Northwire Canada EditionSaturday, October 31, 2026
Northwire
⌕
Gold 3,898.90 −3.3% Silver 49.28 −5.9% Copper 6.48 −1.8% Oil 104.12 +2.1% Palladium 987.70 −1.7% HCH 1.25 −3.9% CRD 0.040 −20.0% ENEV 0.005 +0.0% MOON 5.23 −7.9% ORE 2.56 −4.8% ASE 0.620 −14.5% LKY 0.005 + SOI 0.165 −5.7% ECR 0.190 −5.0% OZ 0.240 −9.4% ELEC 0.110 +4.8% WHY 0.260 −3.7% PHD 0.030 −33.3% OMI 0.220 −10.2% EML 0.105 +0.0% TECT 1.37 −2.8% Gold 3,898.90 −3.3% Silver 49.28 −5.9% Copper 6.48 −1.8% Oil 104.12 +2.1% Palladium 987.70 −1.7% HCH 1.25 −3.9% CRD 0.040 −20.0% ENEV 0.005 +0.0% MOON 5.23 −7.9% ORE 2.56 −4.8% ASE 0.620 −14.5% LKY 0.005 + SOI 0.165 −5.7% ECR 0.190 −5.0% OZ 0.240 −9.4% ELEC 0.110 +4.8% WHY 0.260 −3.7% PHD 0.030 −33.3% OMI 0.220 −10.2% EML 0.105 +0.0% TECT 1.37 −2.8%
M&A / Property

Maverick Gold and Silver Triples the Size of the Jericho Property, Nevada

Maverick Gold Expands Nevada Footprint Amidst Exploration Push

Executive Summary
  • Property Expansion: On April 30, 2026, Maverick Gold and Silver Corp. announced a significant expansion of its Jericho Property in Lincoln County, Nevada. The company acquired 62 additional claims via staking, increasing the property size by approximately 370%.
  • Current Footprint: The expanded property now comprises 85 mineral claims covering roughly 1,683 acres (6.8 square kilometres).
  • Sampling Results: Recent grab sampling at the historic Miramonte working returned surface results of 2.50 g/t gold and 188.0 g/t silver. Historical high grades noted are up to 52.8 g/t Au and 1,255 g/t Ag.
  • Strategic Context: This follows a previous announcement on April 23 regarding the commencement of work programs (sampling/mapping) at Jericho and an earlier update on April 16 regarding fieldwork at the Gator Project.
  • Management Commentary: VP Exploration Ian Foreman stated that expanding the footprint is key to growth strategy, allowing them to fully explore the mineralizing system before advancing to a drill program.
Material Impact
  • Incremental Progress: The news represents an incremental step in the exploration lifecycle rather than a fundamental valuation shift. Securing land via staking is a standard operational activity for junior explorers and does not inherently prove economic viability without drilling.
  • Grade Verification Needed: While grab samples of 2.50 g/t Au are promising, surface sampling can be biased by weathering or high-grade pockets that do not represent bulk tonnage. The historical highs (52.8 g/t) suggest potential but require drill confirmation to be material for valuation models.
  • Market Reaction Context: The stock price peaked at $0.13 on April 27, prior to this announcement, and closed the month at $0.10. This suggests the market may have already priced in some exploration optimism or that the news is viewed as expected follow-up to the April 23 work program initiation.
  • Risk of Dilution: No financing details are provided in this release. If capital is needed for the expanded footprint, future dilution remains a risk not addressed here.
MAV · Price
Company Overview
  • Flagship Project: Jericho Property (Nevada). A low sulphidation epithermal deposit featuring structurally controlled quartz veins, breccias, and stockwork zones.
  • Secondary Project: Gator Epithermal Gold-Silver Project (Nevada). Targets include Gator South and GSX within a 7 km structural corridor.
  • Location: Jericho is in Lincoln County, eastern Nevada (40 km NE of Pioche), within the Nevada Eastern Calderas region. Gator is in Pershing/Lander Counties (~56 km SW of Battle Mountain).
  • Development Stage: Exploration/Pre-feasibility. Currently conducting surface sampling and mapping; drill program not yet commenced based on available news.
Read the original news release →

More from Maverick Gold and Silver Corporation