Northwire Canada EditionTuesday, September 22, 2026
Northwire
GOLD 4368.80 −0.3% SILVER 66.19 −0.3% COPPER 6.86 +1.4% OIL 90.51 −2.0% PALLADIUM 1323.00 +0.5% REE 0.035 +0.0% AZT 0.370 +0.0% KLDC 0.380 +0.0% SML 0.040 +0.0% SRC 1.74 +0.0% MGG 0.315 +0.0% HMR 0.600 +0.0% VCG 1.40 +0.0% KNG 1.11 +0.0% MINE 0.130 +0.0% AEF 0.160 +0.0% MTT 0.270 +0.0% CTGO 26.66 +0.0% RIO 3.60 +0.0% BEA 0.055 +0.0% LCE 0.230 +0.0% GOLD 4368.80 −0.3% SILVER 66.19 −0.3% COPPER 6.86 +1.4% OIL 90.51 −2.0% PALLADIUM 1323.00 +0.5% REE 0.035 +0.0% AZT 0.370 +0.0% KLDC 0.380 +0.0% SML 0.040 +0.0% SRC 1.74 +0.0% MGG 0.315 +0.0% HMR 0.600 +0.0% VCG 1.40 +0.0% KNG 1.11 +0.0% MINE 0.130 +0.0% AEF 0.160 +0.0% MTT 0.270 +0.0% CTGO 26.66 +0.0% RIO 3.60 +0.0% BEA 0.055 +0.0% LCE 0.230 +0.0%

← Back to our analysis

Original News Release Routine +

Thunder Gold Reports 121.5 metres Averaging 0.376 g/t Au in New Target Located 200 metres East of Current Resource Pit Optimization Limit

Thunder Bay, Ontario--(Newsfile Corp. - September 17, 2026) - Thunder Gold Corp. (TSXV: TGOL) (FSE: Z25) (OTCQB: TGOLF) ("Thunder Gold" or the "Company") is pleased to announce exploration diamond drill results from the Bench Target, at the Company's flagship Tower Mountain Property, 40 kilometres west of Thunder Bay, Ontario. Highlights: TM26-205 identified significant new mineralization east of the current resource pit limit; All seven (7) holes intersected mineralization above the current resource cut-off grade in areas previously estimated to be waste; Results demonstrate good to excellent correlation to the current resource model; TM26-207 and TM26-207A provide twinned hole results indicating minimal variation (less than 5%) over the first 40 metres of both holes and; TM26-213 intersected 287.7 metres averaging 0.223 g/t Au, extending the mineralized trend to the southeast. Holes TM26-201, 205, 206, 207 and 208 were drilled perpendicular to the interpreted Tower Mountain Intrusive Complex ("TMIC") contact probing the eastern extent of the variably brecciated and altered volcanic +/- intrusive horizon hosting the known gold mineralization of the Bench Target. This area was exclusively classified as waste in the 2026 Mineral Resource Estimate ("MRE") due to lack of drill coverage. Holes TM26-209 and TM26-213 were drilled sub-parallel to the interpreted TMIC contact. Wes Hanson, President and CEO states, "With the exception of TM26-213, these holes all tested the 150 million tonnes of waste rock within the 2026 MRE pit shell that were not estimated due to insufficient drill coverage. All intervals above the MRE cut-off grade (0.19 g/t Au) offer potential to reduce the waste:ore strip ratio which is already amongst the lowest of our Canadian peer group. The targeted area represents 66% of the total waste included in the 2026 MRE. It is therefore significant that all seven holes intersected intervals above the MRE cut-off grade as these already lie within the current MRE optimized pit shell." "The most significant mineralization occurs in TM26-205 (121.5 metres averaging 0.376 g/t Au). This mineralization lies 200 metres east of the 2026 MRE resource pit limit, approximately 400 metres from surface. The target is open in all directions. Follow up drilling targeting the up-dip continuity is planned." "TM26-213 is also significant. Drilled parallel to the eastern TMIC contact, this hole was consistently mineralized from the collar to the end of the hole through an area of sparse drill coverage." "We continue to operate two (2) drills and warrant exercises have fully funded our remaining drilling. Year-to-date, we have completed 6,600 metres of exploration drilling and 3,795 metres of resource definition drilling. All-in exploration costs for the year are approximately C$250 per metre. We plan to complete an additional 7,500 metres of resource definition drilling prior to year-end and estimate approximately 60 to 70% of that total will be included in the planned MRE update scheduled for year-end." Table 1.0 provides the location and orientation of the reported holes. Figure 1.0 is a plan view showing the location of the drill holes reported in this news release. Table 1.0 - Bench Target - Resource Expansion Drilling Location Bearing and Dip Hole ID Easting Northing Elevation Bearing Dip TD TM26-201 300975.0 5377254.0 521.0 65.0 -45.0 600.0 TM26-205 300901.0 5377465.0 494.0 71.0 -44.5 603.0 TM26-206 301034.0 5377593.0 494.0 40.0 -44.6 399.0 TM26-207 300820.0 5377578.0 463.0 45.0 -44.0 48.0 TM26-207A 300820.3 5377578.3 463.0 45.0 -44.0 600.0 TM26-208 301351.0 5377825.0 476.0 247.0 -44.3 501.0 TM26-209 301108.0 5377711.0 512.0 310.0 -54.7 600.0 TM26-213 300975.0 5377253.5 521.0 135.0 -44.8 593.0   Figure 1.0 Bench Target Resource Expansion Drill Holes - September 2026 To view an enhanced version of this graphic, please visit: https://images.newsfilecorp.com/files/5364/314602_33f1fd3224bb0bf8_001full.jpg Table 2.0 summarizes the significant results, by primary lithology. Table 2.0 - Bench Target Resource Expansion Drilling Significant Results Hole ID Lithology From To Length Grade True Width (m) (m) (m) (Au g/t) (m) TM26-201 Volcanics 29.0 32.0 3.0 0.556 1.6 and 55.6 86.0 30.4 0.345 16.2 and 217.5 237.0 19.5 0.228 10.4 Intrusives 367.5 369.0 1.5 5.745 Unknown and 383.5 415.0 31.5 0.250 Unknown and 576.5 585.5 9.0 0.260 Unknown TM26-205 Volcanics 4.9 163.5 158.6 0.545 82.0 includes 6.0 60.0 54.0 1.088 27.9 and 78.0 82.5 4.5 1.433 2.3 and 94.5 97.5 3.0 0.953 1.6 Intrusives 184.5 187.0 2.5 0.489 Unknown and 295.5 301.5 6.0 0.204 Unknown and 322.5 336.0 13.5 0.327 Unknown and 357.0 364.5 7.5 0.632 Unknown and 373.5 381.0 7.5 0.841 Unknown and 465.0 586.5 121.5 0.376 Unknown includes 514.5 532.5 18.0 0.420 Unknown and 555.0 568.5 13.5 1.283 Unknown TM26-206 Intrusives 27.0 34.5 7.5 0.191 Unknown and 172.5 174.0 1.5 1.040 Unknown and 258.0 264.0 6.0 0.209 Unknown and 342.0 347.5 5.5 0.197 Unknown TM26-207 Volcanics 4.5 48.0 43.5 0.341 28.4 TM26-207A Volcanics 2.8 85.3 82.5 0.332 53.8 includes 2.8 45.0 42.2 0.320 27.5 and 43.5 45.0 1.5 1.050 1.0 and 49.5 51.0 1.5 2.210 1.0 Intrusives 85.3 268.8 183.5 0.135 Unknown includes 85.3 109.5 24.2 0.351 Unknown Volcanics 268.8 600.0 331.2 0.106 Unknown TM26-208 Intrusives 3.0 501.0 498.0 0.092 Unknown includes 354.0 355.5 1.5 1.010 Unknown and 432.0 433.5 1.5 7.220 Unknown and 448.5 450.0 1.5 2.090 Unknown TM26-209 Volcanics 3.5 421.2 417.7 0.077 Unknown includes 171.0 175.5 4.5 0.304 Unknown Intrusives 421.2 600.0 178.8 0.121 Unknown   Table 2.0 - Bench Target Resource Expansion Drilling Significant Results (continued) Hole ID Lithology From To Length Grade True Width (m) (m) (m) (Au g/t) (m) TM26-213 Volcanics 4.0 593.0 589.0 0.195 Unknown includes 4.0 291.7 287.7 0.223 Unknown includes 30.0 51.0 21.0 0.567 Unknown and 69.0 111.0 42.0 0.419 Unknown and 242.6 251.5 8.9 0.800 Unknown and 273.0 291.7 18.7 0.280 Unknown Intrusives 291.7 593.0 301.3 0.169 Unknown includes 291.7 314.8 23.1 0.544 Unknown includes 307.5 314.8 7.3 1.071 Unknown and 314.8 379.3 64.5 0.255 Unknown and 449.3 467.0 17.7 0.230 Unknown and 539.3 555.0 15.7 0.222 Unknown and 591.5 593.0 1.5 0.409 Unknown   True Width cannot be estimated due to insufficient information, except where noted. TM26-205 Results Figure 2.0 is a cross section parallel to hole TM26-205 showing the location of the new target discovered 200 metres east of the current resource pit shell. Mineralization is continuous along the entire 121.5 metre interval (Reference Table 3.0). TM26-205 also intersected the high grade core of the Bench Target near surface, intersecting 158.6 metres averaging 0.545 g/t Au within the brecciated and variably altered host rocks, including 54.0 metres averaging 1.088 g/t Au from surface to the interpreted limit of the Bench trend (Reference Table 4.0). This intercept lies entirely within the current pit limit constraining the 2026 MRE. The initial 158.6 metres of TM26-205 demonstrates good to excellent correlation to the current resource model, verifying the predictive accuracy in terms of both location and tenor of mineralization. The remaining 444.4 metres demonstrates poor correlation with the current resource model exclusively as a result of a lack of drill coverage which limits the predictive accuracy of the current resource model outside the currently drilled volume (Reference Figure 2.0). Figure 2.0 - Cross Section TM26-205 (Looking NW) 50 metre Influence To view an enhanced version of this graphic, please visit: https://images.newsfilecorp.com/files/5364/314602_33f1fd3224bb0bf8_002full.jpg Tables 3.0 and 4.0 below summarize the individual sample results from TM26-205. Table 3.0 - TM26-205 - Individual Results From New Target 200 metres East of MRE Pit Limit From (m) To (m) Au g/t From (m) To (m) Au g/t From (m) To (m) Au g/t 465.0 466.5 0.215 525.0 526.5 0.838 585.0 586.5 0.557 466.5 468.0 0.135 526.5 528.0 0.568 468.0 469.5 0.054 528.0 529.5 0.377 469.5 471.0 0.048 529.5 531.0 0.268 471.0 472.5 0.123 531.0 532.5 0.815 472.5 474.0 0.196 532.5 534.0 0.096 474.0 475.5 0.089 534.0 535.5 0.147 475.5 477.0 0.034 535.5 537.0 0.196 477.0 478.5 0.205 537.0 538.5 0.451 478.5 480.0 0.064 538.5 540.0 0.235 480.0 481.5 0.107 540.0 541.5 0.088 481.5 483.0 0.330 541.5 543.0 0.042 483.0 484.5 1.650 543.0 544.5 0.163 484.5 486.0 0.128 544.5 546.0 0.177 486.0 487.5 0.092 546.0 547.5 0.211 487.5 489.0 0.148 547.5 549.0 0.469 489.0 490.5 0.318 549.0 550.5 1.620 490.5 492.0 0.217 550.5 552.0 0.106 492.0 493.5 0.209 552.0 553.5 0.036 493.5 495.0 0.198 553.5 555.0 0.059 495.0 496.5 0.102 555.0 556.5 0.524 496.5 498.0 0.096 556.5 558.0 0.543 498.0 499.5 0.081 558.0 559.5 0.994 499.5 501.0 0.158 559.5 561.0 1.200 501.0 502.5 0.439 561.0 562.5 6.300 502.5 504.0 0.369 562.5 564.0 0.735 504.0 505.5 0.172 564.0 565.5 0.275 505.5 507.0 0.150 565.5 567.0 0.299 507.0 508.5 0.311 567.0 568.5 0.675 508.5 510.0 0.313 568.5 570.0 0.233 510.0 511.5 0.365 570.0 571.5 0.091 511.5 513.0 0.149 571.5 573.0 0.104 513.0 514.5 0.214 573.0 574.5 0.084 514.5 516.0 0.617 574.5 576.0 0.255 516.0 517.5 0.062 576.0 577.5 0.267 517.5 519.0 0.175 577.5 579.0 0.183 519.0 520.5 0.124 579.0 580.5 0.253 520.5 522.0 0.879 580.5 582.0 0.142 522.0 523.5 0.253 582.0 583.5 0.084 523.5 525.0 0.069 583.5 585.0 0.074   Table 4.0 - TM26-205 Individual Results Bench Target - High Grade Core From (m) To (m) Au g/t From (m) To (m) Au g/t From (m) To (m) Au g/t 4.9 6.0 0.203 64.5 66.0 0.347 123.0 124.5 0.050 6.0 7.5 0.754 66.0 67.5 0.174 124.5 126.0 0.042 7.5 9.0 0.448 67.5 69.0 0.130 126.0 127.5 0.047 9.0 10.5 1.030 69.0 70.5 0.629 127.5 129.0 0.122 10.5 12.0 0.568 70.5 72.0 0.242 129.0 130.5 0.059 12.0 13.5 0.954 72.0 73.5 0.109 130.5 132.0 0.037 13.5 15.0 1.100 73.5 75.0 0.227 132.0 133.5 0.070 15.0 16.5 0.597 75.0 76.5 0.157 133.5 135.0 0.068 16.5 18.0 0.526 76.5 78.0 0.093 135.0 136.5 0.096 18.0 19.5 0.039 78.0 79.5 1.500 136.5 138.0 0.114 19.5 21.0 0.223 79.5 81.0 1.390 138.0 139.5 0.279 21.0 22.5 1.060 81.0 82.5 1.410 139.5 141.0 0.113 22.5 24.0 0.692 82.5 84.0 0.480 141.0 142.5 0.129 24.0 25.5 0.735 84.0 85.0 0.193 142.5 144.0 0.100 25.5 27.0 0.527 85.0 86.1 0.159 144.0 145.0 2.240 27.0 28.5 0.970 86.1 87.6 0.012 145.0 146.0 0.181 28.5 30.0 2.560 87.6 89.1 0.008 146.0 147.0 0.204 30.0 31.5 0.805 89.1 90.6 0.003 147.0 148.5 0.149 31.5 33.0 0.401 90.6 91.6 0.213 148.5 150.0 0.068 33.0 34.5 0.839 91.6 93.0 0.195 150.0 151.5 0.028 34.5 36.0 1.300 93.0 94.5 0.460 151.5 153.0 0.235 36.0 37.5 1.100 94.5 96.0 0.885 153.0 154.5 0.053 37.5 39.0 0.959 96.0 97.5 1.020 154.5 156.0 0.064 39.0 40.5 2.390 97.5 99.0 0.118 156.0 157.5 0.138 40.5 42.0 1.300 99.0 100.5 0.094 157.5 159.0 1.650 42.0 43.5 0.694 100.5 102.0 0.014 159.0 160.5 0.447 43.5 45.0 1.100 102.0 103.5 0.398 160.5 161.5 0.160 45.0 46.5 0.616 103.5 105.0 0.046 161.5 162.5 0.187 46.5 48.0 0.668 105.0 106.5 0.032 162.5 163.5 0.082 48.0 49.5 0.651 106.5 108.0 0.025 49.5 51.0 1.290 108.0 109.5 0.007 51.0 52.5 4.900 109.5 111.0 0.090 52.5 54.0 0.579 111.0 112.5 0.007 54.0 55.5 1.550 112.5 114.0 0.023 55.5 57.0 1.300 114.0 115.5 0.024 57.0 58.5 3.120 115.5 117.0 0.008 58.5 60.0 0.814 117.0 118.5 0.029 60.0 61.5 0.289 118.5 120.0 0.044 61.5 63.0 0.347 120.0 121.5 0.068 63.0 64.5 0.544 121.5 123.0 0.074   TM26-213 Results TM26-213 was drilled to the southeast, sub-parallel to the interpreted trend of the Bench Target towards the 110 Target through an area of sparse drill density. TM26-213 intersected semi-continuous gold mineralization from surface to the end-of-hole returning 589.0 metres averaging 0.195 g/t Au over the entire drill hole. Approximately 50% of the hole lies within the current optimized pit. The remaining 50% of the hole suggests potential to expand the current resource beyond the currently defined optimized pit limit with a 64.5 metre long interval averaging 0.255 g/t Au observed at the current pit limit. Overall, TM26-213 demonstrates good to excellent correlation with the current resource model, verifying the predictive accuracy in terms of both location and tenor of mineralization. This hole clearly demonstrates the consistency of grade across the main lithological contact between the volcanics and intrusive rocks which occurs at a depth of 291.7 metres. Figure 3.0 presents a Cross Section View through hole TM26-213. Figure 3.0 - Cross Section TM26-213 (Looking E) 50 metre Influence To view an enhanced version of this graphic, please visit: https://images.newsfilecorp.com/files/5364/314602_33f1fd3224bb0bf8_003full.jpg Table 5.0 presents the individual assay results for the entirety of TM26-213. Table 5.0 - TM26-213 Individual Results Bench-110 Target From (m) To (m) Au g/t From (m) To (m) Au g/t From (m) To (m) Au g/t 4.0 5.0 0.393 61.5 63.0 0.040 121.5 123.0 0.159 5.0 6.0 0.313 63.0 64.5 0.138 123.0 124.5 0.120 6.0 7.5 0.291 64.5 66.0 0.221 124.5 126.0 0.122 7.5 9.0 0.101 66.0 67.5 0.094 126.0 127.5 0.125 9.0 10.5 0.052 67.5 69.0 0.100 127.5 129.0 0.123 10.5 12.0 0.051 69.0 70.5 0.567 129.0 130.5 0.108 12.0 13.5 0.066 70.5 72.0 0.807 130.5 132.0 0.199 13.5 15.0 0.151 72.0 73.5 0.787 132.0 133.5 0.172 15.0 16.5 0.697 73.5 75.0 0.915 133.5 135.0 0.055 16.5 18.0 0.239 75.0 76.5 0.773 135.0 136.5 0.067 18.0 19.5 0.443 76.5 78.0 0.445 136.5 138.0 0.047 19.5 21.0 0.395 78.0 79.5 0.269 138.0 139.5 0.105 21.0 22.5 0.110 79.5 81.0 0.307 139.5 141.0 0.020 22.5 24.0 0.069 81.0 82.5 0.432 141.0 142.5 0.026 24.0 25.5 0.011 82.5 84.0 0.380 142.5 144.0 0.047 25.5 27.0 0.152 84.0 85.5 0.421 144.0 145.5 0.101 27.0 28.5 0.058 85.5 87.0 0.535 145.5 147.0 0.019 28.5 30.0 0.134 87.0 88.5 0.600 147.0 148.5 0.051 30.0 31.5 0.563 88.5 90.0 0.278 148.5 150.0 0.035 31.5 33.0 1.620 90.0 91.5 0.188 150.0 151.5 0.019 33.0 34.5 0.033 91.5 93.0 0.224 151.5 153.0 0.044 34.5 36.0 0.419 93.0 94.5 0.153 153.0 154.5 0.045 36.0 37.0 0.439 94.5 96.0 0.294 154.5 156.0 0.093 37.0 37.9 0.397 96.0 97.5 0.784 156.0 157.5 0.054 37.9 39.2 0.099 97.5 99.0 0.214 157.5 159.0 0.159 39.2 40.7 0.037 99.0 100.5 0.318 159.0 160.5 0.086 40.7 42.2 0.742 100.5 102.0 0.442 160.5 162.0 0.151 42.2 43.7 0.869 102.0 103.5 0.559 162.0 163.5 0.157 43.7 45.2 0.755 103.5 105.0 0.228 163.5 165.0 0.121 45.2 46.8 0.081 105.0 106.5 0.144 165.0 166.5 0.206 46.8 48.3 0.366 106.5 108.0 0.287 166.5 168.0 0.107 48.3 49.5 1.900 108.0 109.5 0.158 168.0 169.5 0.036 49.5 51.0 0.324 109.5 111.0 0.214 169.5 170.7 0.014 51.0 52.5 0.041 111.0 112.5 0.189 170.7 172.3 0.003 52.5 54.0 0.023 112.5 114.0 0.136 172.3 173.9 0.011 54.0 55.5 0.058 114.0 115.5 0.148 173.9 175.5 0.029 55.5 57.0 0.025 115.5 117.0 0.407 175.5 177.0 0.151 57.0 58.4 0.030 117.0 118.5 0.144 177.0 178.5 0.140 58.4 60.0 0.145 118.5 120.0 0.108 178.5 180.0 0.093 60.0 61.5 0.076 120.0 121.5 0.234 180.0 181.5 0.095   Table 5.0 - TM26-213 Individual Results Bench-110 Target (continued) From (m) To (m) Au g/t From (m) To (m) Au g/t From (m) To (m) Au g/t 181.5 183.0 0.152 238.0 239.5 0.142 293.8 295.3 0.117 183.0 184.5 0.190 239.5 241.0 0.062 295.3 296.8 0.462 184.5 186.0 0.139 241.0 242.6 0.081 296.8 298.0 0.154 186.0 187.5 0.188 242.6 244.0 1.140 298.0 299.0 0.351 187.5 189.0 0.109 244.0 245.5 2.480 299.0 300.2 0.150 189.0 190.1 0.115 245.5 247.0 0.217 300.2 301.7 0.401 190.1 191.1 0.137 247.0 248.5 0.154 301.7 303.2 0.328 191.1 191.9 0.078 248.5 250.0 0.212 303.2 304.2 0.475 191.9 193.5 0.030 250.0 251.5 0.619 304.2 305.2 0.439 193.5 195.0 0.049 251.5 253.0 0.063 305.2 306.3 0.284 195.0 196.5 0.022 253.0 254.5 0.082 306.3 307.5 0.127 196.5 198.0 0.247 254.5 256.0 0.050 307.5 309.0 0.874 198.0 199.5 0.142 256.0 257.5 0.050 309.0 310.5 1.520 199.5 201.0 0.383 257.5 259.0 0.048 310.5 311.6 1.040 201.0 202.5 0.127 259.0 260.5 0.078 311.6 312.6 1.420 202.5 204.0 0.257 260.5 261.7 0.136 312.6 313.6 0.885 204.0 205.5 0.663 261.7 262.7 0.135 313.6 314.8 0.649 205.5 207.0 0.049 262.7 264.0 0.096 314.8 315.8 0.209 207.0 208.5 0.077 264.0 265.5 0.030 315.8 317.0 0.102 208.5 210.0 0.038 265.5 267.0 0.015 317.0 318.0 0.154 210.0 211.5 0.048 267.0 268.5 0.018 318.0 319.5 0.459 211.5 213.0 0.050 268.5 270.0 0.017 319.5 321.0 0.169 213.0 214.5 0.049 270.0 271.5 0.051 321.0 322.0 0.321 214.5 216.0 0.029 271.5 273.0 0.067 322.0 323.5 0.301 216.0 217.5 0.026 273.0 274.5 0.443 323.5 325.0 0.143 217.5 219.0 0.030 274.5 276.0 0.095 325.0 326.4 0.070 219.0 220.5 0.018 276.0 277.5 0.034 326.4 327.5 0.221 220.5 222.0 0.037 277.5 279.0 0.111 327.5 328.6 0.197 222.0 223.5 0.021 279.0 280.5 0.143 328.6 330.1 0.013 223.5 225.0 0.018 280.5 282.0 0.300 330.1 331.6 0.024 225.0 226.5 0.045 282.0 283.5 0.736 331.6 333.0 0.216 226.5 228.0 0.161 283.5 285.0 0.508 333.0 334.5 0.145 228.0 229.5 0.128 285.0 286.5 0.222 334.5 336.0 0.128 229.5 231.0 0.050 286.5 288.0 0.128 336.0 337.1 0.089 231.0 232.5 0.078 288.0 289.5 0.614 337.1 338.1 0.233 232.5 233.5 0.100 289.5 290.7 0.087 338.1 339.2 0.438 233.5 234.6 0.045 290.7 291.7 0.133 339.2 340.2 0.206 234.6 236.0 0.201 VOLCANIC INTRUSIVE CONTACT 340.2 341.4 0.596 236.0 237.0 0.157 291.7 292.7 0.229 341.4 342.5 0.523 237.0 238.0 0.144 292.7 293.8 0.420 342.5 344.0 0.497   Table 5.0 - TM26-213 Individual Results Bench-110 Target (continued) From (m) To (m) Au g/t From (m) To (m) Au g/t From (m) To (m) Au g/t 344.0 345.5 0.590 399.5 401.0 0.126 455.8 457.0 0.128 345.5 347.0 0.480 401.0 402.5 0.181 457.0 458.5 0.189 347.0 348.5 0.143 402.5 404.0 0.023 458.5 459.5 0.175 348.5 350.0 0.117 404.0 405.5 0.017 459.5 461.0 0.239 350.0 351.5 0.213 405.5 407.0 0.072 461.0 462.5 0.211 351.5 353.0 0.212 407.0 408.5 0.045 462.5 464.0 0.215 353.0 354.5 0.100 408.5 410.0 0.083 464.0 465.5 0.081 354.5 356.0 0.232 410.0 411.5 0.057 465.5 467.0 0.207 356.0 357.5 0.071 411.5 413.0 0.570 467.0 468.5 0.087 357.5 359.0 0.116 413.0 414.5 0.184 468.5 470.0 0.066 359.0 360.5 0.284 414.5 416.0 0.151 470.0 471.5 0.054 360.5 361.8 0.037 416.0 417.5 0.083 471.5 473.0 0.094 361.8 362.8 0.116 417.5 419.0 0.064 473.0 474.5 0.116 362.8 364.3 0.218 419.0 420.5 0.189 474.5 476.0 0.041 364.3 365.5 0.264 420.5 421.6 0.083 476.0 477.5 0.129 365.5 366.7 0.345 421.6 422.6 0.158 477.5 479.0 0.199 366.7 368.2 0.159 422.6 423.5 0.151 479.0 480.5 0.024 368.2 369.7 0.640 423.5 424.5 0.161 480.5 482.0 0.010 369.7 371.2 0.180 424.5 426.0 0.173 482.0 483.5 0.036 371.2 372.2 0.677 426.0 427.5 0.055 483.5 485.0 0.022 372.2 373.2 0.112 427.5 429.0 0.037 485.0 486.5 0.041 373.2 374.4 1.060 429.0 430.5 0.033 486.5 488.0 0.146 374.4 375.5 0.144 430.5 432.0 0.055 488.0 489.5 0.488 375.5 377.0 0.203 432.0 433.5 0.061 489.5 491.0 0.027 377.0 378.5 0.229 433.5 435.0 0.020 491.0 492.5 0.042 378.5 379.3 0.337 435.0 436.5 0.050 492.5 494.0 0.089 379.3 380.2 0.071 436.5 438.0 0.024 494.0 495.0 0.020 380.2 381.7 0.025 438.0 439.5 0.048 495.0 496.5 0.042 381.7 383.0 0.050 439.5 441.0 0.070 496.5 498.0 0.020 383.0 384.5 0.135 441.0 442.5 0.025 498.0 499.5 0.038 384.5 386.0 0.038 442.5 444.0 0.049 499.5 501.0 0.012 386.0 387.5 0.062 444.0 445.5 0.083 501.0 502.5 0.031 387.5 389.0 0.228 445.5 447.0 0.020 502.5 504.0 0.031 389.0 390.5 0.032 447.0 448.2 0.006 504.0 505.5 0.058 390.5 392.0 0.140 448.2 449.3 0.063 505.5 507.0 0.017 392.0 393.5 0.065 449.3 450.8 0.278 507.0 508.5 0.011 393.5 395.0 0.253 450.8 452.3 0.344 508.5 510.0 0.056 395.0 396.5 0.087 452.3 453.6 0.288 510.0 511.5 0.070 396.5 398.0 0.028 453.6 454.6 0.268 511.5 513.0 0.021 398.0 399.5 0.123 454.6 455.8 0.373 513.0 514.5 0.017   Table 5.0 - TM26-213 Individual Results Bench-110 Target (continued) From (m) To (m) Au g/t From (m) To (m) Au g/t From (m) To (m) Au g/t 514.5 516.0 0.053 573.0 574.5 0.034 516.0 517.5 0.023 574.5 576.1 0.179 517.5 519.0 0.031 576.1 577.5 0.132 519.0 520.1 0.286 577.5 579.0 0.177 520.1 521.5 0.136 579.0 580.2 0.261 521.5 523.0 0.057 580.2 581.5 0.049 523.0 524.5 0.136 581.5 582.5 0.044 524.5 526.0 0.075 582.5 584.0 0.050 526.0 527.5 0.165 584.0 585.5 0.077 527.5 529.0 0.090 585.5 587.0 0.042 529.0 530.5 0.084 587.0 588.5 0.009 530.5 532.0 0.069 588.5 590.0 0.016 532.0 533.5 0.053 590.0 591.5 0.055 533.5 535.0 0.052 591.5 593.0 0.409 535.0 536.5 0.037 536.5 538.0 0.025 538.0 539.3 0.092 539.3 540.5 0.160 540.5 542.0 0.327 542.0 543.5 0.092 543.5 545.0 0.134 545.0 546.5 0.250 546.5 548.0 0.233 548.0 549.0 0.224 549.0 550.5 0.619 550.5 552.0 0.178 552.0 553.5 0.030 553.5 555.0 0.183 555.0 556.5 0.049 556.5 558.0 0.049 558.0 559.5 0.015 559.5 561.0 0.020 561.0 562.5 0.014 562.5 564.0 0.025 564.0 565.5 0.035 565.5 567.0 0.003 567.0 568.5 0.003 568.5 570.0 0.003 570.0 571.5 0.003 571.5 573.0 0.003   Quality Assurance and Quality Control Diamond drilling utilizes NQ diameter tooling. The core is received at the on-site logging facility where it is, photographed, logged for geotechnical, physical properties and geological data. Samples are identified, recorded, and cut in half by wet diamond saw. Half the core is sent for assay at an accredited laboratory with the remaining half core stored on site. A standard sample length of 1.5 meters is typically employed, varying only at major lithological contacts. Certified standards and blanks are randomly inserted into the sample stream and constitute approximately 10% of the sample stream. Certified standards and blank performance is monitored with any failures evaluated and investigated to determine if said failure is a result of error during submission. Any unexplained failures are identified and the five samples preceding and following the failure are re-assayed. Commencing in 2026, duplicate pulps are prepared at a rate of 1 in every 20 samples. The duplicate pulps are sent to a second independent analytical facility for analyses. Activation Laboratories Ltd., Thunder Bay, Ontario, ISO/IEC 17025:2017 is the primary independent analytical service provider. AGAT Laboratories, Thunder Bay, Ontario, ISO/IEC 17025:2017 is the secondary, independent analytical facility. Samples are, received, dried, crushed to 80% passing 2.0 mm. A 250-gram sample is split and pulverized. Samples are analyzed for gold using a 30-gram lead collection fire assay fusion (FA) with an atomic absorption (AAS) finish. All assay results greater than 5.0 g/t Au are re-assayed using a gravimetric analysis. All assays greater than 30.0 g/t Au are re-assayed using screen metallics where a representative 1000-gram sample is split sieved at 149µm. Assays are performed on the entire +149 µm fraction and two splits of the -149 µm fraction. A final assay is calculated based on the weight of each size fraction. Qualified Person Technical information in this news release has been reviewed and approved by Wes Hanson, P.Geo., President and CEO of Thunder Gold Corp., who is a Qualified Person under the definitions established by NI 43-101. About the Tower Mountain Gold Property The 7,625-hectare, 100%-owned Tower Mountain Property is beside the Trans-Canada highway, 40-km west of Thunder Bay, Ontario (pop. 120,000). Gold mineralization occurs in variably brecciated and altered rocks surrounding the calc-alkalic Tower Mountain Intrusive Complex ("TMIC"). Drilling to date has established an initial mineral resource parallel to the western contact of the intrusion representing approximately 25% of the TMIC halo. The MRE has an effective date of January 19, 2026. A Technical Report titled " NI 43-101 Technical Report for the 2026 Mineral Resource Estimate on the Tower Mountain Project, Ontario, Canada." is available on the Company's website at www.thundergoldcorp.com and on SEDAR+ (www.sedarplus.ca) under the Company's Issuer profile. The Report was prepared by Charley Murahwi, P.Geo., FAusIMM.; William Lewis, P.Geo., Tudorel Ciuculescu, P.Geo., and Richard Gowans, P.Eng., all of Micon International Limited ("Micon"), Toronto, Ontario, Canada. The Report was prepared in accordance with National Instrument 43-101 Standards of Disclosure for Mineral Projects ("NI 43-101") and CIM Definition Standards of Mineral Resources and Mineral Reserves. The MRE is summarized as follows: Tower Mountain Mineral Resource Estimate - January 19, 2026   Category Tonnage (Mt) Grade (g/t Au) Contained Metal ('000 oz gold)     Indicated 34.5 0.46 514     Inferred 211.1 0.45 3,053     Notes: The effective date of this MRE is January 19, 2026. Messrs. William Lewis, P.Geo., Charley Murahwi, P.Geo., FAusIMM, and Tudorel Ciuculescu, P.Geo. from Micon International Limited are the Qualified Persons (QPs) responsible for this MRE. The MRE has been classified in the Indicated and Inferred categories. At this time, there are no Measured resources at the Tower Mountain Project. The calculated gold cut-off grade is 0.19 g/t Au. An average specific gravity (SG) value of 2.77 g/cm3 was used. The MRE used economic assumptions for open pit mining. The following economic parameters were used for generating the cut-off grade: a gold price of US$3,000/oz, 80% recovery, open pit mining cost of US$3.0/t, processing costs of US$8.0/t, general and administration cost of US$3.5/t, transportation cost of US$2.5/oz of gold, and a royalty of 3%. The open pit used slope angles of 30° in overburden and 50° in fresh rock. The block model is orthogonal and has a parent block size of 5 m x 5 m x 5 m, with minimum sub-block size of 2.5 m x 2.5 m x 2.5 m. The open pit optimization used a re-blocked size of 10 m x 10 m x 10 m. The mineral resources described above have been prepared in accordance with the current Canadian Institute of Mining, Metallurgy and Petroleum Standards and Practices. Numbers have been rounded to the nearest million tonnes and nearest thousand ounces. Differences may occur in totals due to rounding. Mineral Resources are not Mineral Reserves as they do not have demonstrated economic viability. The quantity and grade of reported Inferred Mineral Resources are uncertain in nature and there has been insufficient exploration; however, it is reasonably expected that a significant portion of Inferred Mineral Resources could be upgraded into Indicated Mineral Resources with further exploration. Micon QPs have not identified any legal, political, environmental, or other relevant factors that could materially affect the potential development of the mineral resources and of the estimate. The remaining 75% of the TMIC halo demonstrates similar geology, alteration, and geophysical signatures and is untested by drilling. A second gold trend, identified in 2026, outcrops at surface and is continuously mineralized over a 100-metre width. This gold mineralization occurs within Timiskaming-type conglomerates that have been traced for over 5.0 kilometres along a southwest trend paralleling the Thunder Lake Fault. The Company believes both targets offer opportunities to materially increase the total resource through systematic drilling. About Thunder Gold Corp. Thunder Gold is advancing the Tower Mountain project in Thunder Bay, Ont. -- an emerging gold system with the scale, consistency and quality to support a long-life, open-pit operation. Results from the disciplined drill programs have consistently reinforced confidence in the continuity and predictability of the discovery while highlighting significant potential for expansion across multiple zones of the Tower Mountain intrusive complex. With industry-leading drilling costs, existing infrastructure and a skilled local work force, Tower Mountain represents a rare combination of size, scalability and cost-effective growth. At Thunder Gold, our vision is clear: to unlock a discovery that has the potential to become a transformational gold project, delivering long-term value for shareholders while contributing to the future of Canada's mining industry. For more information about the Company please visit: www.thundergoldcorp.com. On behalf of the Board of Directors, Wes Hanson, P.Geo., President and CEO For further information contact: Wes Hanson, CEO (647) 202-7686 [email protected] Bryan Baritot, Investor Relations [email protected] NEITHER THE TSXV NOR ITS REGULATION SERVICES PROVIDER (AS THAT TERM IS DEFINED IN THE POLICIES OF THE TSXV) ACCEPTS RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THIS RELEASE. The information contained herein contains "forward-looking information" and "forward-looking statements" within the meaning of applicable securities legislation (collectively, "forward-looking statements"). Forward-looking statements relate to information that is based on assumptions of management, forecasts of future results, and estimates of amounts not yet determinable. All statements, other than statements of historical fact, are forward-looking statements and are based on predictions, expectations, beliefs, plans, projections, objectives and assumptions made as of the date of this news release, including the Company's plans regarding exploring its mineral exploration properties; anticipated results of geophysical surveys, drilling programs, geological interpretations and potential mineral recovery. Any statement that involves discussions with respect to predictions, expectations, beliefs, plans, projections, objectives, assumptions, future events or performance (often but not always using phrases such as "expects", or "does not expect", "is expected", "anticipates" or "does not anticipate", "plans", "budget", "scheduled", "forecasts", "estimates", "believes" or "intends" or variations of such words and phrases or stating that certain actions, events or results "may" or "could", "would", "might" or "will" be taken to occur or be achieved) are not statements of historical fact and may be forward-looking statements. Forward-looking statements are subject to a variety of risks and uncertainties which could cause actual events or results to differ from those reflected in the forward-looking statements, including, without limitation: risks related to failure to obtain adequate funding on a timely basis and on acceptable terms; risks related to the outcome of legal proceedings; political and regulatory risks associated with mining and exploration; risks related to the maintenance of stock exchange listings; risks related to environmental regulation and liability; the potential for delays in exploration or development activities or the completion of feasibility studies; the uncertainty of profitability; risks and uncertainties relating to the interpretation of drill results, the geology, grade and continuity of mineral deposits; risks related to the inherent uncertainty of production and cost estimates and the potential for unexpected costs and expenses; results of prefeasibility and feasibility studies, and the possibility that future exploration, development or mining results will not be consistent with the Company's expectations; risks related to the gold price and other commodity price fluctuations; and other risks and uncertainties related to the Company's prospects, properties and business detailed elsewhere in the Company's disclosure record. Should one or more of these risks and uncertainties materialize, or should underlying assumptions prove incorrect, actual results may vary materially from those described in forward-looking statements. Investors are cautioned against attributing undue certainty or reliance on forward-looking statements. These forward-looking statements are made as of the date hereof and the Company does not assume any obligation to update or revise any forward-looking statements, other than as required by applicable law, to reflect new information, events or circumstances, or changes in management's estimates, projections or opinions. Actual events or results could differ materially from those anticipated in the forward-looking statements or from the Company's expectations or projections. To view the source version of this press release, please visit https://www.newsfilecorp.com/release/314602
View at source ↗