A2GOLD COMPLETES INITIAL TARGET PENTE RC DRILLING AT EASTSIDE GOLD-SILVER PROJECT
A2 identifies structural targets at the Eastside deposit, with assay results currently pending.

A2 Gold Corp. (AUAU) has completed an initial Reverse Circulation (RC) drill program at the Target Pente area of its Eastside Gold-Silver Project in Nevada. The program consisted of five holes totaling 1,936 meters, designed to test three priority structural corridors identified through surface mapping.
All five holes intersected strong alteration zones, and two holes intersected significant intervals of quartz-cemented hydrothermal breccia. The program was concluded early due to challenging ground conditions, but geological observations are considered encouraging for future exploration evaluation.
Assay results are pending due to laboratory backlogs, with complete results expected to take several months. The company controls approximately 230 km² of mineral tenure across Eastside and Taylor projects, with an inferred mineral resource of 1.4 million ounces of gold and 8.8 million ounces of silver at Eastside. Kinross Gold Corporation owns approximately 9.9% of the company's shares.
A2 Gold Corp. (AUAU) has completed five drill holes at Target Pente, marking a standard operational milestone within its 2026 exploration plan. The completion confirms the execution of the announced program, though it does not yet provide assay data to validate the geological model or alter the resource estimate.
The reported geological observations, which include strong alteration and hydrothermal breccia, are consistent with the target selection criteria. Without assay results, the material impact on valuation remains neutral. The program concluded early due to difficult ground conditions, a minor operational hurdle that does not indicate a fundamental flaw in the target but may delay the timeline for receiving assay results.
The lack of immediate assay data means the market cannot price in any potential grade or thickness upgrades. The news is incremental and aligns with previously communicated exploration objectives. A2 Gold’s strategic focus on high-grade epithermal veins at Eastside, alongside the recently acquired Taylor project, remains the core investment thesis. This update neither enhances nor detracts from that thesis until assay results are released.
A2 Gold Corp. (AUAU) is a Nevada-focused precious metals explorer and developer targeting district-scale gold and silver deposits. Its flagship asset is the Eastside Gold-Silver Project in Esmeralda County, Nevada, which hosts an inferred resource of 1.4 million ounces of gold and 8.8 million ounces of silver. The deposit is a structurally controlled epithermal system featuring oxide and sulphide gold mineralization that is amenable to heap leaching.
The company also operates the Taylor Silver-Gold Project in White Pine County, Nevada. Recently acquired, the 117 km² property hosts a historical silver resource of approximately 11 million ounces and holds significant gold and antimony potential. The project is fully permitted and drill-ready. A2 Gold’s strategy centers on high-grade epithermal feeder veins and district-scale exploration, aiming to expand resources at Eastside while advancing Taylor as a multi-metal platform.