Northwire Canada EditionSaturday, July 11, 2026
Northwire
GLDN 0.055 +0.0% BRON 0.040 +0.0% BTO 5.43 −0.7% ESK 0.365 −2.7% AUMN 0.275 +0.0% GGX 0.040 +0.0% S 0.155 +29.2% NNX 0.035 +0.0% ABX 51.90 −0.6% TTS 2.40 −4.0% FCI 0.400 −9.1% GR 0.075 +0.0% AII 23.38 +12.4% TUNG 1.72 +1.8% LGO 1.01 −2.9% EMM 0.080 +0.0% GLDN 0.055 +0.0% BRON 0.040 +0.0% BTO 5.43 −0.7% ESK 0.365 −2.7% AUMN 0.275 +0.0% GGX 0.040 +0.0% S 0.155 +29.2% NNX 0.035 +0.0% ABX 51.90 −0.6% TTS 2.40 −4.0% FCI 0.400 −9.1% GR 0.075 +0.0% AII 23.38 +12.4% TUNG 1.72 +1.8% LGO 1.01 −2.9% EMM 0.080 +0.0%
Drill Results Routine +

ICG Silver & Gold Advances Permitting for Phase 1 Exploration at The Tuscarora District

ICG · Price

Executive Summary

  • ICG Silver & Gold Ltd. has advanced permitting activities for its planned Phase 1 Drill Program at the Tuscarora District in Nevada.
  • The Company engaged WestLand Engineering & Environmental Services to manage permitting strategy, project management, and agency coordination for the upcoming exploration program.
  • The Phase 1 Drill Program is expected to comprise 3,000 meters of drilling targeting multiple shallow, oxidized silver-gold prospects, with the primary objective of advancing the district-scale geological model.

Key Details

  • Permitting Partner: Engaged WestLand Engineering & Environmental Services (Reno, NV) to provide permitting strategy, project management, agency coordination, and additional permitting support.
  • Drilling Scope: Planned Phase 1 Drill Program will include 3,000 meters of drilling.
  • Target Focus: Multiple shallow, oxidized silver-gold targets across the Tuscarora District.
  • Priority Target Areas: East Pediment, Grand Prize, Kings Vein, Modoc, and Battle Mountain.
  • Target Identification Methodology: Areas identified through the Company's ongoing integration of historical drilling, surface sampling, geological mapping, geophysical data, and structural interpretation.
  • Program Objectives: Test priority targets that have not been fully evaluated by modern exploration methods and advance the Company's district-scale geological model for the Tuscarora District.
  • Operational Readiness: Broader preparation activities include drill planning, access evaluation, contractor coordination, water logistics, and site preparation planning.
  • Land Package & Historical Exploration: 100% control of approximately 10,000 acres on the Carlin Trend; prior work includes extensive rock chip sampling, thousands of meters of reverse circulation and core drilling, and tens of kilometers of CSAMT geophysics.
  • Qualified Person: Steven L. McMillin, P.G., of Rangefront Mining Services reviewed and approved all scientific and technical information in compliance with National Instrument 43-101.

Notable Quotes

  • "Advancing the permitting process is a critical step as we prepare for our Phase 1 Drill Program at the Tuscarora District," stated Korbon McCall, VP of Exploration. "Our objective is to move the project forward in a practical, responsible, and well-coordinated manner. Bringing in experienced Nevada permitting support strengthens our ability to execute the upcoming program efficiently while maintaining alignment with regulatory requirements and best practices."
Read the original news release →

More from ICG Silver & Gold Ltd.