals (e.g. 183.9 ppm B (boron) over 126.3 m at 183.1 m in HK24-017).
TAB area (approximately six km northeast of Ackio): drill intersections of strong fracturing and hydrothermal alteration between 130 and 230 metres in thickness in two drill holes, HK24-009 and HK24-010:
Extensive fracturing, intermittent strong hematite and clay alteration;
Radioactivity: up to 890 cps over 0.2 m; U ppm values from 61.6 to 119.3 ppm in altered semipelite and pegmatite;
Pathfinders: highly elevated boron in altered intervals (for example, 489.0 ppm B over 35.3 m at 21.0 m in HK24-010).
The significant clay alteration systems share similarities with deposit areas in the Athabasca basin (for example, the Millennium deposit), which hosts a significant clay alteration halo outboard of the main deposit area. The presence of these two distinct alteration systems kilometres from the Ackio discovery shows the project area is fertile for more uranium mineralization discoveries.
The Hook project is a key asset for Geiger as it hosts significant uranium mineralization at Ackio, and the TT and TAB areas have now displayed additional prospective hydrothermal systems. The overall objective of the 2026 drill program is to further test these systems at TT and TAB and determine if the alteration is related to significant uranium mineralization. The company will share a more thorough plan for drill follow-up on Hook as the company finalizes its review of the 2024 exploration data in the coming months.
Aberdeen project (Thelon basin) update
The 2025 summer drill program concluded in mid-September after completing just over 5,300 metres in 20 drill holes. Drilling focused on four primary target areas: Loki, Bjorn, Tarzan and Lobster. The program intersected zones of exceptional clay alteration in all areas, and localized radioactivity, including the first occurrence of elevated radioactivity at the Thelon sandstone-basement unconformity contact at Loki (see press release dated Sept. 3, 2025). Geochemical analyses are currently under way. In the meantime, preliminary updates will be released this fall to provide further insight into the 2025 Aberdeen project results.
About Geiger
Geiger holds approximately 390,000 hectares of exploration ground in the Athabasca basin of Northern Saskatchewan, Canada, and an additional 95,519 hectares in Nunavut's Thelon basin. The company's exploration strategy is focused on discovering high-grade uranium deposits within these two prolific uranium districts.
Geiger's primary asset, the Aberdeen project in the Thelon basin, Nunavut, hosts the high-grade Tatiggaq and Qavvik uranium discoveries.
Tatiggaq is a basement-hosted prospect defined over a 300-metre strike length, comprising multiple steeply dipping, east-northeast-trending mineralized lenses situated between 80 and 180 metres depth. Notable drill intercepts include 2.25 per cent U3O8 (triuranium octoxide) over 11.1 metres, underscoring the high-grade potential of the system. The system is open for expansion over a 1.5 km strike length and a depth.
Qavvik is a similarly styled, basement-hosted prospect characterized by steeply dipping, mineralized east-northeast-trending lenses across a 100-by-100 metre area, extending from surface to approximately 400 metres depth. The system is open for expansion over a 500 metre area and at depth.
The Aberdeen project contains over 50 high-priority exploration targets, many of which exhibit strong alteration and anomalous uranium from limited historical drilling -- while several remain completely untested.
In the Athabasca basin, Geiger is advancing its Hook Project, which hosts the Ackio near-surface uranium prospect.
Ackio is a basement hosted prospect that extends for more than 375 metres along strike and 150 metres in width. It consists of at least nine distinct uranium pods with mineralization beginning at depth of 28 metres and continuing to approximately 300 metres. The system remains open at depth and along strike to the north, south and east, highlighting significant potential for expansion.
Significant massive clay alterations systems with elevated radioactivity are also present within the Hook project that show promising mineralization potential outboard of the Ackio discovery.
Qualified person statement
The technical information contained in this news release has been reviewed and approved by Dr. Rebecca Hunter, PGeo, president and chief executive officer of Geiger Energy, a qualified person, as defined in National Instrument 43-101 -- Standards of Disclosure for Mineral Projects.
We seek Safe Harbor.
View at source ↗