Executive Summary
- LaFleur Minerals filed an NI 43‑101 technical report detailing its PEA for the Swanson Gold Deposit and the fully‑permitted Beacon Gold Mill.
- The PEA projects a 65% after‑tax IRR, C$101 million NPV (5% discount) and an AISC of US$1,569/oz, based on a base‑case mill throughput of ~1,250 t/day with expansion potential to 3,000–4,000 t/d.
- The study confirms no material differences from the company’s March 3, 2026 news release and outlines next steps: engineering studies, bulk sampling, further metallurgical testing, resource‑expansion drilling, and permitting work toward a production decision.
Key Details
- Technical Report: “Swanson Gold Project – Preliminary Economic Assessment of Delivering Swanson Deposit Mineralized Material to the Beacon Mill” prepared by ERM Consultants Canada Ltd.; dated March 27 2026, effective March 16 2026.
- Qualified Persons: James Gardner, P.Eng. (Principal Consultant, ERM) and Louis Martin, P.Geo. (Exploration Manager, LaFleur) signed off the technical information.
- Economic Highlights:
- After‑tax IRR: 65%
- NPV (5% discount): C$101 million
- AISC: US$1,569/oz (base case) – US$2,750/oz gold price scenario also modeled.
- Production Scenario:
- Base‑case mill throughput: ≈1,250 t/day (current capacity 750 t/d, with refurbishment).
- Expansion potential to 3,000–4,000 t/day in longer‑term scenarios.
- Expected free cash flow generation at the US$2,750/oz gold price base case.
- Infrastructure:
- Beacon Gold Mill fully permitted, recently refurbished; replacement cost independently valued at US$71 million.
- Tailings facility also fully permitted.
- Utilizes existing road access and potential rail links for material transport from Swanson (≈60 km).
- Project Scope:
- District‑scale land package: 19,214 ha in the Abitibi Gold Belt, containing multiple gold zones (Swanson, Bartec, Jolin).
- Planned initial bulk sample: 100,000 t to validate processing assumptions.
- Next Steps Post‑PEA:
- Advance detailed engineering and optimization studies.
- Conduct additional metallurgical testing and resource expansion drilling at Swanson.
- Pursue permitting and infrastructure work for bulk sampling and future mining.
- Move toward a definitive production decision for the Swanson Deposit using the Beacon Mill.
- CEO Quote: “The filing of our PEA technical report marks a significant milestone… we are well positioned to transition into a gold producer and generate near‑term revenue, with additional scalability and operational flexibility that differentiate us from many junior developers.” – Paul Ténière, CEO & Director
Notable Quotes
- Paul Ténière, CEO & Director: “The filing of our PEA technical report marks a significant milestone for LaFleur Minerals as we advance toward near‑term gold production… we believe the Company is well positioned to transition into a gold producer and generate near‑term revenue…”