Drill Results
Bedford completes phase 3 exploration at Sheppard Lake

BFM · Price
Executive Summary
- Bedford Metals completed its Phase 3 exploration program at the Sheppard Lake uranium project in December 2025.
- The fully financed drill program will resume in spring 2026 targeting TZ‑2, TZ‑1 and Warr Lake, including a high‑resolution magnetometer survey of the newly identified Silica Cap zone.
- Field work generated 3,644 radiometric readings, 18 grab samples, and two drill holes (totaling 298.5 m) with 74 core samples; 92 samples were sent for U₃O₈ and multielement analysis.
Key Details
- Program Scope: Phase 3 field program concluded end‑December 2025; included three radiometric surveys, prospecting, and grab sampling.
- Radiometric Survey: Conducted on high‑resolution grids (10 m CPS readings every 10 m along 50‑m lines, 25 m line spacing); 3,644 readings delineated anomalous zones at TZ‑2 west and TZ‑1.
- Grab Sampling: 18 grab samples collected from TZ‑1, west of TZ‑2, and Warr Lake; maximum CPS of 10,609 recorded at the Silica Cap zone.
- Drilling Activity: Only 298.5 m drilled due to extreme cold and equipment issues:
- Hole SHP‑25‑01 abandoned at 32 m (rod binding).
- Hole SHP‑25‑02 reached 266.5 m on a steeper dip, testing south of TZ‑2.
- Core Sampling: 74 core samples obtained from the two holes; maximum CPS of 152 recorded.
- Laboratory Analysis: Total of 92 samples (grab + core) submitted to SRC Geoanalytical Laboratory for multielement, U₃O₈ and boron assays.
- Future Work (Spring 2026): Resumption of drilling on TZ‑2 showing, plus exploration of TZ‑1 and Warr Lake; high‑resolution walking magnetometer survey and backpack drilling planned for the Silica Cap zone.
- Environmental & Community Commitment: Emphasis on environmentally responsible practices and collaboration with local Indigenous communities.
Notable Quotes
(No direct quotes provided in the release.)
More from Bedford Metals Corp.
Jun 01, 2026 · 19:10