Northwire Canada EditionFriday, September 11, 2026
Northwire
GOLD 4444.30 +0.8% SILVER 65.81 +1.4% COPPER 6.57 +0.3% OIL 99.21 −3.2% PALLADIUM 1337.75 +3.3% FEO 0.780 +0.0% LBNK 0.710 +0.0% SCOT 3.07 +0.0% PPP 0.830 +0.0% SLVR 1.14 +5.1% NCX 4.26 +0.7% ADY 0.305 +0.0% AIS 0.135 +0.0% MNO 1.90 +2.1% ZNX 0.205 −4.7% TORQ 0.060 +0.0% ALK 1.88 +4.4% SMRV 0.175 +0.0% LWR 0.050 +0.0% ZON 0.130 +0.0% TLO 10.87 −3.0% GOLD 4444.30 +0.8% SILVER 65.81 +1.4% COPPER 6.57 +0.3% OIL 99.21 −3.2% PALLADIUM 1337.75 +3.3% FEO 0.780 +0.0% LBNK 0.710 +0.0% SCOT 3.07 +0.0% PPP 0.830 +0.0% SLVR 1.14 +5.1% NCX 4.26 +0.7% ADY 0.305 +0.0% AIS 0.135 +0.0% MNO 1.90 +2.1% ZNX 0.205 −4.7% TORQ 0.060 +0.0% ALK 1.88 +4.4% SMRV 0.175 +0.0% LWR 0.050 +0.0% ZON 0.130 +0.0% TLO 10.87 −3.0%
Other

EnviroGold Global Announces Outstanding Phase 3 Metallurgical Results from Major Tailings Reprocessing Projects

NVRO · Price

Executive Summary

  • EnviroGold Global announced independently‑validated Phase 3 test results for its NVRO Process™, showing >99.5% recovery of gold and silver to saleable concentrate.
  • Concentrate grades surged (gold from 5.5 g/t to 20.9 g/t; silver from 92 g/t to 554 g/t), indicating a strong economic upside for tailings reprocessing projects.
  • The results also demonstrate significant environmental benefits, including an estimated 86% reduction in acid‑mine‑drainage potential and a 14% cut in on‑site tailings volume.

Key Details

  • Metallurgical Recoveries (independent ALS Labs test):
  • Gold recovery: 99.55 % to concentrate.
  • Silver recovery: 98.96 % to concentrate.
  • Gold grade in concentrate increased 380 % (5.5 g/t → 20.9 g/t).
  • Silver grade in concentrate increased 602 % (92 g/t → 554 g/t).
  • Base and critical metals reported to pregnant leach solution (PLS) rose 8 %.

  • Process Validation: Strong correlation between laboratory results and Andritz IDEAS simulation modelling, confirming scalability of the NVRO Process™.

  • Environmental & Sustainability Benefits (project‑specific):

  • 86 % reduction in acid‑mine‑draining potential via pyrite reduction.
  • Production of 1.2 million tonnes of saleable precious‑metal concentrate.
  • Additional revenue from base and critical metals recovered from PLS.
  • 14 % reduction in on‑site tailings volumes.

  • Economic Opportunity: Tailings inventory at the customer site exceeds 9 million t, with gross in‑situ metal values estimated > US$3 billion (primarily gold and silver).

  • Path Forward – Phase 4: Will validate mass balance, recovery performance, project economics, and environmental outcomes at commercial scale.

  • Management Commentary:

  • Grant Freeman (CEO) highlighted the “exceptional technical and economic potential” of the NVRO Process™.
  • Royston Denysschen (COO) emphasized near‑total precious‑metal recovery, predictive model validation, and significant environmental benefits.

Notable Quotes

  • Grant Freeman, CEO: “These Phase 3 results confirm the exceptional technical and economic potential of the NVRO Process™ to realise metal value from tailings while delivering exceptional environmental benefits.”
  • Royston Denysschen, COO: “I am proud of the work that our team and partners have achieved in 2025 delivering a combination of near total precious metal recovery, validation of our predictive process model and the environmental benefits of pyrite and tailings volume reduction.”
Read the original news release →

More from EnviroGold Global Limited