Northwire Canada EditionThursday, August 13, 2026
Northwire
BNZ 0.060 −7.7% NOU 2.03 +1.5% OOR 0.055 +10.0% MOON 6.97 −5.7% LOD 0.370 +0.0% CYG 0.150 +0.0% PHNM 0.395 +1.3% AWE 0.150 +30.4% FTZ 0.420 +0.0% PLY 0.055 +0.0% AZS 0.710 +0.0% RARE 9.05 +0.0% FOXT 0.160 −5.9% UCU 2.94 +0.7% BEM 0.090 +0.0% MANU 0.275 +25.0% BNZ 0.060 −7.7% NOU 2.03 +1.5% OOR 0.055 +10.0% MOON 6.97 −5.7% LOD 0.370 +0.0% CYG 0.150 +0.0% PHNM 0.395 +1.3% AWE 0.150 +30.4% FTZ 0.420 +0.0% PLY 0.055 +0.0% AZS 0.710 +0.0% RARE 9.05 +0.0% FOXT 0.160 −5.9% UCU 2.94 +0.7% BEM 0.090 +0.0% MANU 0.275 +25.0%
Drill Results

Ashley Gold Corp. Receives Channel Results, Confirms Broad Zone of Low Grade Gold from Representative Sampling at Howie Project, Ontario, Submits Core for Assay

ASHL · Price

Executive Summary

  • Ashley Gold Corp. announced assay results from a channel sampling program conducted on the Twilight Zone of its Howie Project in Ontario, validating the company's thesis of a bulk tonnage target.
  • The results show a weighted average grade of 0.624 g/t Au over 22.9 meters, with values exceeding peer cut-off grades for open-pit mining (e.g., Goliath Gold at 0.3 g/t Au).
  • The company also completed historic Esso core cutting ahead of schedule, with samples submitted for assay, and outlined plans for a full drill program to validate the early-stage model.

Key Details

  • Twilight Zone Channel Sampling Results:
    • Weighted average: 0.624 g/t Au over 22.9 meters.
    • All 23 channel cuts returned gold values.
    • Discontinuous channel cuts show alteration-associated mineralization (silicification, carbonatization, chloritization, sericitization, fuchsite) with disseminated pyrite and arsenopyrite.
    • Specific high-grade intercepts include:
      • Sample 346550: 1.77 g/t Au over 1.2 m
      • Sample 340262: 1.67 g/t Au over 1.0 m
      • Sample 340261: 1.60 g/t Au over 0.8 m
      • Sample 340259: 1.32 g/t Au over 1.0 m
      • Sample 346541: 1.18 g/t Au over 1.2 m
    • Grab sample results included:
      • Sample 346536: 1.23 g/t Au
      • Sample 340270: 1.14 g/t Au
  • Historic Core Cutting:
    • Core cutting in Kenora, ON, completed ahead of schedule as of September 18, 2025.
    • Samples submitted to Actlabs in Dryden, ON, for assay.
    • Visual inspection of rediscovered historic Esso core shows strong correlation with recent surface channel sampling.
  • Peer Comparison:
    • Results are inline or exceed advanced peers in the belt, such as the Goliath Gold complex open-pit cut-off grade of 0.3 g/t Au and the Rainy River open-pit cut-off grade of 0.3 g/t Au for low-grade mineralization.
  • Future Plans:
    • Management intends to lead into a "full fledged, modern drill program" to further validate the early-stage model.
  • Project History Highlights:
    • May 1987: Esso Minerals conducted a two-year program; historic logs detail wide zones of mineralization.
    • November 2022: Initial surface prospecting at Main Katisha Shear Zone yielded up to 52.80 g/t Au.
    • October 2024: Completed induced polarization (IP) survey over 2 km of lines to define 2025 drill targets.
    • May 2025: Mechanical stripping and channel sampling at Katisha Zone yielded up to 20.2 g/t Au.

Notable Quotes

  • Noah Komavli, President: “With our thesis of a bulk tonnage target receiving some validation from these channel sample results, the road accessible Howie Project is positioned as a cornerstone of our portfolio. These early results are inline or exceed advanced peers in the belt... These results are very encouraging and show that we are on the right track.”
Read the original news release →

More from Ashley Gold Corp.