Drill Results
Norsemont Commences Drill Program at Choquelimpie Project

NOM · Price
Executive Summary
- Norsemont Mining announced the start of its Phase 3 exploration drilling at the 100% owned Choquelimpie gold‑silver‑copper project in northern Chile.
- The program will drill up to 5,000 m across ~20 holes using two Longyear LF230 diamond rigs, targeting deeper extensions of high‑grade hydrothermal breccia bodies below the current resource envelope.
- Drilling is scheduled to begin immediately and run through late December, with a 24‑hour operating schedule and expected “steady progress” and regular news flow over the coming months.
Key Details
- Program Scope: Up to 5,000 m of diamond drilling; ~20 holes averaging 250 m each.
- Equipment: Two Longyear LF230 track‑mounted drill rigs (one already on site, second arriving next week).
- Contractor: DV Drilling Ltd. (Coquimbo, Chile) engaged by Norsemont’s subsidiary SCM Vilacollo to execute the campaign.
- Target Zones: Deeper extensions of higher‑grade hydrothermal breccia bodies in zones such as Choque, Vizcacha and Suri, below the existing mineral resource envelope.
- Schedule: Drilling commences immediately; 24‑hour operation; expected completion by late December 2025.
- Historical Context: Prior production (1988‑1996) focused on near‑surface oxidized ore (20‑100 m depth). Phase 3 aims to test the deeper sulphide resource potential.
- Qualified Person: David Flint, MSc, AIPG‑CPG, Chief Geologist – NI 43‑101 qualified person reviewed and approved technical information.
Notable Quotes
“We are very excited to launch Phase 3 drilling at Choquelimpie… testing higher grade mineralization at depth in several zones such as Choque, Vizcacha and Suri… With two rigs on site, we expect steady progress and consistent news flow over the coming months.” – Marc Levy, CEO & Chairman, Norsemont Mining Inc.
More from Norsemont Mining Inc.
Jun 05, 2026 · 09:00