Northwire Canada EditionTuesday, July 28, 2026
Northwire
LMR 0.075 +0.0% XTM 0.065 +0.0% CRG 0.220 +0.0% DEC 0.070 +0.0% EAU 0.100 +0.0% GEMG 1.72 +0.0% CGNT 0.770 +0.0% ALGR 0.455 +0.0% TGOL 0.100 +0.0% CAMB 0.830 +0.0% SAGA 0.415 +0.0% LEGY 0.900 +0.0% ECU 1.70 +0.0% HCH 1.49 +0.0% SCMI 1.88 +0.0% BTR 0.165 +0.0% LMR 0.075 +0.0% XTM 0.065 +0.0% CRG 0.220 +0.0% DEC 0.070 +0.0% EAU 0.100 +0.0% GEMG 1.72 +0.0% CGNT 0.770 +0.0% ALGR 0.455 +0.0% TGOL 0.100 +0.0% CAMB 0.830 +0.0% SAGA 0.415 +0.0% LEGY 0.900 +0.0% ECU 1.70 +0.0% HCH 1.49 +0.0% SCMI 1.88 +0.0% BTR 0.165 +0.0%
Production / Operations

Myriad Uranium Completes Large-Scale Radiometric and Magnetic Geophysical Survey Across Its Copper Mountain Project

M · Price

Executive Summary

  • Myriad Uranium Corp. completed a large‑scale helicopter‑borne radiometric and magnetic survey over the entire 191.8 km² Copper Mountain Uranium Project.
  • The survey, performed by Precision Geosurveys, collected 2,114 line‑kilometres of data at 100 m line spacing, providing high‑resolution magnetic and gamma‑ray measurements to refine exploration targets.
  • Preliminary unprocessed images are already available; final processed results are expected in January 2026 and will guide the next phase of drilling planned for 2026.

Key Details

  • Survey Scope: 191.8 km² area, 2,114 line‑kilometres flown at 30 m altitude, north–south orientation, 100 m line spacing with 1,000 m tie lines.
  • Equipment Used:
  • Magnetic sensor – Scintrex CS‑3 (or Geometrics equivalent) cesium vapor magnetometer; sensitivity <0.01 nT, 20 Hz sampling (1–2 m spacing).
  • Radiometric sensor – Medusa gamma spectrometer system with 21 L NaI(Tl) crystals, 512 channels, 1 Hz sampling.
  • Data Accuracy: Flight line accuracy ±8 m; elevation control via laser altimeter; positioning via WAAS‑enabled GPS.
  • Processing Timeline: Preliminary uncorrected magnetic and radiometric images received; full processing and data products expected January 2026.
  • Historical Context: References 1982 Bendix study estimating ~655 Mlb U in the broader district and ~245 Mlb U in the “Contral Area” (≥70 % owned by Myriad). These are historical, non‑NI 43‑101 estimates.
  • Future Plans: Processed survey results will be used to prioritize targets for a new drilling program slated for early 2026.
  • Qualified Person: George van der Walt, MSc., Pr.Sci.Nat., FGSSA – consulting geologist and NI 43‑101 Qualified Person reviewed the technical information.

Notable Quotes

“We are very pleased to have completed this helicopter‑borne radiometric survey across the entire Copper Mountain project ahead of winter… The knowledge gained will substantially strengthen our exploration and development programs.” – Thomas Lamb, President & CEO

Read the original news release →

More from Myriad Uranium