Drill Results
GoldQuest Extends High-Grade Polymetallic VMS Mineralization at Cachimbo Target, Dominican Republic
Dominican Republic Gold-Copper Developer

Executive Summary
- GoldQuest Mining Corp reported new assay results from drill hole TIR-26-62 at the Cachimbo target in the Dominican Republic.
- The main intercept returned 12.15 metres grading 8.60 g/t Au, 128.2 g/t Ag, and significant copper, zinc, and lead values.
- Results confirm continuity of a high-grade polymetallic Volcanogenic Massive Sulphide (VMS) mineralized level at Cachimbo.
- The company notes pending assays from a stringer zone below the high-grade VMS level remain to be reviewed.
- This follows the March 2026 discovery announcement and represents an extension of the mineralized horizon along trend toward the northwest within the broader 7.5 km anomalous corridor.
Material Impact
- The news is technically positive, confirming exploration success at the Cachimbo greenfield target.
- However, this occurs in the immediate aftermath of a significant regulatory setback at the flagship Romero project (May 5, 2026), where activities were temporarily halted following public concerns raised by the President of the Dominican Republic.
- The market reaction to the May 5 halt was severe, with the stock dropping from ~$1.61 to $0.41 within days.
- While Cachimbo results are encouraging for long-term district potential, they do not mitigate the immediate operational risk at Romero, which is the primary value driver (PFS completed, BFS underway).
- The positive drilling news is incremental and expected given the announced 2026 program; it does not constitute a material change to the company's fundamental risk profile regarding the Romero project.
GQC · Price
Company Overview
- GoldQuest Mining Corp is focused on developing the Romero gold-copper underground "starter mine" in the Dominican Republic's Tireo Belt.
- The company also explores greenfield targets like Cachimbo within the 50-km Tireo Belt district.
- Romero Project Status: Development stage with a Preliminary Feasibility Study (PFS) completed showing 28% IRR and US$202M NPV. Bankable Feasibility Study (BFS) is underway, targeting Q4 2026 completion.
- Cachimbo Target: Exploration target identified in March 2026 with high-grade VMS mineralization; currently in the drilling delineation phase.
- Management: Led by CEO Luis Santana and Chair Frank Balint (P.Geo.), with a focus on local stakeholder engagement and international standards for permitting.
More from GoldQuest Mining Corp.
May 28, 2026 · 17:03