Northwire Canada EditionThursday, July 30, 2026
Northwire
ZAC 0.060 +0.0% ELE 21.18 −1.7% GHRT 0.750 +0.0% AEM 203.13 +0.1% JTWO 0.135 +0.0% EDR 10.63 −2.8% VMXX 0.750 +5.6% K 32.71 −1.5% AGI 40.13 −1.4% VGZ 2.40 +0.8% CAN 0.055 +0.0% NVO 0.055 +0.0% ARIS 19.57 −4.2% IVN 10.59 −0.8% MCI 0.165 +0.0% MTS 0.130 +0.0% ZAC 0.060 +0.0% ELE 21.18 −1.7% GHRT 0.750 +0.0% AEM 203.13 +0.1% JTWO 0.135 +0.0% EDR 10.63 −2.8% VMXX 0.750 +5.6% K 32.71 −1.5% AGI 40.13 −1.4% VGZ 2.40 +0.8% CAN 0.055 +0.0% NVO 0.055 +0.0% ARIS 19.57 −4.2% IVN 10.59 −0.8% MCI 0.165 +0.0% MTS 0.130 +0.0%
Resource Estimate

NexMetals Drills 231 Metres of 1.09% CuEq, Including 97 Metres of 1.28% CuEq Establishing Scale, Grade and Expansion Potential at Selkirk

NEXM · Price

Executive Summary

  • NexMetals released assay results from the final three holes of its 2025 metallurgical drill program at Selkirk Mine, showing wide intervals of continuous Cu‑Ni‑Co‑PGE mineralization.
  • The most significant intercepts include 231 m @ 1.09% CuEq (incl. 97 m @ 1.28% CuEq and 47.9 m @ 1.42% CuEq).
  • All results will be incorporated into an updated Mineral Resource Estimate (MRE) and support ongoing metallurgical test work aimed at optimizing the processing flowsheet.

Key Details

  • Hole SMET‑25‑009:
  • 231 m @ 1.09% CuEq (0.39% Cu, 0.38% Ni, 0.64 ppm Pd, 0.15 ppm Pt)
  • Includes 97 m @ 1.28% CuEq (0.46% Cu, 0.43% Ni, 0.76 ppm Pd, 0.18 ppm Pt)
  • Includes 47.9 m @ 1.42% CuEq (0.52% Cu, 0.49% Ni, 0.83 ppm Pd, 0.17 ppm Pt)

  • Hole SMET‑25‑010:

  • 171 m @ 0.85% CuEq (0.29% Cu, 0.29% Ni, 0.51 ppm Pd, 0.12 ppm Pt)
  • Includes higher-grade sub‑intervals up to 1.18% CuEq over 50 m.

  • Hole SMET‑25‑011:

  • Multiple intervals ranging from 0.52% to 1.07% CuEq, including a 13 m @ 0.52% CuEq intercept below the MRE and a 152.9 m @ 0.79% CuEq interval within the conceptual pit shell.

  • Depth Context:

  • Intercepts both above and below the existing Mineral Resource Estimate demonstrate potential for deposit expansion at depth and toward the surface.

  • Cut‑off Grade:

  • Current US$25/tonne net smelter return cut‑off translates to 0.46% CuEq; material above this could be mined.

  • Metallurgical Work:

  • All drill core from the eleven 2025 holes is being used for flotation studies by Blue Coast Research (BC, Canada) to refine flowsheet and recoveries.

  • Technical Details:

  • Drilling performed by Discovery Drilling using a Boyles 56 rig; HQ core sampled and analyzed at ALS Chemex (Johannesburg).
  • Quality control includes blanks and certified Cu/Ni sulphide standards every 20 samples.

  • Qualified Person: Sharon Taylor, VP Exploration, reviewed and approved the technical information per NI 43‑101 / Reg S‑K.

Notable Quotes

“The takeaway from this metallurgical drilling program is the sizable, mineralized continuity across this deposit… Selkirk is increasingly demonstrating its potential as a significant additional value driver for NexMetals.” – Morgan Lekstrom, CEO & Director


All non‑material boilerplate, forward‑looking statements, and company background have been omitted for brevity.

Read the original news release →

More from NexMetals Mining Corp.