Northwire Canada EditionSunday, November 29, 2026
Northwire
⌕
Gold 3,668.50 +3.8% Silver 43.70 +9.1% Copper 5.52 +3.4% Oil 83.33 −0.4% Palladium 879.00 +5.5% MUN 0.285 +11.8% RNCH 0.030 +0.0% GSKR 2.30 +8.0% ADY 0.370 +5.7% TSK 0.640 +1.6% BAY 0.055 +22.2% CGNT 0.670 −2.9% INFI 0.190 +0.0% GSS 0.045 +50.0% HAY 0.040 +0.0% WRLG 0.430 +1.2% MPVD 0.015 + GGO 0.980 +5.4% NAU 0.530 +6.0% COCO 0.260 +8.3% TBLL 0.045 +12.5% Gold 3,668.50 +3.8% Silver 43.70 +9.1% Copper 5.52 +3.4% Oil 83.33 −0.4% Palladium 879.00 +5.5% MUN 0.285 +11.8% RNCH 0.030 +0.0% GSKR 2.30 +8.0% ADY 0.370 +5.7% TSK 0.640 +1.6% BAY 0.055 +22.2% CGNT 0.670 −2.9% INFI 0.190 +0.0% GSS 0.045 +50.0% HAY 0.040 +0.0% WRLG 0.430 +1.2% MPVD 0.015 + GGO 0.980 +5.4% NAU 0.530 +6.0% COCO 0.260 +8.3% TBLL 0.045 +12.5%
Other Routine +

Maple Gold Initiates Preliminary Economic Assessment for the Douay/Joutel Gold Project

Maple retracts its internal Douay/Joutel study and launches a preliminary economic assessment for the project.

Executive Summary

Maple Gold Mines Ltd. announced the initiation of a Preliminary Economic Assessment (PEA) for its 100%-owned Douay/Joutel Gold Project in Quebec. The study targets completion in the first half of 2027 and will evaluate an integrated development scenario combining the Douay open-pit and underground deposits with the higher-grade Joutel underground deposit.

The PEA incorporates approximately 57,000 meters of drilling data not included in the April 2026 Mineral Resource Estimate (MRE), including fall 2026 programs. Consultant appointments include DRA Global as the lead economic modeler, Norda Stelo for environmental and waste management, SGS Canada for metallurgy, and SLR Consulting for resource estimation.

Concurrently, the company issued a formal retraction of all prior public references to an "internal scoping study." The retraction clarifies that the internal work was for planning purposes only, did not meet NI 43-101 technical report requirements, and investors should not rely on any associated parameters or estimates. Qualified Person Ian Cunningham-Dunlop, P.Eng., reviewed and approved both releases.

Material Impact

Maple Gold Mines Ltd. (MGM) has released a preliminary economic assessment (PEA), a development that follows the substantial resource growth announced in April 2026 and the completion of extensive drilling programs. Management had previously targeted a PEA for the first half of 2027 in prior communications, making this announcement a procedural milestone rather than a surprise catalyst.

The assessment integrates the Douay and Joutel deposits into a single economic model, providing a more comprehensive view of the district-scale potential, which is standard for advanced exploration projects. Additionally, the company retracted its internal scoping study as a necessary compliance correction. This action removes any speculative internal metrics that may have been loosely cited previously and ensures all future disclosures meet regulatory standards. The update confirms management's disciplined approach to technical de-risking, maintains the H1 2027 PEA timeline, and strengthens regulatory standing.

MGM · Price
Company Overview

Maple Gold Mines Ltd. is an exploration-stage gold company focused on the 100%-owned Douay/Joutel Gold Project in Quebec's Abitibi Greenstone Belt. The flagship project spans approximately 481 square kilometers and includes the Douay open-pit/underground deposits and the high-grade Joutel underground complex. Historical Joutel production totaled 1.1 million ounces of gold at 6.5 g/t Au between 1974 and 1993.

The company is advancing toward a Preliminary Economic Assessment (PEA) in H1 2027 to evaluate economic potential, mine life, capital intensity, and operating costs. The April 2026 MRE established 905,000 ounces of Indicated gold and 4,297,000 ounces of Inferred gold. No mineral reserves have been estimated, and the company generates no revenue.

Read the original news release →

More from Maple Gold Mines Ltd.