Northwire Canada EditionThursday, July 30, 2026
Northwire
ZAC 0.060 +0.0% ELE 21.18 −1.7% GHRT 0.750 +0.0% AEM 203.13 +0.1% JTWO 0.135 +0.0% EDR 10.63 −2.8% VMXX 0.750 +5.6% K 32.71 −1.5% AGI 40.13 −1.4% VGZ 2.40 +0.8% CAN 0.055 +0.0% NVO 0.055 +0.0% ARIS 19.57 −4.2% IVN 10.59 −0.8% MCI 0.165 +0.0% MTS 0.130 +0.0% ZAC 0.060 +0.0% ELE 21.18 −1.7% GHRT 0.750 +0.0% AEM 203.13 +0.1% JTWO 0.135 +0.0% EDR 10.63 −2.8% VMXX 0.750 +5.6% K 32.71 −1.5% AGI 40.13 −1.4% VGZ 2.40 +0.8% CAN 0.055 +0.0% NVO 0.055 +0.0% ARIS 19.57 −4.2% IVN 10.59 −0.8% MCI 0.165 +0.0% MTS 0.130 +0.0%
Drill Results

Metallis conducts geophysical survey at Greyhound

MTS · Price

Executive Summary

  • Metallis Resources completed a high‑resolution UAV magnetic survey (298 km) over the Greyhound property in central Idaho – the first geophysical program on this asset.
  • Interpretation identified key structural features, including the continuity of the Greyhound shear, multiple parallel shears, and a magnetic anomaly coincident with a historic high‑grade shoot, which will be used to prioritize drill targets.
  • The company plans to commence its inaugural drilling campaign in mid‑August 2026, targeting ~2,000 m across six‑to‑eight pads along the 3.5‑km shear zone, with camp construction and additional soil sampling underway.

Key Details

  • Survey Execution: Conducted by Pioneer Exploration Consultants Ltd.; 298 line‑kilometre UAV magnetic survey completed.
  • Interpretation Lead: Jules Lajoie (consulting geophysicist).
  • Key Findings:
  • Outlined the Greyhound shear beneath overburden.
  • Identified multiple parallel shears and a north–south linear fabric intersecting the main shear, suggesting structural control on mineralization.
  • Detected a magnetic anomaly that aligns with the historic high‑grade 1,350‑ft shoot in the Lower Rufus adit (referenced from May 21 2025 release).
  • Recognized breaks in linear magnetic features as potential faults/fluid flow zones; when overlapped with soil anomalies, they become prospective drill targets.
  • Integration: Magnetic data merged with existing geological and geochemical datasets to refine target prioritization and drill‑hole planning.
  • Drilling Program Schedule:
  • Start: Mid‑August 2026.
  • Planned depth: ~2,000 m total.
  • Number of pads: 6–8 along the 3.5‑km shear zone.
  • Field Preparations: Camp construction in progress; follow‑up soil sampling and detailed geological mapping to focus on areas highlighted by magnetic data.
  • Qualified Person: David Dupre, P.Geo., Vice‑President Exploration, has reviewed and approved all technical information per NI 43‑101.

Notable Quotes

“The completion of our first geophysical survey at Greyhound represents a significant step in advancing the project toward its inaugural drill program… The drone magnetic data has provided valuable insight into the structural framework of the property…” – Fiore Aliperti, President & CEO.

Read the original news release →

More from Metallis Resources Inc.