Northwire Canada EditionMonday, August 10, 2026
Northwire
WHN 0.375 −2.6% LME 0.140 +3.7% AAUC 30.49 +5.3% GGM 0.040 +14.3% FDY 6.18 +3.2% MOG 0.640 +3.2% NEXM 3.20 +1.3% NCAU 0.330 +3.1% LUC 0.160 +0.0% BTR 0.140 +0.0% SMRV 0.200 −16.7% BIG 0.880 +3.5% URC 3.89 +0.0% ATY 0.250 −2.0% NRM 0.075 +7.1% WMS 0.040 +0.0% WHN 0.375 −2.6% LME 0.140 +3.7% AAUC 30.49 +5.3% GGM 0.040 +14.3% FDY 6.18 +3.2% MOG 0.640 +3.2% NEXM 3.20 +1.3% NCAU 0.330 +3.1% LUC 0.160 +0.0% BTR 0.140 +0.0% SMRV 0.200 −16.7% BIG 0.880 +3.5% URC 3.89 +0.0% ATY 0.250 −2.0% NRM 0.075 +7.1% WMS 0.040 +0.0%
Drill Results

West Red Lake Gold Confirms Additional High-Grade Gold in Lower Austin with 26.16 g/t Au over 11.2m, 37.87 g/t Au over 3.55m and 10.55 g/t Au over 8m

None

Executive Summary

On November 4, 2025, West Red Lake Gold (WRLG) announced additional high-grade drill results from the Lower Austin Zone at its Madsen Mine. The drilling is part of an ongoing underground definition and expansion program. Key intercepts include: - 26.16 g/t Au over 11.2 meters, including a higher-grade section. - 37.87 g/t Au over 3.55 meters. - 10.55 g/t Au over 8.0 meters. - 23.63 g/t Au over 1.5 meters.

The drilling totals 1,501.5 meters over 17 holes. President & CEO Shane Williams stated that the Madsen mine ramp-up is progressing well and these results reinforce the company's view that Madsen will be a sustainable, long-life asset. The company is finalizing plans for development to access deeper parts of the resource for further conversion drilling.

Material Impact

The news is Materially Positive. These results are not as spectacular as the "jewelry box" discovery announced on October 9, 2025 (139.45 g/t Au over 7.8m), but they are extremely strong and, crucially, confirm the continuity of high-grade mineralization in the deeper parts of the Austin zone.

  • De-risking and Confirmation: This news provides strong confirmation that the bonanza-grade discovery in October was not an isolated occurrence. Consistently hitting intercepts with grades over 20 g/t Au across mineable widths significantly de-risks the geological model and increases confidence in the near-to-medium term mine plan.
  • Alignment with Strategy: The results are perfectly in line with the company's stated strategy: ramp up production at Madsen while aggressively drilling to define and expand high-grade resources that can be efficiently added to the production schedule. This approach is essential for a new producer needing to generate strong cash flow to service a considerable debt load.
  • Historical Context: WRLG has methodically progressed from acquiring the mine in mid-2023, publishing a positive PFS (Jan 2025), achieving excellent bulk sample reconciliation (May 2025), and restarting the mine (May 2025). The company has a track record of meeting or exceeding its operational targets (e.g., Connection Drift completion, ramp-up production increases). These drill results further build on that credibility.
  • Financial Impact: Adding high-grade ounces near existing infrastructure is the most profitable path for a mining company. These results suggest the potential to increase the reserve grade and/or mine life beyond the PFS projections, which were based on a conservative US$1,680/oz gold price. This is vital given the PFS outlined a high All-In Sustaining Cost (AISC) of US$1,681/oz. Every high-grade tonne helps improve margins and accelerates the path to free cash flow.

While not a "game-changer" in the same vein as the initial discovery, these follow-up results are material as they solidify the economic potential of a key mining area and demonstrate the exploration upside remains robust.

WRLG · Price
Company Overview

West Red Lake Gold Mines Ltd. is a Canadian gold mining company focused on the Red Lake Gold District in Northwestern Ontario. Its flagship asset is the 100%-owned Madsen Gold Mine, a past-producing, high-grade underground mine with a fully permitted mill and tailings facility. After acquiring the asset out of creditor protection in mid-2023, WRLG has focused on restarting operations. The company published a positive Pre-Feasibility Study (PFS) in January 2025, officially restarted the mine in May 2025, and is currently ramping up to commercial production, targeted for early 2026. The company also owns the nearby Rowan Project, for which it published a positive PEA in July 2025, forming part of a "hub-and-spoke" growth strategy.

Read the original news release →

More from West Red Lake Gold Mines Ltd.